Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Connecticut was posted on May 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CRMHC Gym Ceiling Demolition

Closed
BI-MH-167/MHA-1492State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract pertains to the demolition of an existing plaster-over-metal-lathe ceiling system suspended from a concrete deck via a metal grid, followed by the installation of a new suspended acoustical ceiling system with lay-in pads, hung LED lighting, and integrated life safety devices at a psychiatric facility in Connecticut. All work must comply with the Connecticut State Building Code, NFPA standards for fire alarm and life safety systems, and environmental regulations including hazardous waste handling under RCRA, OSHA, EPA, and DOT guidelines. Demolition activities include asbestos abatement performed in strict adherence to safety protocols, with all waste properly contained in impermeable, labeled containers and disposed of according to regulatory requirements. Materials must be delivered in manufacturer’s original packaging, remain undamaged until installation, and be stored under controlled conditions to prevent moisture, contamination, or physical damage, with special attention given to fluorescent lamps, pressurized cylinders, and hazardous substances. The contract is structured as a lump sum fixed-price arrangement under a design-bid-build delivery method, with award going to the lowest technically acceptable bidder. Bidders must demonstrate financial, managerial, and technical capability and meet stringent subcontracting goals of 25% Small Business Enterprise and 6.25% Minority/Women/Disadvantaged Business Enterprise participation. All personnel must complete mandatory orientation, adhere to strict facility security rules including prohibitions on patient contact and possession of weapons, and undergo background checks if working at corrections facilities. Required submittals include completed bid forms, bid bonds, qualification statements, and attachments based on bid value, with all documentation uploaded as separate PDFs via the CTsource portal prior to the bid deadline. Performance is expected to achieve substantial completion within 78 calendar days from notice to proceed, with no extensions allowed without written change order. Inspection and acceptance occur on-site by the owner’s representative, requiring compliance with all contract documents and testing by NVLAP- or NRTL-accredited laboratories. No barcoding or military packaging standards apply, and payment is to be processed electronically through project management software, though specific remittance details are not provided.

General Info

Demolition of gym ceiling, install acoustical ceiling, LED lighting, life safety; Connecticut DAS contract.

Place of Performance

CT, USA

Set-Aside

NONE

Documents

4

BI-MH-167 CD Drawings Rev001 4.16.26

PDF, High priority: read this firstcontract-drawings
High

BI-MH-167 CRMHC Gym Ceiling Demolition Project Manual Volume 1

PDF, High priority: read this firstproject-manual
High

Solicitation Change Details Report BI-MH-167/MHA-1492

PDF, High priority: read this firstamendment
High

BI-MH-167 MHA-1492 CRMHC Gym Ceiling Demolition Pre-Bid Walkthrough Sign-In Sheet 5.20.26

PDF, Low prioritysign-in-sheet
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → DAS Procurement
Contacts1 person available
OfficeCT, USA
Organization / AgencyConnecticut → DAS Procurement
Office AddressCT, USA
Contacts
Mikako TironePrimary Contact

Full Description

Show more
Demolition of an existing ceiling consisting of plaster over metal lathe, hung from the concrete deck above by a metal grid system. Installation of a suspended acoustical ceiling system with lay-in pads in a metal grid, hung LED lighting and life safety devices. Please see 01 11 00 Summary of Work for more Details.

More opportunities from Connecticut → DAS Procurement

Same awarding agency

NAICS: 541330
New
SLED
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA
Solicitation # EDC 11- 2026 -01
The Northwest Hills Council of Governments (NHCOG) is soliciting proposals under solicitation number EDC 11- 2026 -01 for on-call engineering services to support the Torrington Transfer Station and the Northwest Resource Recovery Authority (NRRA). The agency seeks a qualified firm specializing in Municipal Solid Waste and Recycling Transfer Stations to provide technical analysis, facility and operational capacity assessments, site planning, and permitting assistance. These services are intended to support ongoing operations and inform the NRRA Strategic Plan and future capital investment decisions, ensuring compliance with CT DEEP General Permits. Interested firms must submit their proposals by November 30, 2026, at 11:00 AM. Submissions must include a project management plan, key personnel resumes limited to two pages, three relevant references, a technical approach, and a detailed project timeline. A fee proposal containing hourly rates or lump sum allocations must be submitted in a separate sealed envelope. Evaluation will be based on personnel qualifications, experience with multiuse trails and waste facility planning, the proposed project approach, and the fee schedule. Awardees must provide proof of workers compensation, liability, and vehicle insurance, including a waiver of subrogation and naming the State of Connecticut and NHCOG as additional insureds within ten days of the award. Required documentation also includes a Non-Collusion Affidavit and certifications of non-discrimination.
Engineering Services

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS