Courtesy Posting - Provo City School District - Dixon Site Demolition

Closed
PCSD06242026State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
Construction On State Highway In Santa Barbara County Near Buellton At Various Locations From 3.6 Miles North Of Route 1/101 Separation To 1.3 Miles South Of Route 101/246 Separation
Solicitation # 05-1K4514
The California Department of Transportation (Caltrans) is soliciting bids for contract 05-1K4514, which involves landscape planting and erosion control on a State Highway in Santa Barbara County near Buellton. The project scope covers various locations from 3.6 miles north of the Route 1/101 separation to 1.3 miles south of the Route 101/246 separation. The estimated project cost is 480,000 dollars, and bids must be submitted on a unit price basis via the Bid Express website by 2:00 p.m. on November 18, 2026. The project timeline is divided into two phases: general construction must be completed within 40 working days, while plant establishment work is allotted 750 working days, bringing the total project duration to 790 working days. A minimum of 79,000 dollars must be allocated for plant establishment work. The contract includes a 5 percent Disabled Veteran Business Enterprise (DVBE) goal and specific Small Business Enterprise (SBE) participation requirements. Bidders must provide security equal to at least 10 percent of the bid and submit a subcontractor list and certification status at the time of bidding. Compliance requirements include adherence to 2025 Standard Specifications and Standard Plans, as well as prevailing wage rates determined by the California Department of Industrial Relations. Quality assurance requires QC personnel to hold ACI Concrete Field-Testing Technician Grade 1 certification. Additionally, the contractor must provide environmental product declarations for hot mix asphalt and concrete and follow specific marking requirements for temporary concrete barriers. Final acceptance is contingent upon the submission of a Final Report on the Utilization of Small Business Enterprise within 10 days of contract acceptance.
California Department of Transportation (Caltrans)

POSTED

about 2 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

This contract involves the demolition of the existing Dixon Middle School located at 750 200 N, Provo, Utah. The project requires the complete site and building demolition and is managed by Westland Construction on behalf of the Provo City School District. A mandatory site walk is scheduled for June 16th at 1:00 PM MST, ensuring all interested parties have the opportunity to assess the site before submitting bids. Requests for information (RFIs) must be submitted by June 17th at noon to Clint Halford via email. Bids are due by June 24th at 12:00 PM and should also be sent to Clint Halford. The project is expected to begin on July 6th and be completed by August 14th. This timeline highlights a relatively short demolition window, emphasizing the need for timely and efficient work. The solicitation is posted by the Utah agency, with detailed communication directed through the specified contact. The project number for reference is PCSD06242026, and all relevant documentation and submission will be managed through the online portal provided by the Utah government.

General Info

Demolition of Dixon Middle School in Provo, bids due June 24, project starts July 6.

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

1

2026-06-10 Dixon Elem Demo Set

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah
Contacts1 person available
OfficeUT, USA
Organization / AgencyUtah
Office AddressUT, USA

Full Description

Show more
Details of the project:
Site and building demolition of the existing Dixon Middle School located at 750 200 N, Provo, UT 84601
Mandatory site walk will be on June 16th at 1:00 PM MST.
RFI’s will be due June 17 at 12:00 PM. Send RFI’s to Clint Halford at Clint@westlandconstruction.com
Bids will be due to Westland Construction on June 24th at 12:00 PM to Clint Halford at Clint@westlandconstruction.com
Expected start date July 6th
Expected finish date August 14th

More opportunities from Utah

Same awarding agency

NAICS: 237110
New
SLED
Rose Park Golf Course Irrigation and Turf Reduction / Nibley Park Golf Course Irrigation
Solicitation # PRK23041 / PRK26019
The Salt Lake City Department of Public Services is seeking prequalified contractors for irrigation and infrastructure upgrades at Rose Park Golf Course and Nibley Park Golf Course under solicitation numbers PRK23041 and PRK26019. The scope of work includes the demolition and removal of existing irrigation laterals and heads without disturbing playable turf, the installation of new mainlines, laterals, and heads, and the construction of a two-staged settling pond with clay sealed liners. Additionally, the project requires the installation of a new pump station, wet well, and corresponding piping, as well as electrical equipment and wiring. At Nibley Park, the existing manual irrigation system will be replaced with an automatic system and a new factory-built booster pump station. The estimated value for the work is approximately 6,000,000 dollars for Rose Park and 2,600,000 dollars for Nibley Park. Both courses must remain operational and occupied throughout construction, except within active work phases. To prequalify for bidding, contractors must achieve a minimum score of 75 out of 100 points based on evaluation factors including project experience (40 points), key personnel experience (30 points), and project management approach (30 points). A pass/fail assessment is also conducted regarding safety, training, and certifications. Applicants must provide a Utah State Contractor License, certify at least four years of business longevity, and provide a bonding agent certification letter. Submissions must be made electronically via the Bonfire portal by the specified deadline. The prequalification process is the first step toward separate bidding phases tentatively scheduled for November 2026 for Rose Park and January 2027 for Nibley Park.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 15 days
View Details
NAICS: 115112
New
SLED
AS27-123 Central Utah Aerial Seeding Project Phase 1 - 2026
Solicitation # AS27-123
The State of Utah Division of Purchasing and the Division of Wildlife Resources are seeking a single contract award for the Central Utah Aerial Seeding Project Phase 1 - 2026. This Invitation for Bids aims to secure a responsive and responsible vendor to perform aerial seeding across three specific project areas: the Widemouth 2 Fire Rehab Project Phase I (3,964 acres), the Watts Mtn Phase II Project (2,210 acres), and the Tower Fire Aerial Seeding Project (206 acres), totaling 6,380 acres. The performance period is strictly scheduled from November 4, 2026, through November 16, 2026. Bids must be submitted on a cost-per-acre basis, and the award will be granted to the lowest total cost responsive and responsible vendor. Technical requirements mandate that aircraft be equipped with GPS for 100% coverage and maintain a maximum 80-foot seeding swath width to prevent stripping. The use of drones is strictly prohibited, and operations must be postponed if wind speeds exceed 10 miles per hour. Upon completion, the contractor must provide electronic coverage documentation in UTM projection North America Datum 1983. The contractor is responsible for securing flight operations from airports in Redmond, Fillmore, or Richfield, Utah. Administrative requirements include maintaining Commercial General Liability insurance with limits of $1 million per occurrence and $3 million aggregate, as well as statutory Workers' Compensation. Vendors must certify compliance with E-Verify, anti-boycott laws regarding the State of Israel, and various non-discrimination statutes. Invoices must be submitted within 30 days of delivery and will be paid within 30 days of receipt of a correct invoice. The State Entity reserves the right to inspect deliverables within 30 days of delivery to ensure conformity with the specified standards before final acceptance.
Soil Preparation, Planting, and Cultivating

POSTED

3 days ago

DEADLINE

in 7 days
View Details
NAICS: 115112
New
SLED
Cherry Fire Aerial Seeding
Solicitation # CS27-114
The State of Utah Division of Purchasing, on behalf of the Division of Wildlife Resources, is soliciting quotes for aerial seeding services for the Cherry Fire project in Tooele County. The scope of work involves the application of a seed mix consisting of grasses, shrubs, and forbs across 4,651 total acres at elevations between 5,700 and 6,700 feet. Specifically, the contractor must apply seed at a rate of 12 lbs/acre over 704 acres of TLA lands and 18 lbs/acre over 3,947 acres of private lands. All work must be completed by November 11, 2026. Technical requirements include the use of GPS technology to ensure 100% coverage and a requirement to begin seeding by 8:00 a.m. to minimize drift, with the government reserving the right to postpone operations if wind speeds exceed 10 miles per hour. The contract will be awarded to the responsive and responsible vendor submitting the lowest cost, with bids required on a cost-per-acre basis. Selected vendors must maintain Commercial General Liability insurance of at least $1 million per occurrence and $3 million aggregate, as well as statutory Workers' Compensation insurance. Administrative terms specify that deliveries are F.O.B. Destination Freight Prepaid and Allowed, with a 30-day window for the state to accept or reject deliverables. Invoices must be submitted within 30 days of delivery, and payments are due within 30 days of invoice execution. Contractors must also comply with the Utah Government Data Privacy Act and certify compliance regarding anti-boycott actions, forced labor restrictions, and E-Verify registration for personnel employed in Utah.
Soil Preparation, Planting, and Cultivating

POSTED

3 days ago

DEADLINE

in 4 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS