Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Cross-Connection Control Specialist and Backflow Prevention Assembly Tester Services for Cross-Connection Control Program Support

Closed
RFP-2026-010State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements Redesign Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC, plumbing, and testing infrastructure. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This solicitation is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls, for further details.
GSE Construction Co., Inc.

POSTED

about 11 hours ago

DEADLINE

in 1 day
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in Belmont, North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, alongside the demolition of existing pumps and piping. The completed facility must include mechanical and electrical systems, pumps, a generator, odor control equipment, stormwater facilities, and fencing. Additional requirements include the installation of new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents. Bidders must provide a signed bid form, bid security, evidence of authority to do business in North Carolina, and specific MWBE documentation, including a Good Faith Efforts Form and Table A, to meet participation goals of 10 percent for the State of NC and approximately 10 percent for the EPA. The project is governed by EJCDC C-700 General Conditions and Supplementary Conditions, requiring performance and payment bonds as well as proof of insurance. Administration is managed by the City of Belmont with Willis Engineers serving as the project engineer.
Don Moorhead Construction, Inc.

POSTED

about 11 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The Zone 7 Water Agency is soliciting proposals under RFP-2026-010 for a qualified consultant to provide professional services supporting its Cross-Connection Control Program. The primary objective is to ensure compliance with the State Water Resource Control Board's Cross-Connection Control Policy Handbook to protect the public water system from backflow and back-siphonage. The scope of work includes the testing, repair, and replacement of backflow prevention assemblies, as well as annual visual inspections of up to 30 air gaps at agency facilities, including the Patterson Pass Water Treatment Plant. The selected consultant must provide a revised draft of the agency's implementation plan and develop standard operating procedures with final deliverables due by December 1, 2027. The contract is anticipated to run from January 2027 through December 31, 2029, with an option to extend for an additional two years through 2031. A critical requirement of the contract is the ability to respond to emergency requests for critical work within three hours and provide a resolution within eight hours. All field services must be performed by testers with certifications recognized by the State Water Resource Control Board. Consultants are required to maintain comprehensive insurance, including Commercial General Liability of at least 2 million dollars per occurrence and Professional Liability coverage. Selection will be based on a two-step process involving a written proposal and potential interviews, with a maximum score of 110 points. Evaluation criteria heavily weight project understanding, technical approach, and team experience. Proposers must submit their bids by September 4, 2026, including a cost matrix and fee schedule. The agreement also mandates compliance with the California Prevailing Wages Act and registration with the Department of Industrial Relations.

General Info

Agency seeks a Cross-Connection Control Specialist and Backflow Prevention Assembly Tester by September 4.

Documents

5

Insurance Requirements Appendix for Zone 7 Services Agreement

DOCX, High priority: read this firstinsurance-requirements
High

RFP-2026-010 Cross-Connection Control Specialist and Backflow Prevention Assembly Tester Services

PDF, High priority: read this firstrfp
High

Sample Services Agreement - Alameda County Zone 7

PDF, High priority: read this firstcontract-document
High

Zone 7 Water Agency Cross-Connection Control Plan June 2025

PDF, High priority: read this firstcross-connection-control-plan
High

Zone 7 Water Facilities 2026 Map with Known Active Devices

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Water Quality
Contacts2 people available
OfficeLivermore, CA, 94551, USA
Organization / AgencyCalifornia → Water Quality
Office AddressLivermore, CA, 94551, USA
Contacts
Brian KeilWater Resources Planner

Interested Companies (8)

EntramPORT CHARLOTTE, FL
Carollo EngineersBuford, GA
Michael J MacdonaldRancho Cordova, CA

See All 8 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
On December 19, 2023, the State Water Resource Control Board (SWRCB) adopted the Cross-Connection Control Policy Handbook (CCCPH). The CCCPH became effective on July 1, 2024, and replaced Title 17, the original statute governing cross-connection controls, on January 1, 2025. The purpose of the CCCPH is the protection of public health through the establishment of standards to protect the public water system's potable distribution system through the prevention of any potential backflow or back-siphonage of water from end-user sources back into the potable distribution system. The Agency falls under the CCCPH definition of a Public Water System and is subject to the CCCPH requirements. In order to provide a safe and reliable supply of water for the Tri-Valley area, the Agency submitted a plan in compliance with all the elements to the SWRCB on July 1, 2025. This plan may require revisions if requested by the SWRCB. The Agency currently has twenty air gaps and ninety-one backflow prevention assemblies in its water system. The Agency owns all backflow prevention devices within its facilities. The Agency's retail customers are responsible for managing their own cross-connection control programs. The Agency has water supply contracts with its direct customers that allow access and testing of all backflow prevention devices.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS