This Solicitation opportunity from Department Of Energy was posted on August 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

COTP RIVER CROSSING TOWER PAINTING PROJECT

Closed
89503326QWA000398Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238320
New
SLED
Paint All Exterior and Common Area Doors, Buildings 4166, 4167, 4168 & 3673
Solicitation # N400857606105
Solicitation N400857606105 is for a project at MCAS Cherry Point, North Carolina, focused on the cleaning, preparation, priming, and painting of approximately 800 exterior and common-area doors, frames, vents, and louvers across Buildings 4166, 4167, 4168, 4169, and 3673. Additionally, the scope includes refinishing approximately 2,350 linear feet of handrails at Building 3673. The contractor must provide all labor, materials, and supervision to ensure a uniform, durable finish, with specific requirements to paint common area and storage doors on both sides and residential doors on the corridor-facing side only. All work must be completed within 180 calendar days after the award. The contract will be awarded based on the lowest price, and the successful offeror will be issued a task order under MACC Contract N4008525D. Proposals are due by September 18, 2026. Bonding requirements vary by proposal amount: no bonds for amounts up to 35,000 dollars, a payment bond for amounts between 35,001 and 150,000 dollars, and a bid, payment, and performance bond for amounts exceeding 150,000 dollars. The project is subject to the Davis-Bacon Act and Buy American requirements, with a minimum wage of 13.65 dollars per hour for covered workers. A Quality Control Manager is required to oversee the project and ensure all surfaces are free of defects such as rust, peeling, or runs.
Bristol Alliance of Companies

POSTED

about 14 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The COTP River Crossing Tower Painting Project is a federal solicitation issued by the Western Sierra Nevada Region of the Department of Energy under solicitation number 89503326QWA000398, with a submission deadline of August 4, 2026. The work involves comprehensive corrosion remediation and re-coating of eight transmission towers located at the Sacramento River and San Joaquin River crossings, requiring full surface preparation, coating application, and replacement of structural hardware and lighting components. The contractor must furnish all labor, materials, equipment, and supervision to complete the project within 180 calendar days after receiving the Notice to Proceed, which must be initiated within 10 days of issuance. The solicitation is structured as a sealed bid (IFB) with a Lowest Price Technically Acceptable (LPTA) evaluation method, where technical acceptability is a pass/fail threshold determined by demonstrated experience with comparable high-voltage transmission tower painting projects and possession of a current SSPC-QP 2 certification. The contract mandates strict compliance with a broad array of federal regulations and standards, including OSHA, EPA, NESC, ASTM, and SSPC, and requires adherence to DOE-specific safety, environmental, and administrative protocols. Key compliance obligations include a written Code of Business Ethics, whistleblower protections, cybersecurity safeguards per NIST SP 800-171, prohibition of debarred subcontractors, and affirmative small business subcontracting under FAR 52.219-9. The contractor must also maintain active SAM.gov registration, comply with DEI non-discrimination requirements under FAR 52.222-90, and adhere to Davis-Bacon wage rates for California. All invoices must be submitted electronically via the Treasury’s Invoice Processing Platform (IPP), and no paper submissions are accepted. Proposals must be submitted as hard copies—no electronic files are permitted—and must include a technically compliant section limited to five pages detailing at least three relevant past projects, along with a price quote containing a bid guarantee and bonding costs. The Contracting Officer is Jolene Daoud, with William (JR) Hamby serving as the Contracting Officer’s Representative, both located in Folsom, California. The work site is a high-risk operation requiring enhanced safety practices under DOE 10 CFR 851 and WAPA-specific protocols, and the contractor must carry minimum insurance coverage including $500,000 in bodily injury liability and

General Info

Federal painting contract for river crossing tower, due July 28, 2026, via FedConnect.

Agency

Department Of Energy → Western Sierra Nevada RegionView Agency

NAICS

238320 - Painting and Wall Covering ContractorsView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

(16)

Solicitation 89503326QWA000398 COTP River Crossing Tower Painting Project

PDFrfq

WAPA Special Purpose Condition Assessment 171-3

PDFspecial-purpose-condition-assessment

COTP River Crossing Tower Painting Submittal List

XLSXsubmittal-list

WAPA COTP Olinda-Tracy 500kV Line Special Purpose Condition Assessment Report 10552

PDFspecial-purpose-condition-assessment

Special Purpose Condition Assessment for Structure 172-1 WAPA

PDFspecial-purpose-condition-assessment

Davis-Bacon Act Wage Determination CA20260018 San Joaquin 05-18-2026

PDFwage-determination

Special Purpose Condition Assessment - Structure 171/4 WAPA May 21 2025

PDFspecial-purpose-condition-assessment

WAPA Special Purpose Condition Assessment for Structure 168/2

PDFspecial-purpose-condition-assessment

Davis-Bacon Act Wage Determination CA20260007 Sacramento 5-18-2026

PDFwage-determination

WAPA Special Purpose Condition Assessment 171/2 - May 21 2025

PDFspecial-purpose-condition-assessment

WAPA Special Purpose Condition Assessment for Structure 168/1

PDFspecial-purpose-condition-assessment

Special Purpose Condition Assessment - WAPA Tower 167/3

PDFcondition-assessment

COTP River Crossing Tower Painting Construction Specifications

PDFspecifications

Appendix J - COTP River Crossing Tower Drawings

PDFother

Attachment 5 Subcontracting Plan Template rev 6-6-24

DOCXsubcontracting-plan

Special Purpose Condition Assessment WAPA Tower 167-2 May 22 2025

PDFspecial-purpose-condition-assessment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Western Sierra Nevada Region
Contacts1 person available
OfficeFolsom, CA, 95630-4710, USA
Organization / Agency
Department Of Energy → Western Sierra Nevada Region
View Agency Profile
Office AddressFolsom, CA, 95630-4710, USA
Contacts
Jolene DaoudContracting Officer

Full Description

Show more
COTP RIVER CROSSING TOWER PAINTING PROJECT

More opportunities from Department Of Energy → Western Sierra Nevada Region

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS