Creek Road Bridge Rehabilitation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Creek Road Bridge Rehabilitation Project, managed by the Town of Fairfax in California, focuses on retrofitting the Creek Road Bridge over San Anselmo Creek to enhance seismic safety and prevent catastrophic failure during a Maximum Credible Earthquake. The scope of work involves implementing Caltrans approved Alternate 2 of the Seismic Retrofit Strategy Report, which includes constructing infill walls, repairing columns and bent caps, stabilizing abutments, and installing reinforced concrete waffle slabs to anchor the bridge. Additionally, the project entails deck rehabilitation through asphalt removal and crack sealing, the relocation of waterlines by MMWD, and the rerouting of a storm drain pipe. The project will not change the bridge footprint or require new rights-of-way, and it concludes with vegetation restoration in all disturbed areas. Construction is strictly limited to one dry season, generally between April 15 and October 15, with specific in-channel work restricted to June 1 through October 31 to protect fish migration cycles. Work hours are limited to weekdays from 8:00 a.m. to 5:00 p.m. and Saturdays from 9:00 a.m. to 5:00 p.m., with no noise-generating activities permitted on Sundays or holidays. The contractor must adhere to stringent environmental requirements, including the preparation of a Stormwater Pollution Prevention Plan, an Accidental Spill Prevention and Cleanup Plan, and an equipment staging plan. Staging is restricted to existing asphalt or concrete surfaces to avoid impacting sensitive areas. The project requires several regulatory permits, including a Section 404 permit from the U.S. Army Corps of Engineers, a Section 1602 permit from CDFW, and a Section 401 Certification from the RWQCB. Compliance is further ensured through weekly inspections of the staging area by a project environmental monitor.

General Info

Creek Road Bridge to be seismically retrofitted in Fairfax, CA, with full closure and environmental restoration.

Agency

California → City of Fairfax

Place of Performance

Creek Road, Wessen Road, Dominga Avenue, Fairfax, CA, 94930

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Fairfax
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Fairfax
Office AddressN/A
Contacts
Kristin ArnoldPublic Works Director

Full Description

Show more
The purpose of the Project is to retrofit Creek Road Bridge over San Anselmo Creek in order to enhance seismic safety, to prevent catastrophic failure during a Maximum Credible Earthquake, and maintain the structural integrity of the bridge to protect public safety. During construction, the bridge would be closed and traffic would be detoured through other access routes. Access to the creek would be needed for construction work. The footprint of the bridge and approach roadways would not change due to the Project and no new rights-of-way are needed. Vegetation restoration work would be implemented prior to completion of construction work in all disturbed areas.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. The project is located in California and encompasses a broad range of civil and infrastructure scopes, including site preparation, land surveying, subsurface investigation, and shoring. Specialized pipeline and utility work is required, specifically tunneling, boring, jacking, micro tunneling, and the installation of steel casing and cathodic protection. Additional requirements include subgrade roadbed construction, asphalt paving, concrete drilling, and the provision of ready mix and precast concrete, as well as site finishing tasks such as landscaping and the installation of traffic signs, signals, and lighting. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Additionally, bidders must demonstrate an ability to maintain labor harmony on the project. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected electronic system. The deadline for responses is November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237310
New
SLED
Parking Lot E8 Repairs
Solicitation # CSULBSOQ80
The Parking Lot E8 Repairs project (Project Number PE825PK023) at California State University, Long Beach, involves the complete removal of existing four-inch asphalt pavement and the upper 18 inches of soil, including cement-treated soil. The scope of work requires the installation of new asphalt over non-expansive fill compacted to at least 95 percent relative compaction, as well as the installation of one new EV charging station and the conversion of nine EV-ready stalls to full charging capability. The owner's construction estimate for this public works project is 3,700,000 dollars, with anticipated construction occurring between April 1 and July 30, 2027. Bidders must hold a valid California contractor's license in either the C-12 or B classification and must be prequalified through the PlanetBids portal. A mandatory site walk was scheduled for November 16, 2026, and sealed bid proposals are due by 2:00 p.m. on December 16, 2026. The project is subject to prevailing wage rate laws, requiring all contractors and subcontractors to be registered with the Department of Industrial Relations. Additionally, the project will be enrolled in the CSU Builders Risk Insurance Program and potentially the Owner-Controlled Insurance Program. Award will be based on the lowest responsive and responsible bid, with specific incentives provided for Disabled Veteran Business Enterprise (DVBE) participation. While a minimum of 3 percent DVBE participation is required, incentives ranging from 1 to 3 percent are available for participation levels between 4 percent and 6 percent or more, subject to a 50,000 dollar cap when combined with Small Business Preferences and a total cumulative adjustment limit of 100,000 dollars.
Purchasing Office Department of California State University, Long Beach

POSTED

about 4 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237310
New
SLED
Annual Bridge Repair, Maintenance, and Painting Services
Solicitation # 674
The City of Fort Lauderdale is soliciting bids for Project P12010, an annual contract to provide comprehensive bridge construction, repair, and maintenance services for the Public Works Department at various citywide locations. The scope of work encompasses structural concrete and spall repairs, treatment of corroded reinforcing steel, bridge deck and substructure repairs, seawall and bulkhead restoration, and the installation of cathodic protection systems and pile jacketing. Additionally, the contractor is responsible for bridge painting, railing and guardrail replacement, pavement restoration, signage, vertical clearance gauge installation, traffic control, and vegetation control. All work must adhere to specific technical standards, including RDOT Road and Bridge Specifications T459 for zinc protection and FDOT Section 02367 for concrete piles. This is a unit price contract with an initial term of two years, with the City reserving the right to extend the agreement for up to three additional one-year terms. Work is executed through individual Task Orders, with specific completion dates agreed upon for each. Bidders must submit electronic proposals via the City's online strategic sourcing platform by November 30, 2026, accompanied by a bid security of five percent of the bid amount. Award criteria are based on the responsive and responsible bidder who best serves the City's interests. Selected contractors must provide performance and payment bonds in accordance with Florida Statutes and provide a one-year guarantee on all labor and materials.
City of Fort Lauderdale

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS