CORNING WATER DISTRICT WATER SERVICE CONNECTION PROJECT
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Corning Water District Water Service Connection Project involves the construction of a 700 linear foot water service line to connect an existing customer to the Corning Water District’s system, enabling access to surface water when available as part of broader efforts to achieve groundwater sustainability in the Corning Subbasin under DWR Bulletin 118. The project is classified as ministerial and exempt from CEQA review under Class 1 and Class 4 categorical exemptions, indicating no significant environmental impact from minor improvements to existing facilities. It is being administered by the Tehama County Flood Control and Water Conservation District, located in Red Bluff, California, with Justin Jenson serving as the primary point of contact. No federal contract clauses, evaluation factors, pricing structures, or formal contracting vehicles such as FFP or IDIQ are specified, and the project does not include standard procurement elements like CLINs, solicitation numbers, or formal acquisition documentation. The only financial transactions noted relate to administrative fees, such as a $50 county documentary handling fee and a $1,401.75 CRP filing fee, which are not part of the contract value. The place of performance is the Corning Subbasin in Tehama County, California, with coordinates provided, though no delivery schedule, FOB terms, inspection protocols, quality standards, or packaging requirements are formally defined. The project relies on state-level environmental exemptions rather than federal procurement procedures, with no representations, certifications, or compliance requirements from FAR Part 52 present. Submission of required documents such as the Notice of Exemption and CDFW No Effect Determination is necessary, but no formal competitive solicitation, proposal deadlines, evaluation criteria, or award methodology are established. The project proceeds as a local government initiative with streamlined environmental compliance and no formal federal contracting structure.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
