Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on September 3, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

F--CRLA SOUTH 62 PHASE 2 CUT AND PILE

Awarded
140PS124R0011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115310
New
SLED
San Poil Forest, Louie Creek
Solicitation # LoisCreen2026.pdf
The Confederated Tribes of the Colville Reservation is soliciting bids for an excavator piling and scarification project totaling 90.8 acres within the Louie Creek logging area on the Colville Indian Reservation. The scope of work includes piling logging slash and debris, removing brush and standing dead trees, and removing non-merchantable trees exhibiting dwarf mistletoe. Contractors must utilize equipment with low ground pressure of less than 8.5 p.s.i. and are required to construct water bars on slopes to prevent water channeling. Performance will be monitored by a designated Contract Officer’s Representative from San Poil Forestry, who will conduct inspections in each unit to ensure quality and progress. Bids must be submitted in a sealed envelope to the San Poil Forestry locked box at the Mt. Tolman Fire Center by November 5, 2026, at 4:00 PM. Mandatory submission requirements include a bid on every inspection item, a bid evaluation form, a contracting and subcontracting plan, and proof of SAM.gov registration. Evaluation factors include technical qualifications, reasonable pricing, and a strong emphasis on Indian preference in the award of contracts and subcontracts. Contractors must provide liability insurance and are encouraged to obtain a Trader License and TERO Tile ID certification to avoid specific fees. All work must comply with the Tribal Occupational Safety and Health Administration standards and applicable federal and state laws.
Confederated Tribes of the Colville Reservation

POSTED

about 13 hours ago

DEADLINE

in 7 days
NAICS: 115310
New
SLED
San Poil Forest, 3 commercial thinning contracts
Solicitation # thinningcontract2026.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry and the Tribal Employment Rights Office, is soliciting bids for three commercial pre-commercial thinning contracts located in the 30 Mile Logging area of the Colville Indian Reservation. The scope of work involves thinning operations across three specific units: SP-06-PCT-27 (39.7 acres), SP-07-PCT-27 (33.0 acres), and SP-08-PCT-27 (37.0 acres). Key technical requirements include the felling of overtopped or suppressed trees, the removal of all mistletoe-infected trees, and specific slash management to create a uniform fuel bed. Quality standards mandate that stumps be cut below five inches and that brush or hardwoods interfering with leave trees be cleared within a four-foot radius. Bids must be submitted in a sealed envelope labeled 30 Mile PCT 2027 and deposited in the San Poil Forestry Drop-Off Box at the Mt. Tolman Complex by 4:00 PM on November 2, 2026. The award process emphasizes Indian Preference and requires bidders to provide a bid per acre and a total bid price. Essential submission documents include a work plan, bid sheet, debarment certification, TERO compliance forms, and proof of liability insurance. Contractors must also obtain a BIA Trader License and adhere to TOSHA safety standards. Payment terms include a 20 percent withholding until final approval, with partial payments authorized for units exceeding 10 acres. Final acceptance is contingent upon a final inspection by the Contracting Officer's Representative and the complete removal of all debris from the units.
Confederated Tribes of the Colville Reservation

POSTED

about 13 hours ago

DEADLINE

in 4 days
NAICS: 115310
New
SLED
San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027
Solicitation # McAllister-Creek-PCT-Highway-21-Blocks-2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry, is soliciting bids for two Pre-Commercial Thinning (PCT) contracts in the McAllister Creek area on the Colville Indian Reservation. The project encompasses a total of 23.77 acres, divided between Unit SP-15-PCT-27 (10.33 acres) and Unit SP-16-PCT-27 (13.44 acres). The scope of work requires the selection and retention of the most vigorous trees, strict slash management including clearing roadways and streams, and the removal of all foreign debris. Contractors must adhere to specific technical standards, such as maximum stump heights of one-half the stump diameter and a maximum slash height of 24 inches, with financial penalties of 3 dollars per tree for damage to leave trees. Bids must be physically submitted to the mailbox at the Mt Tolman Complex by 4:00 PM on November 17, 2026, as electronic submissions are prohibited. A complete bid packet must include a bid sheet, bid evaluation form, a detailed work plan, TERO compliance and utilization forms, and a signed debarment certification. Award decisions are based on the contractor being responsive and responsible, though the lowest bid is not guaranteed to be accepted. Payment is issued per completed and accepted acre, with 20 percent of each payment withheld until final acceptance. Contractors are required to provide liability insurance and comply with TERO Title X and TOSHA safety regulations.
Confederated Tribes of the Colville Reservation

POSTED

about 13 hours ago

DEADLINE

in 19 days
NAICS: 115310
New
Grant
Landscape Scale Restoration Grant Program for Tribes
Solicitation # USDA-FS-2026-LSR-TRIBAL
The Landscape Scale Restoration Grant Program for Tribes, solicitation USDA-FS-2026-LSR-TRIBAL, is a competitive funding opportunity administered by the USDA Forest Service. The program supports collaborative, science-based forest restoration projects on rural non-industrial private forest land, rural state or local government forest land, and Indian trust or fee lands. Projects must align with a science-based restoration strategy, such as a Tribal Forest Plan, and focus on reducing wildfire risk, improving fish and wildlife habitats, maintaining water quality, or mitigating invasive plants, insects, and disease. Total program funding is 1.26 million dollars, with individual awards ranging from 100,000 to 300,000 dollars. A mandatory 1:1 non-Federal cost-share match is required for all grant recipients. Applications must be submitted via email to [email hidden] by January 26, 2027. Required documentation includes a project narrative limited to five pages, a detailed budget spreadsheet, and a valid Unique Entity Identifier from SAM.gov. Projects involving equipment purchases must submit form FS 1500-34, and all applicants must undergo a risk assessment and submit a financial capability questionnaire prior to award. The evaluation process is based on a 100-point scale focusing on deliverables, goals, strategy integration, and sustainability. Awarded projects must be completed within three years, with possible extensions up to five years. Performance is measured by quantitative outcomes in hazardous fuels management, invasive plant treatment, or insect and disease management.
Forest Service

POSTED

1 day ago

DEADLINE

in 3 months
NAICS: 115310
New
Grant
Landscape Scale Restoration Grant Program for Non-Federal Lands
Solicitation # USDA-FS-2026-LSR
The Forest Service is offering the Landscape Scale Restoration (LSR) Grant Program for Non-Federal Lands under solicitation USDA-FS-2026-LSR to support collaborative, science-based restoration of priority forest landscapes. The program focuses on reducing wildfire risk, improving fish and wildlife habitats, maintaining water quality and watershed function, and mitigating invasive plants, insects, and disease. Eligible projects must be conducted on rural non-industrial private forest land or rural state and local government forest land, where rural is defined as areas outside Census places with more than 50,000 people. All applications, except those from federally recognized Tribes and Tribal organizations, require sponsorship from the relevant State Forester. Funding is provided through a competitive process with a total program funding of 11,340,000 dollars and an expected 30 awards. Individual awards range from a minimum of 100,000 dollars to a maximum of 300,000 dollars for single-state projects and 600,000 dollars for multi-state projects. A 1:1 non-federal cost share match is required. The period of performance is three years, with a possible two-year extension, not to exceed five years in total. Applicants must be registered in SAM.gov and provide a Unique Entity Identifier. Awards are determined by a ranked project list based on a 100-point scoring system, evaluating factors such as goals and objectives, integration with State Forest Action Plans, cross-boundary collaboration, and sustainability of outcomes. Before awarding funds, the Forest Service conducts a risk assessment based on financial stability and performance history, requiring the submission of a Financial Capability Questionnaire. Applications must be submitted via Grants.gov by January 26, 2027.
Forest Service

POSTED

1 day ago

DEADLINE

in 3 months

AI Contract Overview

Show more

Solicitation 140PS124R0011 is a total small business set-aside for the Crater Lake National Park Phase 2 South Highway 62 Fuels Reduction and Vegetation Management Project. Managed by the Department of the Interior's National Park Service, this firm fixed price contract involves tree thinning, felling, and hand piling and covering across approximately 290 acres, with options to include an additional 40 acres. The period of performance is scheduled from October 1, 2024, through July 1, 2027. The project requires strict adherence to federal regulations, including FAR 52.219-14 Limitations on Subcontracting and the Service Contract Act Wage Determination 1977-0079 Revision 75, which mandates specific minimum hourly wages and fringe benefits for forestry and logging services in Oregon. Prospective bidders must submit a comprehensive proposal package including technical capabilities, equipment lists, fire suppression and safety plans, and evidence of relevant experience on similar projects.

General Info

Contract Value

$285,940

NAICS

115310 - Support Activities for Forestry

Place of Performance

DC, USA

Set-Aside

NONE

Award Issued Date

Documents

5

140PS124R0011 Attachment 4 - Proposal Submission Package

DOCX, High priority: read this firstrfp
High

140PS124R0011 - Crater Lake NP Phase 2 Fuels Reduction

PDF, High priority: read this firstrfp
High

140PS124R0011 Limitations on Subcontracting Compliance Worksheet

XLSX, High priority: read this firstspecifications
High

SCA Wage Determination 1977-0079 Rev 75

PDF, High priority: read this firstwage-determination
High

South 62 Unit Phase 2 Map

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Nps Conops Strategic DOI
Contacts1 person available
OfficeWashington, DC, 20240, USA
Office AddressWashington, DC, 20240, USA

Full Description

Show more
NPS - Crater Lake National Park (CRLA) - Phase 2 - South HWY 62 Fuels Reduction and Vegetation Management Project The National Park Service - Washington Office - Contracting Operations - Strategic Branch as a requirement for a single contractor to reduce the fuel load and change fuel arrangement inside the Crater Lake National Park (CRLA)s boundary by mechanically (with chainsaws only) cutting and piling small diameter (< 7 DBH) conifers and dead trees/snags (<13) along South Highway 62. No heavy equipment (i.e. feller-bunchers, skidders, etc.) are authorized. The objective of this project is to reduce the fuel load and change fuel arrangement to reduce the intensity of wildland fire along the highway, which is the primary road leading into and out of the park from the South. There are only three egress routes from the park and over the last several years limited egress was a significant concern during major wildfire events. This project will not only provide safe egress of visitors, park staff, and Concessionaire employees, it will also lessen the intensity along the roadside and enable firefighters to safely try and contain a wildfire. The Contractor shall furnish all equipment and sufficient personnel for selected maintenance (i.e., chain saws, tools, proper personal protective equipment, etc.) and all related incidental work as in accordance with the unit specifications stated herein. No Government furnished property shall be provided. GENERAL: This is a NEW requirement. This is a PRE-SOLICITATION NOTICE only and does not constitute a solicitation; accordingly, no response is due at this time. No questions nor phone call will be accepted about this pre-solicitation notice. All questions and phone calls will be addressed after the solicitation is posted through official amendments. Specific instructions on submitting proposals will be contained in the solicitation documents. It is anticipated that the solicitation will be issued sometime after July 25, 2024! The entire solicitation package, including all attachments, will be available electronic through SAM.gov only. Paper copies of this solicitation are not and will not be made available. Anyone wishing to participate in this proposed procurement must obtain their copy from SAM.gov | Home. Copies will not be mailed from the Contracting Office. All amendments will be posted on SAM.gov | Home. Contractors will be solely responsible for obtaining amendments from this site to update files. PROJECT SCOPE: The Contractor shall provide all material, labor, and equipment required to perform the work described herein according to the contract plans and specifications. The general scope of work includes: Objectives: Thinning Prescription: - Thin Conifers over 12 tall to 7 DBH. Leave all live trees over 7 DBH. - Limb all live and dead branches on leave trees 6 to 8 feet above ground without reducing the live crown to less than 50% of the overall tree height. All pruning stobs will be less than 1/2 inch in length on all sides. - Leave a minimum of ONE tree every 15 feet. If all trees are less than 7 DBH, pick one tree, with a preference toward red fir and mountain hemlock. Also look for the most vigorous tree or the one with the least visual defects for the leave tree. - Cut and pile all - ladder fuels within the drip line of existing trees and moving material at least 7 feet beyond remaining trees. Ladder fuels include brush greater than 1 foot tall and trees up to 7 inches DBH. Trees greater than 7 inches DBH SHALL NOT be removed. - Burn piles will not be located at the base of remaining trees. - Cut all regeneration and shrubs in the ditch alongside the road. - General Appearance - Avoid straight lines, provide vertical diversity, avoid - sterilization. Leave small clumps of trees and vary spacing. - Flush cut all stumps flat no greater than 3 from the ground as measured on the uphill side. All stumps shall be flat cut with no acute angle. - Snags (dead standing trees) - Cut dead trees/snags less than 13 DBH, leave all dead trees/snags greater than 13 DBH. - Woody Debris - Cut and pile all down material less than 7 in diameter. Leave all down material 7 and greater in their entirety. Avoid bucking logs that are not going to be piled. - No cutting of live 5-needle pines (see attached photos) and deciduous trees. - Work with park provided Archaeology Monitors to avoid piling in sensitive sites. These areas will be marked with red and white candy stripe color flagging and red and white striped color pin flagging. - If can dumps or other artifacts are discovered, contact Archaeology Monitors (NPS) immediately and move on with thinning and piling by moving at least 30 beyond last seen artifact. - No live limbs shall be left on the stump of any cut stem. - The COR may reserve individual snags from felling requirements when snags are deemed necessary for other resource goals. These snags will be flagged before work begins. Piling Requirements It was visually estimated the range of piles may be between 30-60 piles an acre for this project. There is no guarantee on the accuracy of the government estimate, and it is recommended prospective quoters visit the unit to make their own estimates. Vegetation varies throughout the unit and there are sections with lighter and heavier fuels. - Hand pile all slash (natural dead and down, and activity slash) less than 7 in diameter and greater than 2 feet in length. - Pile heights 4-6 - Pile widths 4-6 - All piles shall be constructed by laying limbs, stems, cut boles, and other slash in the pile to be parallel with each other. Slash that causes large air spaces in piles shall be cut to eliminate air spaces. Each pile shall include an area of small sized slash (small branches less than - to - inch in diameter and/or small branches with needles or leaves attached) to provide - kindling for prompt ignition and to aid in combustion of larger slash. These fuels shall be placed in the center of the pile. - Piles shall be capped with 4 mil polyethylene plastic. Limbs or other woody debris should be placed over the piles to secure plastic against reasonable wind events. The plastic should cover approximately of 80% percent of the pile. All four corners and the middle of the plastic sheets shall be anchored with slash or other debris. Covering shall be done at the time of piling. - Piles shall not be placed next to or on top of residual green trees, standing dead trees, on stumps, or near logs greater than 10 in diameter, or on trails or roads. - Piles shall be located a minimum of 15 from existing live trees. - Cut materials must be piled within 20 days of being cut. - Piles shall not be placed in ditch along road, and shall be at least 20 feet off the edge of the asphalt. The contractors will also be required to carry wildland fire related tools and follow fire related precautions and restrictions as necessary as detailed in the solicitation. Contractor is required to comply with Agricultural Worker Protection Act (MSPA), 29 United States Code (U.S.C) 1801-1872, and to the U.S. Department of Labor (DOL) regulations implementing MSPA 29 Code of Federal Regulations (CFR) Part 500. MSPA eliminates activities detrimental to migrant and seasonal agricultural workers, requires registration of Farm Labor Contractors, and ensures necessary protection for the workers. Information regarding MSPA can be found at https://www.dol.gov/agencies/whd/agriculture/mspa. PLACE OF PERFORMANCE: Crater Lake National Park (CRLA) which is approximately 75 miles from Medford, OR (closet airport). PROCUREMENT TYPE: The solicitation and resulting award will be conducted under FAR Part 12 - Acquisition of Commercial Products and Commercial Services, using FAR Part 13 - Simplified Acquisition Procedures, as authorized by FAR 12.102 (b). The Government will issue a single firm fixed price contract in accordance with FAR 12.207(a) to the responsible quoter whose quote is determined to offer the - best value to the Government and found technically acceptable with the lowest evaluated price in accordance with FAR 15.101-2 as authorized by FAR 13. SET-ASIDE: This acquisition will be a 100% Small Business Set-aside. Offers will only be accepted from small business concerns. Offers received from concerns that are not small business concerns shall be considered nonresponsive and will be rejected. NORTH AMERICAN INDUSTRIAL CLASSIFICATION SYSTEM (NAICS) CODE AND SMALL BUSINESS SIZE STANDARD: The NAICS code for this project is 115310 - Support Activities for Forestry and the small business size standard is $11.5. PERIOD OF PERFORMANCE: 60 Calendar Day, but is broken out with operational periods as detailed in solicitation because of weather, potential fire, and other environmental and nature resource issues that may impact performance. Pre-Proposal Meeting is schedule for: Wednesday, July 31, 2024 - 10:00 AM Pacific Time Location: Front of the Canfield Building next to the Steel Visitors Center, Crater Lake, OR 97604, The coordinates are 42.896281, -122.134740 if that helps. Due to spotty cell service in the area there will be NO virtual option available. If contractors cannot attend the pre-planned site visit, contractors are encouraged to visit the site on their own, and reference FAR 52.237-1 above should a contractor not elect to visit site prior to submission of their quote/proposal. NOTE 1: All prospective contractors must be registered in the System for Award Management (SAM) database at http://www.sam/gov/ before award of contract; failure to register in the SAM database shall cause your firm to be ineligible for the award and removed from consideration. NOTE 2: As required by the Farm Security and Rural Investment Act of 2002 and the Energy Policy Act of 2005 (7 U.S.C. 8102(c)(3)), the offeror certifies, by signing this offer, that biobased products (within categories of products listed by the United States Department of Agriculture in 7 CFR part 2902, subpart B) to be used or delivered in the performance of the contract, other than biobased products that are not purchased by the offeror as a direct result of this contract, will comply with the applicable specifications or other contractual requirements.

More opportunities from Department Of The Interior → Nps Conops Strategic DOI

Same awarding agency

NAICS: 236220
New
Federal
Y--Construct North Unit Visitor Center at BADL
Solicitation # 140PS126B0010
Solicitation 140PS126B0010 is a sealed-bid Invitation for Bid issued by the Department of the Interior's National Park Service for the construction of a new North Unit Visitor Center at Badlands National Park in Jackson County, South Dakota. This project is a 100 percent Small Business Set-Aside under NAICS 236220, with an estimated construction magnitude between 10 million and 20 million dollars. The primary scope of work involves the construction of a facility approximately 17,176 square feet, with additional options for an East Shade Structure, a West Shade Structure, and a Concrete Monument Sign at the East Entry Drive. The anticipated period of performance is 730 calendar days, estimated from November 2, 2026, to November 1, 2028. Award will be granted to the responsible firm offering the lowest price. Bidders must submit a comprehensive electronic bid package in PDF format by November 10, 2026, at 12 PM Central Time. Key requirements include a completed SF 1442, a detailed price breakdown, a bid guarantee up to 3 million dollars, and a limitations in subcontracting report. Technical submittals must include a resume of five recently completed similar projects and specific installer qualifications. The contract is subject to Davis-Bacon wage determinations and requires the contractor to be responsible for their own utility services. Performance and payment bonds, as well as liability and workman's compensation insurance, are required post-award.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 12 days
View Details
NAICS: 237990
Federal
Z--ALPO STABILIZATION OF STAPLE BEND TUNNEL
Solicitation # 140P4226R0026
Solicitation 140P4226R0026 is a 100% Small Business Set-Aside, Firm-Fixed Price contract issued by the National Park Service for the stabilization of the Staple Bend Tunnel at the Allegheny Portage Railroad National Historical Site in Johnstown, Pennsylvania. The scope of work includes the development of a stabilization maintenance plan, rock scaling of 3,528 square feet, installation of 14 rock bolt anchors, 180 cubic yards of void fill concrete, 2,310 square feet of gunite, 2,500 linear feet of drainage, and a fossil inventory. The project also requires the installation of signposts and adherence to strict historic preservation and environmental protections, including the retention of an NPS-approved paleontologist if resources are discovered and compliance with bat protection measures. The period of performance is scheduled from November 9, 2026, to December 31, 2027, with a delivery timeline of 190 days after the notice to proceed. Award will be based on the Lowest Price Technically Acceptable process, evaluating technical capability and price. Offerors must provide a bid bond of 20% of the bid price or 3 million dollars, whichever is less, and demonstrate compliance with limitations on subcontracting. Contractors must adhere to Davis-Bacon Act wage standards, OSHA safety requirements, and specific sustainability mandates, including the use of biodegradable or recyclable packaging and materials with at least 10% recycled content. Proposals must be submitted electronically as separate technical and pricing files to the designated point of contact by October 30, 2026.
Other Heavy and Civil Engineering Construction

POSTED

about 1 month ago

DEADLINE

in 1 day
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS