Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Notice of Exemption for Santa Cruz Gardens Elementary School Field, Track, and Amphitheater Project(4465404.1) (1)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Santa Cruz Gardens Elementary School Field, Track, and Amphitheater Project is a local public works initiative led by the Soquel Union Elementary School District in Santa Cruz, California, aimed at upgrading school grounds with artificial turf, a running track, a scoreboard, an amphitheater, a new parking lot, and a fire access road, along with related grading, landscaping, and utility improvements. The project does not increase school capacity and is designed to enhance safety, accessibility, and community use of the facility. Environmental review was completed under the California Environmental Quality Act (CEQA), with the agency determining eligibility for multiple categorical exemptions including Class 1 (minor land alterations), Class 2 (replacement of existing facilities), Class 3 (construction of small structures), Class 4 (minor land changes), Class 11 (accessory structures), Class 14 (school improvements within existing capacity), and Class 23 (normal operations for public gatherings), which collectively justify the exemption from a full environmental impact report. The project is located at 8005 Winkle Ave, Santa Cruz, CA 95065, and was publicly noticed on January 15, 2026, through CEQAnet as a forecast and exemption notice rather than a formal solicitation or contract. There is no identified contract value, pricing structure, delivery schedule, or performance period, and no federal acquisition regulations or contract clauses apply, as the initiative is purely state and locally governed. No formal procurement process, contract type, or solicitation number exists in the documentation; instead, the project operates under California’s CEQA exemption framework, with administrative oversight provided by the Soquel Union Elementary School District. The primary contact for the project is Pam Crum, Bond & Facility Manager, with Alison Warner, Assistant Superintendent for Business Services, serving as the lead agency representative. There are no specifications for inspection criteria, packaging, invoicing methods, payment offices, contracting officers, technical representatives, or offeror certifications, and no financial estimates or cost data are available. The project is not subject to federal acquisition requirements such as FAR, DFARS, WAWF, or other procurement systems, and all documentation is focused on environmental compliance and notification rather than competitive bidding, contract administration, or performance contracting. Submission of the exemption notice occurred through CEQAsubmit/CEQAnet, with no formal proposal, bid, or response process required, and no deadlines or evaluation criteria were established because the action qualifies as a statutory exemption requiring no competitive procurement.

General Info

Santa Cruz school upgrades turf, track, amphitheater, parking, and road under CEQA exemptions without formal contract or bidding.

Agency

California → Soquel Elementary School District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Santa Cruz, CA, 95065

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Santa Cruz Gardens Elementary School Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Soquel Elementary School District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Soquel Elementary School District
Office AddressN/A
Contacts
Pam CrumBond & Facility Manager

Full Description

Show more
Santa Cruz Gardens Elementary School Field, Track, and Amphitheater Project(4465404.1) (1)

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details