Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from International Boundary And Water Commission: Us-Mexico was posted on June 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Country Club west Stoplog Rehabilitation

Closed
FY4201010Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 8 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 9 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The United States Section of the International Boundary and Water Commission is seeking sealed bids for the rehabilitation of the west stoplog foundation at the Country Club Bridge near Sunland Park in El Paso County, Texas. The project involves installing a new expansion joint and repairing deteriorated concrete to restore structural movement, prevent further damage, and ensure a safe bridge approach. Key tasks include mobilization and demobilization, traffic control permitting and implementation, removal of old joint materials, installation of new filler, backer rod, and sealant, concrete repair, debris disposal, and final site cleanup. The work is categorized under NAICS Code 237990 and will be executed under a firm-fixed price contract with an estimated value between $25,000 and $100,000. All work must be completed within 90 calendar days after the Notice to Proceed, with final closeout paperwork due within 30 days of construction completion. Although the anticipated actual construction duration is about two weeks, the timeline is contingent upon securing traffic control permits from the City of El Paso and TxDOT due to the bridge’s high traffic volume. The project site is located at approximately 31.846400, -106.606524 in El Paso, Texas, and a mandatory site visit will be scheduled as outlined in the solicitation. This is a total small business set-aside solicitation, with the presolicitation notice posted on June 25, 2026, and responses due by July 10, 2026. The full solicitation, including plans and specifications, is expected to be available by July 10, 2026, and will remain accessible for at least 30 days. Point of contact for inquiries is Philip Johnson at [email hidden] or [phone hidden].

General Info

Rehabilitate west stoplog foundation at Country Club Bridge with new expansion joint and concrete repair, firm-fixed-price, small business set-aside.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

El Paso, TX, 79902, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyInternational Boundary And Water Commission: Us-Mexico → Internat Boundary And Water Commission
Contacts2 people available
OfficeEl Paso, TX, 79902, USA

Full Description

Show more


 The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation (sealed bid) for the purpose of repairing the Country Club Bridge west stoplog foundation located near Sunland Park in El Paso County, Texas.


The project generally consists of installing a new expansion joint and repairing deteriorated concrete at the stoplog structure. The proposed repairs will restore movement between the roadway and stoplog foundation structure, reduce further deterioration, and maintain a safe and serviceable bridge approach. Construction activities will require traffic control measures including lane or full closure and coordination with local agencies to maintain safe traffic operations during construction.


Major Tasks Include:


1. Mobilization and demobilization.


2. Traffic control permitting, implementation and maintenance.


3. Sawcutting and removal of existing expansion joint materials.


4. Installation of new expansion joint filler, backer rod, and sealant.


5. Repair of deteriorated and spalled concrete surfaces.


6. Disposal of removed materials and construction debris.


7. Final cleanup and closeout activities.



Project Location


Country Club Rd Bridge, West Levee


Approximate Coordinates:


31.846400, -106.606524


Per FAR 36.204, the magnitude of the project is estimated between $25,000 and $100,000.


The work is located in El Paso, Texas. A site visit date will be listed in the Solicitation. The work will be performed under NAICS Code 237990. The Contract will be firm-fixed price.


The anticipated actual construction duration is approximately two (2) weeks. However, a traffic control permit requires City of El Paso and TxDOT approval for work on the heavily trafficked Country Club Rd.


All work shall be completed within ninety (90) calendar days after the Notice to Proceed. The final paperwork for closeout of the Contact shall be completed within thirty (30) calendar days of completion of construction. The time stated for completion shall include final cleanup of the premises.


The Solicitation, plans, and specifications are expected to be posted on or about 10 July 2026 (this is a target date which may slip or change). The Solicitation will be available for a minimum of thirty (30) calendar days.


This is a Presolicitation Notice. The Solicitation will include information on how to obtain the

More opportunities from International Boundary And Water Commission: Us-Mexico → Internat Boundary And Water Commission

Same awarding agency

NAICS: 221320
Federal
Operations and Maintenance (O&M) Services for the SBIWTP
Solicitation # 191BWC26R0009
Solicitation 191BWC26R0009, issued by the International Boundary and Water Commission, seeks a contractor to provide Firm Fixed Price Operations and Maintenance (O&M) services for the South Bay International Wastewater Treatment Plant (SBIWTP) in San Ysidro, California. The contract is structured with a base year running from June 1, 2027, to May 31, 2028, and multiple option years extending through May 2031. A primary objective of the scope is managing plant operations, SCADA systems, and maintenance during the facility's expansion from 25 MGD to 50 MGD. The contractor must ensure 24/7 staffing, including a bilingual operator, and maintain strict compliance with the National Pollutant Discharge Elimination System (NPDES) permit and other regional water quality board regulations. Award will be based on the Highest Technically Rated with a Fair and Reasonable Price method, where non-price factors—such as plant operations, permit compliance, and staffing—are significantly more important than cost. Key requirements include the designation of a Project Manager, Superintendent, Site Safety and Health Officer, SCADA Specialist, and Asset Manager. The contractor is responsible for a wide array of deliverables, including a Phase-In Plan, Preventative Maintenance Plan, and monthly performance reports. Security is a high priority, requiring background investigations for personnel and adherence to NIST standards for protecting Controlled Unclassified Information. Performance will be monitored via a Quality Assurance Surveillance Plan focusing on regulatory compliance, uptime, and effluent quality.
Sewage Treatment Facilities

POSTED

8 days ago

DEADLINE

in 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS