Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on May 15, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Crooked River Valley Rehabilitation Phase 3 - Nez Perce-Clearwater National Forests

Awarded
12034320R4001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 10 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The Crooked River Valley Rehabilitation Phase 3 project, solicitation 12034320R4001, is a total small business set-aside contract issued by the USDA Forest Service. Located on the Red River Ranger District of the Nez Perce-Clearwater National Forests near Elk City, Idaho, the project aims to mitigate historical dredge mining impacts on aquatic habitats. This phase involves the construction of approximately 4,300 linear feet of large wood structures, 2,800 linear feet of Type 1 brush fascine, 900 linear feet of Type 2 brush fascine, and up to 32 acres of floodplain roughness. Additionally, the contractor is responsible for the transport, storage, and planting of approximately 12,000 government-furnished riparian plants from Wildlife Habitate Nursery in Princeton, Idaho. The government estimates the construction cost between 500,000 and 1,000,000 dollars, with work scheduled to occur between June 20, 2020, and October 15, 2020. Due to environmental protections, instream equipment operation in pools and wet areas is prohibited until fish salvage is completed after July 15, 2020. The project is a collaborative effort funded by the Bonneville Power Administration and US Forest Service stewardship funds, in partnership with the Nez Perce Tribe Watershed Program. Contractors are required to provide all labor, equipment, and supervision, and must submit a technical approach that includes COVID-19 mitigation measures and a Stormwater Pollution Prevention Plan to ensure site safety and environmental compliance.

General Info

Contract Value

$693,942

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Elk City, ID, 83525, USA

Set-Aside

SBA

Award Issued Date

Documents

8

Amendment 1 - Crooked River Valley Rehabilitation Phase 3

DOC, High priority: read this first2 pages · amendment
High

Crooked River Valley Rehabilitation Phase 3 drawings

PDF, High priority: read this firstsow
High

Crooked River Valley Rehabilitation Planting Plan

PDF, High priority: read this firstsow
High

RFP including Attachment J1

DOCX, High priority: read this first62 pages · rfp
High

SWPPP Template – Crooked River Valley Rehabilitation

DOCX, High priority: read this first23 pages · sow
High

Technical Specifications Phase 3 and Planting

DOCX, High priority: read this firstsow
High

Attachment J-6 Aerial Photos

PDF, Low priorityaerial-photos
Low

Past Performance Questionnaire

DOC, Low priority2 pages · past-performance
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Forest Service
Contacts1 person available
OfficeCOEUR D ALENE, ID, 83815, USA
Office AddressCOEUR D ALENE, ID, 83815, USA

Full Description

Show more
The objective of the Crooked River Valley Rehabilitation Project is to address the impacts of historical dredge mining on aquatic habitat conditions. The Crooked River Valley Rehabilitation project was designed to be constructed in multiple phases over 6 years. The phases completed to date have accomplished construction of a bypass channel and levee/haul road, rebuilding floodplain and river channel, and adding large wood structures to the newly constructed channel. Work to be completed in Phase 3 includes includes construction of approximately 4300 linear feet of additional large wood structures, 2800 linear feet of brush fascine Type 1 and 900 linear feet of brush fascine Type 2 and up to 32 acres of floodplain roughness. Planting of approximately 12,000 riparian plants ranging from 1-gallon to 8-gallon in size, all government-furnished, will also be performed in Phase 3. The contractor shall be responsible for coordinating and contracting for the haul and delivery of the plants to the site of work from the grower, Wildlife Habitate Nursery, located in Princeton, Idaho. Along with appropriate transport, the contractor shall provide proper on-site storage and care of planting material to ensure the health and vitality of the nursery stock prior to planting. The contractor shall furnish all labor, equipment, operating supplies supervision, transportation, materials (except those designated as Government-furnished), and incidentals necessary to complete the project as required by the contract, plans, and specifications. The project is being performed on the Red River Ranger District of the Nez Perce-Clearwater National Forests in collaboration with the Nez Perce Tribe Watershed Program and funded by Bonneville Power Administration. In addition, US Forest Service stewardship funds are also planned for use in order to meet watershed restoration goals. The project area is located approximately 45 mi east of Grangeville, Idaho. At the junction of Highway 14 and the Crooked River Road (FR 233), travel south for approximately 0.25 mile to the project area. The Government's construction estimate is between $500,000 and $1,000,000. Construction work shall commence approximately June 20, 2020; all work shall be completed by October 15, 2020. Although it is anticipated that most work will occur in dry soil conditions, in pools and areas that have held water following spring flows, work shall not commence until fish salvage is complete after the July 15, 2020 instream equipment operation window. Routine and public access to our facilities are temporarily suspended to help protect the public from the spread of COVID-19. Due to this fact, all offer documents, including a scanned copy of the required bid bond, shall be submitted electronically to Karen Ruklic at contact@example.gov. The original bid bond shall be mailed to the address referenced in the RFP, postmarked no later than the offer deadline. See RFP Sections B-3, L-4 and L-5 for details. Please note that the Contracting Office information that auto-populates into the notice is incorrect. The correct office information for Karen Ruklic is 104 Airport Road, Grangeville, ID 83530. The solicitation was amended on 4/15/2020 to correct a minor drawing discrepancy and to add language to Section M-1 (a) 3) Technical Approach/Production Schedule requiring submission of a plan addressing COVID-19 mitigation measures. Deadline for receipt of offers was not extended.

More opportunities from Department Of Agriculture → USDA Forest Service

Same awarding agency

NAICS: 621111
New
Federal
Jacobs Creek JCC Medical Services
Solicitation # 1282A727Q0002
Solicitation 1282A727Q0002 is a Request for Quotation issued by the USDA Forest Service for on-site medical services at the Jacobs Creek Job Corps Center in Bristol, Tennessee. This firm-fixed-price contract is 100% set aside for small businesses under NAICS code 621111. The scope of work requires licensed medical professionals, such as Physicians, Nurse Practitioners, or Physician Assistants, to provide basic health services including examinations, assessments, treatment, immunizations, and prescription issuance. Services are typically required one to two days per week, Monday through Friday, from 8 am to 5 pm, totaling 400 hours per year. The contract structure consists of a base year running from January 11, 2027, to January 10, 2028, with four one-year options and a final six-month extension. Award will be based on best value, with technical capability and past performance weighted more heavily than price. To be considered responsive, offerors must submit a completed Quoter’s Questionnaire, current resumes for key personnel, unrestricted medical licenses, DEA registrations, and proof of medical liability insurance of at least 1 million dollars. All services must comply with OSHA, HIPAA, and American Medical Association guidelines. Invoices are to be submitted monthly via the Invoicing Processing Platform. Quotations must be submitted in Word or PDF format to the designated point of contact by 5:00 PM Eastern Time on November 17, 2026.
Offices of Physicians (except Mental Health Specialists)

POSTED

about 14 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237310
New
Federal
GAOA Brainard Lake Recreation Area Deferred Maintenance
Solicitation # 1240LT27Q0004
Solicitation 1240LT27Q0004 is a Request for Quotation issued by the USDA Forest Service for deferred maintenance and accessibility improvements at the Niwot Picnic Trailhead within the Brainard Lake Recreation Area near Ward, Colorado. This project, estimated between $100,000 and $250,000, is a 100% Total Small Business Set-Aside under NAICS 237310. The scope of work includes demolishing existing timber parking barriers and retaining walls, constructing new rock retaining walls and timber steps, creating accessible compacted aggregate trails, renovating and constructing picnic sites, and revegetating disturbed areas. The contractor must commence work within 10 calendar days of the notice to proceed and complete all tasks, including final cleanup, within 120 calendar days. The contract is awarded based on the lowest price technically acceptable criteria, evaluating the offeror's technical approach and past performance on at least three similar projects completed within the last three years. Required submissions include a signed SF1442, a priced Schedule of Items, a technical proposal, and bid guarantees. Key compliance requirements include adherence to Davis-Bacon wage determinations, OSHA safety regulations, and MUTCD standards for signage. Performance and payment bonds are required, and the contractor must submit a company-approved accident prevention plan and evidence of insurance before beginning on-site work. Inspection and final acceptance are governed by FAR 52.246-12.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in about 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS