Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on July 19, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Counter Threat Network Tactics and Procedures

Closed
FA2517-12-D-9000-0018Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Fire Alarm engineering for Lewis County
Solicitation # 2026-RFQ-040
Lewis County is soliciting qualifications under solicitation 2026-RFQ-040 for a professional engineering firm to provide comprehensive design and engineering services for fire alarm systems. The project encompasses several County-owned facilities, including the IT Building, Historic Courthouse, Health Building, and Lewis County Jail. The selected firm will be responsible for conducting on-site evaluations to determine the remaining useful life of existing systems, assessing code compliance with NFPA 72, IBC, and IFC standards, and developing bid-ready construction drawings and technical specifications. All designs must be stamped by a licensed electrical engineer familiar with Washington State fire alarm requirements and must integrate smoothly with existing infrastructure to ensure standardized maintenance and operations. Proposals are due by November 10, 2026, via the OpenGov platform and will be evaluated by a committee of at least three County employees using a points-based system. The evaluation criteria are equally weighted at 20 percent each across four categories: firm qualifications (including NICET certifications and licensed engineer availability), responsiveness and capacity to begin work within 30 days, regulatory compliance and permitting records, and the clarity and detail of blueprint designs. Applicants must provide a statement of qualifications, three public agency references from the last five years, and resumes of key personnel. The contract is administered by Matt Patana, Capital Infrastructure Specialist, based in Chehalis, Washington.
Capital Infrastructure

POSTED

about 18 hours ago

DEADLINE

in 21 days

General Info

NAICS

541330 - Engineering Services

Place of Performance

HQ, JTF-N/J3 Bldg. # 11603 Old Ironsides Road Fort Bliss, TX 79918, Ft Bliss, TX, 79918, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Sources Sought

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA2517 21 Cons Bldg 350
Contacts1 person available
OfficePETERSON SFB, CO, 80914-1117, USA
Office AddressPETERSON SFB, CO, 80914-1117, USA
Contacts
James A KnightContracting Officer

Full Description

Show more
FAIR OPPORTUNITY EXCEPTION (FOE) JUSTIFICATION I. Contracting Activity A. Agency: Department of Defense, Joint Task Force - North B. Contracting Activity: 21 CONS/LGCC, Peterson AFB, CO C. Justification Type: The order must be issued on a sole-source basis in the interest of economy and efficiency because it is a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order. II. Nature and/or Description of the Action Being Approved This is a modification as a follow-on to task order FA2517-12-D-9000-0018 extending the period of performance by one year. III. Description of the Supplies/Services Required To Meet the Agency's Needs The contractor shall perform performance based services for Counter Threat Network Tactics and Procedures Support (CTNTPS) providing facilitation and necessary services to perform technical analyses and assessments for Southwest Border (SWB) Counter Transnational Organized Crime (C-TOC) Working Group Events (5 days). The corridors considered for areas of focus include (Los Angeles. and San Diego Regional Command Mechanism, California, Arizona Alliance to Combat Transnational Threats (ACTT), NM/West Texas ACTT, South Texas Campaign, Caribbean Border Inter-Agency Group (CBIG) and North-East Support) and will be defined specifically at the subtask. These periodic 5 day events involve preparation before, and reporting analysis following each event. These services are required beginning 1 August 2016 for one year supporting Joint task Force - North (JTF-N). This requirement is an extension of the current effort awarded competitively to Intecon, LLC under TA2S IDIQ Task Order FA2517-12-D-9000-0018. The Performance Work Statement (PWS) was revised to incorporate alternate locations for future events. IV. Authority Permitting a Fair Opportunity Exception FAR 16.505(b)(1)(i) requires the Contracting Officer to provide each awardee under a multiple award contract, a fair opportunity to be considered for each order exceeding $3,000 unless a statutory exception applies. The specific exception that precludes the fair opportunity process for this acquisition is FAR 16.505(b)(2)(i)(C). V. Demonstration of the Contractor's Unique Qualifications or Nature of the Acquisition Requires the Use of the Authority Cited Above to Provide the Required Supply/Service (Applicability of Authority) FAR 16.505(b)(2)(i)(C), "The order (modification) must be issued on a sole-source basis in the interest of economy and efficiency as a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order." Joint Task Force - North states the extension of CTNTPS is necessary to build upon the previous successes of these events and culminate in the next year with events that will cement lasting relationships with the numerous law enforcement agencies. The new Department of Homeland Security (DHS) Joint Task Force East, Joint Task Force West, and Joint Task Force Investigations (JTF-E, JTF-W, JTF-I) have requested this capability to further make their operations more effective by synchronizing efforts across the law enforcement community in the Counter Transnational Organized Crime (C-TOC) environment. To compete a requirement for this one year period is not practical when considering the expense and risk involved. To issue a modification extending the current Intecon Task Order of the same effort would eliminate the expense to any prospective contractor establishing support for this short period of time. The rates offered by Intecon are expected to reflect rates previously competed when this initial Task Order was awarded resulting in a fair and reasonable price to the government. Additionally, JTF-N cannot say with assurance that they will require the entire one year extension to receive all four priced events. For this reason, the Clause DFARS 252.232-7007 Limitation of the Government's Obligation will be incorporated which will allow early termination of this task order should funds not be available to continue. Intecon has indicated that no termination costs would be expected should the government cease funding the effort, and terminate the task order under DFARS 252.232-7007. Further, the time and effort which would be expended by both the government and a perspective contractor to compete this effort would not yield any further savings or advantages to the government. On the contrary, competing this short extension would invite unnecessary risk through a delayed competitive award. Therefore, in the interest of economy and efficiency, the decision not to compete this effort and instead negotiate a 12-month duration modification to the task order FA2517-12-D-9000-0018 as a logical follow-on is in the best interest of the government. VI. Description of Efforts Made To Ensure Competition Between All Awardees In accordance with FAR 16.505(a)(1) orders under indefinite-delivery contracts do not have to be synopsized. Paragraph V above justifies why competition among all awardees is not suitable for this acquisition. Offering this short term requirement to be competed amongst both TA2S contractors was considered, but was not deemed appropriate given the indeterminate and short length of the period of performance. VII. Determination by the Contracting Officer That The Anticipated Cost to the Government Will Be Fair and Reasonable As stated in Paragraph V above, the rates offered by Intecon are expected to reflect rates similar to those previously competed when this initial Task Order was awarded resulting in a fair and reasonable price to the government. VIII. Description of Market Research Conducted Among All Awardees and the Results Or A Statement of the Reason Market Research Was Not Conducted No formal market research was conducted to conclude the exception at FAR 16.505(b)(2)(i)(C) should be applied. The previously competed award of Task Order FA2517-12-9000-0018 to Intecon, LLC. established a two year effort which now needs to be extended. The four events planned in the period of performance build upon the successes of the previous two years. To attempt a competitive award IAW FAR 16.505(b)(1) for this short duration would unnecessarily disrupt the work effort currently being provided and would not capitalize on the knowledge garnered during the previous two years. IX. Other Facts Supporting the Justification N/A X. List of Any Awardee That Expressed Interest in the Acquisition No other contractors expressed interest in this acquisition. XI. Actions the Agency May Take to Remove or Overcome Any Barriers To Increasing Fair Opportunity Before Any Subsequent Acquisition For the Supplies or Services At the conclusion of this Task Order, no further acquisition is expected to support this requirement. XII. Contracting Officer's Certification The contracting officer's signature on the signature page evidences that he/she has determined this document to be both accurate and complete to the best of his/her knowledge and belief. XIII. Technical/Requirements Personnel's Certification As evidenced by their signatures on the signature page, the technical and/or requirements personnel have certified that any supporting data contained herein which is their responsibility is both accurate and complete.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS