Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on March 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Critical Fire Suppression (Hydrostatic Testing)

Awarded
2098150State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Dallas Area Rapid Transit (DART) is soliciting bids for Critical Fire Suppression hydrostatic testing services at the Central Rail Operations Facility (CROF) in Dallas, Texas. The scope of work involves the inspection, hydrostatic service testing, maintenance, and documentation of fire hoses and appliances at the WSA and S&I buildings, with all activities required to comply with NFPA 1962 standards. To be considered responsive, all interested vendors must attend a mandatory pre-bid site visit on March 13, 2026, at 9:00 AM and submit their proposals via the Bonfire BidTable platform by the deadline of March 17, 2026. The contract will be awarded to a single vendor based on the Lowest Price Technically Acceptable (LPTA) basis, where technical responsiveness to the Scope of Work is a pass/fail threshold. Key commercial terms include Net 30 payment terms and a requirement for FOB Destination shipping, meaning all freight costs must be included in the overall bid price. The agreement is governed by DART's Purchase Order Terms and Conditions, which include strict delivery timelines and specific certifications regarding the non-boycott of Israel and non-engagement with foreign terrorist organizations.

General Info

Contract Value

$8,850

Place of Performance

TX, USA

Set-Aside

NONE

Award Issued Date

Documents

3

DART NFPA 1962 Hose Inspection Price Schedule

PDF, High priority: read this firstspecifications
High

Purchase Order Terms and Conditions - Dallas Area Rapid Transit Authority

PDF, High priority: read this first4 pages · contract-document
High

RFQ-2098150 - Hydro All Hose Rack System NFPA 1962 Inspection SOW

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Dallas Area Rapid Transit
Contacts4 people available
OfficeTX, USA

Full Description

Show more
-- Dallas Area Rapid Transit (DART) is seeking bids from **qualified firms** to provide Critical Fire Suppression (Hydrostatic Testing) services to one of its properties.
Please review this opportunity and all of the attached documents. This opportunity will be awarded to one vendor offering the lowest acceptable pricing. All vendors must attend the Pre-Bid Site Visit and meet all the requirements listed in the Scope of Work (SOW) in order to be considered responsive.
**PRE-BID SITE MEETING DATE, TIME, AND LOCATION:** The site visit will consist of visiting two buildings in the same location. We will meet at the Central Rail Operations Facility (CROF) in Dallas Location address listed below at 9:00 AM to visiting the site locations. Please allow approximately one hour for the site visit.
*Please confirm your participation for the Pre-Bid Site Visit via email to Evelin Aguilar (eaguilar@dart.org) and copy (Cc): Efriem Demeke (edemeke@dart.org) and Isaac Park (ipark@dart.org) as well. *
**Date: Friday, March 13, 2026 @ 9:00 AM** Central Rail Operations Facility (CROF) 3021 Oak Lane, Dallas, TX 75226 --- ***BONFIRE REGISTRATION IS REQUIRED TO ACCESS DETAILS / BIDTABLE*** *To access details / BidTable, please initiate the "Prepare Your Submission" process at the bottom of the page -- Thereafter, locate the in-browser BidTable window and scroll right for project details and vendor response fields.*
--- **PURCHASE ORDER TERMS AND CONDITIONS** -- All purchase orders are subject to Dallas Area Rapid Transit Authority's Terms and Conditions. The complete PO Terms and Conditions PDF is available for download in the "Supporting Documentation" section below.
**Freight Terms Notice -** Please ensure that all bids/quotes reflect FOB Destination shipping terms with the freight cost included in the overall price. DART does not typically accept FOB Origin or Prepay and Add terms.
**Delivery Terms Notice -** Time and rate of deliveries are of the essence of this order. Seller's failure to deliver at the time and rate specified shall be the basis for rejection and default termination by the Authority (*Dallas Area Rapid Transit Authority*).
**Payment Terms Notice -** All vendors are advised that DART's payment terms are Net 30. Invoices shall be submitted (APInvoices@dart.org) in triplicate (one copy shall be marked 'Original"), unless otherwise specified, and shall contain the following information: purchase order number; item number; purchase order description of supplies, services, or construction; sizes; quantities; unit prices; and extended totals. Unless otherwise specified, payment will be made on partial deliveries accepted by the Authority when the amount due on such deliveries so warrants. *Invoices will be paid 30 days from receipt of the invoice or 30 days from receipt of the order, whichever is later, unless other payment terms have been agreed upon in writing.*
**Termination for Default Notice -** The Contracting Officer may by written notice terminate this order, in whole or in part, for failure of the Seller to perform any of the provisions hereof within the time periods specified. In such event, the Seller shall be liable for damages, including the excess cost of reprocuring similar supplies or services or completing construction; provided that, if (i) it is determined for any reason that the Seller was not in default, or (ii) the Seller's failure to perform is without his and his subcontractor's control, fault, or negligence, the termination shall be deemed to be a termination for convenience under paragraph 12. As used in this provision, the term "subcontractor" and "subcontractors" means subcontractors, vendors, and suppliers at any level.

More opportunities from Texas → Dallas Area Rapid Transit

Same awarding agency

NAICS: 541330
SLED
Trinity Railway Express (TRE) 2MT IH-35E Design
Solicitation # P-2096182
Dallas Area Rapid Transit is soliciting professional engineering design services for the Trinity Railway Express Second Main Track project in Dallas, Texas. The scope of work involves preparing construction documents for 1.95 miles of double track from I-35E to the Mockingbird Lane grade separation. Key technical requirements include the replacement of the DART Rail Bridge at I-35E and SH 183 Lower Stemmons, the relocation of the historic Tresse Bridge, and the construction of new bridges over Inwood Boulevard and the Knights Branch and Noble Branch stream crossings. The design must adhere to a 18.5 foot vertical clearance requirement for the I-35E freight corridor and accommodate design speeds of 60 mph for freight and 79 mph for passenger rail. The project integrates with the Harry Hines Boulevard Transportation Master Plan, requiring the evaluation of multiple intersection layout alternatives to improve connectivity, accessibility, and safety for multimodal users. Deliverables include detailed design schematics, conceptual phasing plans, and technical specifications for steel and concrete materials. The winning bidder must sign a confidentiality agreement and ensure all personnel complete specialized training on new bridge design and construction methods. Coordination with the Texas Department of Transportation Dallas District is required to manage traffic control and track alignment shifts during the phased construction process.
Engineering Services

POSTED

8 days ago

DEADLINE

in about 2 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS