This Solicitation opportunity from Nevada was posted on March 29, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
CRCGV-02 Material and Equipment Specifications
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the construction of structural steel frameworks for substations, designed by the manufacturer to support and connect all necessary equipment in accordance with detailed drawings. The structures must be fabricated and installed as specified, with the arrangement of circuits and static masts following the plans provided. Items supplied by other parties are included for informational purposes only, indicating that the primary responsibility for the structural components lies with the contractor or manufacturer. The project is overseen by the Nevada Colorado River Commission, a Nevada-based organization, with a solicitation issued under the title "CRCGV-02 Material and Equipment Specifications" and posted on March 29, 2024, with a response deadline of May 13, 2024. The procurement process is managed through the NevadaEPro system, which provides comprehensive instructions for vendors on bid submission, including logging in, viewing solicitations, and submitting quotes, emphasizing the importance of reviewing all attachments and adhering to submission procedures. The contract falls under the NAICS code 238120, which pertains to structural steel and precast concrete contractors, indicating the specialized nature of the work. The solicitation is open to qualified vendors who must comply with detailed bidding instructions to ensure proper submission of their proposals. The documentation highlights the importance of accurate and complete bid responses, including pricing, acknowledgment of terms, and review of all related files. The overall scope emphasizes adherence to the drawings and plans, ensuring that the structural steel frameworks for the substations are constructed precisely as specified to meet project requirements and standards set forth by the Nevada Colorado River Commission.
General Info
Agency
Place of Performance
NV, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
