CP00004 Street Work at Tuolumne

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Fresno is undertaking infrastructure improvements along Tuolumne Street between Broadway Street and Van Ness Avenue, including the Congo and Federal Alley approaches, through Project CP00004. The scope includes reconstructing sidewalks, installing new curb and gutter, replacing drainage inlets, removing an obsolete section of the Tuolumne Diverter Road, and vacating the associated easement on City-owned property. Additional elements of the project involve installing new streetlights and street trees, as well as dedicating a new street extension for Federal Alley. The work is designed as a minor alteration to existing public facilities without increasing traffic capacity, qualifying it for categorical exemptions under California Environmental Quality Act (CEQA) Guidelines Sections 15301(c) and 15302(c). No federal acquisition regulation clauses, contract pricing, or bid evaluation criteria are provided in the documentation, indicating this is a municipal project governed by local procedures rather than federal procurement rules. The project is classified as a forecast with no contract value or award method disclosed. The City of Fresno’s Department of Capital Projects, through the Transportation Project Management Division, is managing the project with Gustavo Rangel designated as the Project Manager and primary point of contact. All work will take place on-site in Fresno, California, with inspection and acceptance occurring at the project location. No formal contract type, payment terms, invoicing system, contracting officer, or technical representative is specified in the available records. While environmental compliance has been determined, there are no details regarding contractor qualifications, submission requirements, bid deadlines, or socioeconomic set-asides. The project is intended to modernize aging infrastructure, improve pedestrian safety, and enhance urban aesthetics through the integration of functional utilities and landscape elements, all within the boundaries of the existing right-of-way without expanding roadway capacity or triggering additional environmental reviews.

General Info

Fresno upgrades Tuolumne Street infrastructure with new sidewalks, curb, drainage, streetlights, trees, and Federal Alley extension, no capacity increase.

Agency

California → City of Fresno

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Tuolumne and Van Ness, Fresno, CA

Set-Aside

NONE

Documents

(1)

CP00004 NOE - City of Fresno Street Work Categorical Exemption

PDFcategorical-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Fresno
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Fresno
Office AddressN/A
Contacts
Gustavo RangelProject Manager

Full Description

Show more
The Project will reconstruct the sidewalk and install a new curb and gutter along Tuolumne Street between Broadway Street and Van Ness Avenue, including the Congo and Federal Alley approaches. The project would also involve the installation of new streetlights, street trees, and drainage inlets. The project would include the removal of existing drainage inlets and the demolition of a portion of the old Tuolumne Diverter Road, improving overall infrastructure in the area. The existing street easement (old Tuolumne Diverter Road) on City-owned property would be vacated after all the street work is completed. Additionally, the project would require a street dedication for an extension of the Federal Ally.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract involves the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process system upgrades to remove per- and polyfluoroalkyl substances from surface water. The scope requires integrated engineering solutions to meet evolving regulatory standards for drinking water safety, with specialized focus on advanced filtration and extraction technologies tailored to the existing infrastructure at both sites. Work will include site-specific modifications to ensure seamless operational integration while maintaining continuous water service during implementation. This solicitation, issued by Pyramid Building & Engineering, Inc., is designated for Disadvantaged Business Enterprises under the Department of Transportation set-aside program and falls under NAICS code 237310 for Water and Wastewater Pipeline and Related Structures Construction. Proposals must be submitted by September 3, 2026, with primary point of contact John Garrison available for inquiries via phone or email. The project is located entirely within California, with no specified city or zip details provided in the public record, and all contractual obligations are tied to performance at the two designated treatment plants. Participation is open to qualified firms seeking to support critical public health infrastructure improvements in compliance with state and federal water quality mandates.
Pyramid Building & Engineering, Inc.

POSTED

about 5 hours ago

DEADLINE

in 26 days
View Details