Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

CP27039 New Waterline at Highland Avenue West of Cambridge Avenue Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Cucamonga Valley Water District will undertake the construction of a new 12-inch water pipeline approximately 550 linear feet long in Rancho Cucamonga, California, at Highland Avenue west of Cambridge Avenue. This project will connect to the existing watermain to form a looped distribution network, enhancing system reliability and increasing fire flow capacity to meet community and emergency needs. The Cucamonga Valley Water District is the primary beneficiary of this infrastructure improvement, which aims to strengthen water service resilience in the area. The project is forecasted with a posted date of July 23, 2026, and all work will occur within the specified location in Rancho Cucamonga. Technical inquiries and correspondence should be directed to Tuan Truong, Engineering Manager, at the provided contact information.

General Info

Cucamonga Valley Water District to build 550-foot, 12-inch water pipeline in Rancho Cucamonga to enhance reliability and fire flow by July 2026.

Agency

California → Cucamonga Valley Water District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Rancho Cucamonga, CA

Set-Aside

NONE

Documents

(1)

CP27039 NOE_Filed

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Cucamonga Valley Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Cucamonga Valley Water District
Office AddressN/A
Contacts
Tuan TruongEngineering Manager

Full Description

Show more
The project will construct one (1) new 12-inch water pipeline (approximately 550 linear feet) in the city of Rancho Cucamonga, CA at Highland A venue. The pipeline will connect to the existing waterline, create a looped network, and improve system reliability and fire flow. CVWD is the primary beneficiary of this project.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
SLED
Sewer System Rehabilitation Project Contract No. 2026-02Carnegie Borough is soliciting sealed bids for the Sewer System Rehabilitation Project, Contract No. 2026-02, to be submitted electronically via the PennBid platform by Monday, August 10, 2026, at 10:00 A.M. local time. The project involves spot repairs, sewer lining, and rehabilitation of a stormwater sewer pipe and its outfall, with an expected duration of 120 days. All bidding documents are available at no cost through the PennBid portal, and official notices, addenda, and updates will be issued exclusively through this platform. Bidders must comply with prevailing wage requirements as determined by the Pennsylvania Department of Labor and Industry, adhere to the Public Works Employment Verification Act, and ensure all steel products used are manufactured in the United States. Contractors are prohibited from discriminating against employees or applicants on the basis of race, age, color, religion, sex, national origin, or handicap. The borough reserves the right to reject any or all bids and to waive irregularities, and no bid may be withdrawn within 90 days of the bid due date unless award is delayed by external approvals such as bond sales or grant awards. The project is partially funded by a grant from the Commonwealth of Pennsylvania’s Commonwealth Financing Authority. Work must conform to applicable ASTM standards for concrete pipe, HDPE materials, and installation practices, with inspections conducted on-site by the Engineer, who retains authority to accept or reject work based on compliance with specifications. Materials such as detectable marking tape must be clearly labeled with utility type and color-coded per industry standards for subsurface safety. Payment terms require adherence to 2 CFR Part 200, with invoices submitted through approved formats, though specific payment office or banking details are not provided. The contract does not specify a total value, as unit prices are listed without quantities, and lump sum items including mobilization are capped at 7% of the total bid. Bidders must provide a Unique Entity Identifier from SAM.gov and comply with federal reporting requirements, including potential disclosures for executive compensation if receiving substantial federal funding. The Agreement, spanning four pages, is the only attachment listed in Section J, while Sections C, E, F, G, H, K, and L are referenced as part of the broader Contract Documents but are not included as attachments under Section J. No formal FAR clauses are included in Section I, which is designated for standard detail drawings only. The solicitation does not include a formal evaluation factor hierarchy or
Allegheny County

POSTED

1 day ago

DEADLINE

in 18 days
View Details