Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Iowa was posted on February 14, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Crestwood Drive NW Roadway and Pedestrian Improvements

Closed
301946-03State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil and infrastructure works, including underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site preparation, shoring, asphalt paving, and the installation of utilities, manholes, and traffic signals. Additional requirements include land surveying, site security, traffic control, and storm water pollution prevention. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to various collective bargaining agreements. Interested parties must submit their quotes by November 18, 2025, via the Building Connected electronic system.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
Davison Rd MP 0.01 Bridge Rehabilitation
Solicitation # CRP 2198
Lewis County Public Works is soliciting sealed bids for the Davison Rd MP 0.01 Bridge Rehabilitation project, identified as County Road Project 2198 and Federal Aid Project BHOS-2021(075). The scope of work involves providing all labor, materials, and equipment to improve the bridge, specifically focusing on replacing the deck and cleaning and painting the metal surfaces of steel truss members, floorbeams, stringers, and other steel components. The engineer's estimate for the project is between 1.9 and 2 million dollars. All work must comply with WSDOT 2026 standard specifications, and specific technical requirements include strict adherence to an in-water work window from April 1st to September 30th for cleaning and painting activities. Sealed bids must be submitted electronically or delivered to the Clerk of the Board of Lewis County Commissioners by 12:15 PM on Thursday, November 19, 2026. Proposals must include a bid deposit equal to five percent of the bid amount in the form of cash, certified check, cashier's check, or surety bond. Required documentation includes a signed proposal page acknowledging two addendums, a non-collusion declaration, wage law compliance certification, a bidder questionnaire, and a local agency certification for federal-aid contracts. The successful bidder will be required to provide a contract bond and submit certified payrolls on a weekly basis.
Public Works- Roads

POSTED

about 18 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

The project involves roadway reconstruction, sidewalk construction, and storm drainage improvements along Crestwood Avenue NW between Edgewood Road NW and Wiley Boulevard NW, with an estimated cost of approximately 1.71 million dollars. The work is scheduled to commence upon receipt of the Notice to Proceed, with a late start date set for May 20, 2024, and a total working duration of 96 working days divided across five stages, each with specific milestones for completion. The contract is managed by the City of Cedar Rapids, Iowa, and is posted under solicitation number 301946-03, with a response deadline of February 28, 2024. The project emphasizes adherence to local bidding requirements, including submission of a Bidder Status Form to certify resident or nonresident bidder status, and may involve bonding requirements such as a bid bond guaranteeing proposal validity and contract execution. Supporting documentation includes various bid-related forms and references, such as a bid bond for a separate Colorado project, a unit price reference sheet for sidewalk infill work, and multiple Requests for Proposals and Invitations to Bid for related infrastructure, recycling services, and construction projects across different municipalities. These documents outline detailed bid procedures, licensing requirements, project specifications, and submission deadlines, emphasizing compliance with local procurement policies, licensing, and insurance standards. Overall, the contract aims to facilitate essential infrastructure improvements through a structured bidding process, ensuring transparency, compliance, and timely project delivery.

General Info

Documents

6
PDF, High priority: read this firstrfb
High
PDF, High priority: read this first2 pages · bid-bond
High
XLSX, High priority: read this firstspecifications
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstspecifications
High
PDF, Low priority2 pages · bidder-status-form
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIowa → City of Cedar Rapids
ContactsNo contacts available
OfficeN/A
Organization / AgencyIowa → City of Cedar Rapids
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Project Description: The Public Improvement, upon which bids are requested, generally consists of roadway reconstruction and construction of new sidewalk and storm drainage improvements located on Crestwood Avenue NW between Edgewood Road NW and Wiley Boulevard NW. The Engineer’s opinion of probable cost is $1,710,000.   Early Start Date: Overall - Upon Receipt of Notice to Proceed  Late Start Date: Overall - 5/20/2024                            Stage 1 - 5/20/2024                            Stage 2 - Completion of Stage 1                            Stage 3 - Completion of Stage 2                            Stage 4 - Completion of Stage 3                            Stage 5 - Completion of Stage 4        Milestones: None  Final Completion:  Overall: Working Days - 96                               Stage 1: Working Days - 16                               Stage 2: Working Days - 20                               Stage 3: Working Days - 28                               Stage 4: Working Days - 12                               Stage 5: Working Days - 20 

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS