Critical Path Method (CPM) Scheduling and Project Controls

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 6 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 9 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The contract requires the development and maintenance of a Critical Path Method (CPM) schedule using Primavera P6 or equivalent scheduling software to effectively monitor project progress, manage the critical path, and support formal requests for time extensions to the Resident Engineer. The contractor must ensure the schedule remains accurate and up to date throughout the project lifecycle, providing reliable data to inform decision making and maintain contractual compliance with schedule obligations. This subcontract is under the South Carolina Department of Transportation, with performance obligations centered in Lancaster, and falls under the NAICS code 541330 for engineering services. The solicitation was posted on August 11, 2026, with an identical response deadline indicating immediate closure, suggesting an expedited or internal procurement process. The work is essential to the overall project controls framework, directly impacting the agency’s ability to track performance, justify delays, and adhere to transportation infrastructure timelines.

General Info

Develop and maintain CPM schedule in Primavera P6 for South Carolina DOT project in Lancaster.

Place of Performance

Lancaster, SC, USA

Set-Aside

NONE

Documents

This scope was carved out of 2973030.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Call 060 2973030

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencySouth Carolina Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Develop and maintain a CPM schedule using Primavera P6 or similar tools to monitor progress, manage critical path, and support time extension requests to the Resident Engineer.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS