Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

County of Grande Prairie No. 1 - Invitation to Bid - Hythe Recreational Facility Waterworks Improvements

Active
AB-2026-06819International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The County of Grande Prairie No. 1 is seeking bids for the Hythe Recreational Facility Waterworks Improvements project. The scope of work centers on the installation of a prefabricated, containerized water treatment plant supplied by Flowpoint Environmental Systems. The successful contractor will be responsible for offloading and leveling the unit on a helical pile foundation, preparing a gravel parking area, and completing all external connections, including electrical service, heat tracing, drainage, and SCADA integration. Additional requirements include the installation of a submersible pump for a new artesian well, the placement of point-of-use treatment equipment in the Hythe Arena, and the installation of raw and potable water distribution piping via horizontal directional drilling. The contractor must also manage sanitary sewer connections, decommission four existing water supply wells according to Alberta regulations, and restore all impacted surfaces and landscaping. The project concludes with full system commissioning and a two-year warranty period.

General Info

Contractor to install water treatment plant, artesian well, and piping for Grande Prairie.

Place of Performance

County of Grande Prairie No. 1, AB, CAN

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCounty of Grande Prairie No. 1
Contacts1 person available
OfficeN/A
Organization / AgencyCounty of Grande Prairie No. 1
Office AddressN/A
Contacts
Craig AllisonProject Manager

Full Description

Show more
1.4 WORK COVERED BY CONTRACT DOCUMENTS .1 Work of this Contract comprises of the following: .1 The installation of a modular / prefabricated water treatment plant and pipework connections between the new treatment plant, a new well, existing buildings and a splash park. The modular / prefabricated water treatment plant will be supplied by Flowpoint Environmental Systems who will deliver the unit to site. .2 The scope of work also includes the supply and installation of new water distribution piping and fittings via directional drilling, sanitary sewer connections via open trench excavation, backfilling, and surface restoration. The abandonment / decommissioning of four existing water supply wells in accordance with local applicable requirements is also included within this scope of work. .3 As indicated above, the process and mechanical scopes of work encompasses the installation of a packaged water treatment plant / building supplied by Flowpoint Environmental Systems, which will be delivered to site as a complete factory-fabricated containerized unit. The successful bidder will be responsible for offloading, setting, and levelling the building on a helical pile foundation, and the completion of all external connections including process piping, drainage, electrical service, heat tracing, and controls integration. Additional process scope includes supply and installation of a submersible well pump for a new artesian well, stainless steel process piping and fittings, sanitary process piping, pitless adapters, and point-of-use water treatment equipment inside the Hythe Arena. .4 The successful bidder will be responsible for commissioning and the provision of a fully operational system upon completion of the scope of work, which will be covered by a 2-year warranty period. Roles and responsibilities between the successful bidder and Flowpoint Environmental Systems are specified within the contract documents, with Flowpoint Environmental Systems providing warranty services to the County directly for their scope of supply. .2 The deliverables include but are not limited to .1 Offload, set, and level the Flowpoint Environmental Systems factory-fabricated containerized water treatment plant building on a helical pile foundation. .2 Prepare gravel parking area at the water treatment plant building. .3 Supply and install all external connections to the water treatment plant building including piping, drainage, electrical service, heat tracing, and controls integration. .4 Integrate containerized water treatment plant with County’s SCADA. .5 Supply and install a submersible well pump, pitless adapter, level transmitter, and all associated piping and electrical connections for a new artesian well supply to containerized water treatment plant. .6 Supply and install new raw and potable water distribution piping and fittings, via horizontal directional drilling methods. .7 Supply and install sanitary sewer connections. .8 Install point-of-use water treatment equipment inside the Hythe Arena. .9 Abandonment / decommissioning of four existing water supply wells in accordance with applicable Alberta requirements. .10 Restore all surfaces, structures and landscaping impacted by the new construction activities. .11 Provide required testing and commissioning of the new infrastructure to ensure it functions as intended, meets performance requirements, and is ready for operational use.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open-cut installation of PVC and DIP sewer lines ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, a CSO regulator fit out, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional project deliverables include the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass for all pipes and manholes during construction. General project requirements include clearing and grubbing of wooded areas, seeding, fine grading, and select tree removal. Due to the project location and nature, contractors must provide railroad insurance. The bid schedule further accounts for extra depth excavation and the abandonment of existing pipes and manholes. All inquiries and quotations should be directed to John Connelly at Cleary Construction.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of 16,690,000 dollars. The scope of work involves the installation of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the construction of a new wet well and valve vault, the demolition of existing pumps and piping, and the delivery of a fully operating facility equipped with mechanical and electrical systems, a generator, odor control equipment, and stormwater facilities. The project also requires associated site work, including exploratory drilling, rock excavation, and grading. The contract is governed by EJCDC standard general and supplementary conditions, with technical specifications spanning divisions 00 through 44. Award will be granted to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and adherence to submission requirements. Bidders must provide a signed bid form, bid security, and mandatory MWBE documentation, including a Good Faith Efforts Form and Table A, to meet participation goals of 10.9 percent for EPA MBE and 10 percent for the State of North Carolina. Contract administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with a 30-day payment term following the engineer's recommendation.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 11 days
View Details

More opportunities from County of Grande Prairie No. 1

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS