This Solicitation opportunity from California was posted on June 25, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The City of Los Angeles Harbor Department is seeking proposals from qualified entities to develop and operate the cruise terminals at the Port of Los Angeles, specifically the Inner and Outer Harbor terminals. The project aims to enhance cruise terminal facilities and operational capabilities, with the contract valued between 50 million and 200 million dollars. Interested proposers are encouraged to submit their proposals by November 12, 2024, with the opportunity open to entities under the NAICS code 541519, which pertains to other computer related services, indicating a possible emphasis on technological or operational innovations. The contract is managed by the Harbor Department of Los Angeles, California, and is part of a solicitation process designed to select a capable developer or team to undertake this significant development and operational role.
Proposals should demonstrate the ability to meet the project’s scope and requirements, with contact details provided for further inquiries, notably through Tanisha Herr at the Harbor Department. The project represents a substantial investment in the port’s cruise infrastructure, aiming to improve passenger experience and operational efficiency, ultimately supporting the port’s broader economic and maritime objectives. The solicitation is publicly accessible via the provided online link, allowing interested parties to review detailed requirements and submission procedures.
HighAI Summary for 1-2262 Prestressed Concrete Pile Installation Notes: Technical installation notes for prestressed concrete piles, including hammer energy requirements (78-155 or 48-105 foot-kips), alignment tolerances, grout specifications for dowl tubes, and bidding estimates for hammer blows and total counts.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 1-2325A Conformed Berth 93 2002 Renovation: Technical specifications and construction notes for the Berth 93 2002 Renovation project. The document includes detailed requirements for elevator systems (KONE HH Series), fire protection, HVAC installations (Carrier AC units, Titus diffusers), and mechanical components including condensate drain pumps and fire/smoke dampers.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 1-3078 Berth 45-49 Outer Harbor Site Improvements: Technical construction documents for the Port of Los Angeles Engineering Division project 1-3078. The file contains horizontal control pierhead points, grading and paving plans (Area 2), storm drain plans (Area 1), striping and fencing plans (Area 2), and specific coordinate data for site improvements at Berths 45-49.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 1-390 Drawing Index/Set: This document is a comprehensive drawing index for project 1-390, listing technical plans and specifications including general plans, pile layouts, deck reinforcing, pile cap girders, fender systems, piping, and electrical plans, as well as various standard detail drawings.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 35 59 14 Floating Marine Fender Specifications: Technical specifications for the procurement of 28 net-less foam-filled high-capacity floating marine fenders (10ft diameter by 16ft long). The document details material requirements (ASTM standards), energy absorption capacities, submittal requirements, quality assurance, and specific product configurations for the Port of Los Angeles.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment #1 - Cruise Terminal Development and Operations RFP: Issued July 5, 2024, by the Port of Los Angeles, this amendment provides details regarding a non-mandatory site tour for the Cruise Terminal Development and Operations RFP. The tour is scheduled for July 23, 2024, at 10 a.m., with an RSVP deadline of July 16, 2024.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Berths 87-90 Wharf Cruise Ship Improvements - Engineering Specifications: Technical specifications and engineering notes for wharf cruise ship improvements at Berths 87-90. The document details requirements for miscellaneous steel fabrication (AISC/ASTM A36), pile wrapping (PVC plastic barrier), fender installation, and specific hardware/anchorage standards (Simpson SET) for the Engineering Division.
XLSX
XLSX, High priority: read this firstspecifications
HighAI Summary for Cruise RFP Historical Wharfage, Ship Calls and Passengers: A data sheet providing historical cruise wharfage revenue for the Port of Los Angeles from 2011 to 2023, intended as supporting technical or financial data for a cruise-related RFP.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Cruise Terminal Development and Operations RFP: Issued June 27, 2024, by the City of Los Angeles Harbor Department, this RFP seeks qualified entities to develop and operate the Inner and Outer Harbor cruise terminals at the Port of Los Angeles. The project involves the construction of a new Outer Harbor Cruise Terminal and the redevelopment of the existing Inner Harbor Cruise Terminal under a long-term lease of up to 66 years. The document includes a schedule of events with proposals due November 12, 2024, and outlines project objectives, site descriptions, and evaluation criteria.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Geotechnical Investigation Report - Berth 49 Los Angeles Harbor (Project 76-106-AE): A geotechnical investigation report dated November 29, 1976, prepared by Converse Davis Dixon Associates for the City of Los Angeles Harbor Department. The document analyzes a land slippage event that occurred on June 27, 1976, at Berth 49, attributing the failure to a weak bedding plane in Malaga mudstone bedrock triggered by excessive iron ore stockpiling. It includes pile foundation recommendations for Conveyor No. 5 (Towers 7 and 8) and proposes remedial measures for facility restoration.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for PO 2544 - Soil Investigation North of Berths 45-50: A June 1960 technical report by Dames & Moore for the Los Angeles Harbor Commission regarding soil investigation of a filled-in area north of Berths 45-50. The document details subsoil conditions based on two test borings, evaluates the site's capacity to support heavy storage loads (such as iron ore), and provides recommendations for soil strengthening and loading alternatives to prevent foundation failure.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Port of Los Angeles - Berths 90-92 and 93A-93B Cruise Terminal Waterside Improvements: Technical specifications and engineering notes for waterside improvements at the Port of Los Angeles, Berths 90-92 and 93A-93B. The document details requirements for pile replacement, wrapping standards, hardware installation (Simpson SET), and wharf face modifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Port of Los Angeles - Specification 1565: Wharf at Berths 49 & 50: Technical specification and drawing index for the Port of Los Angeles Wharf at Berths 49 & 50. The document includes a comprehensive list of drawing numbers and titles covering site plans, wharf cross-sections, dredging, piling, deck plans, reinforcing, and utility details, as well as specific technical details for crossing frogs.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Report of Foundation Investigation - Berths 43 through 51, Los Angeles Harbor: A geotechnical foundation investigation report dated September 18, 1964, prepared by Dames & Moore for the Los Angeles Harbor Department. The document details the results of soil borings, laboratory tests, and stability analyses for proposed bulk materials handling facilities at Berths 43 through 51. It provides critical technical data on subsurface soil conditions, including hydraulic fill and siltstone formations, and offers recommendations for foundation treatment and settlement estimates to support ore storage piles.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Spec 2686A - Berths 90-91 Cruise Terminal Baggage Handling Building: Conformed specifications for the Berths 90-91 Cruise Terminal Baggage Handling Building (Spec No. 2686A, Contract No. 2242). The document includes a table of contents for bidding requirements, contract terms, and general requirements (Division 1), as well as Addendum No. 1 and Addendum No. 2 dated January 2007, which modify the original specifications and drawings.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Spec 2686A - Berths 90-91 Temporary Cruise Terminal Baggage Handling Building: Technical specifications and engineering drawings for the Berths 90-91 Temporary Cruise Terminal Baggage Handling Building for the City of Los Angeles Harbor Dept. Dated 10/6/2004, the document includes membrane wall assembly U-values, construction notes for concrete and paving, storm drain standards (APWA), trench drain layouts, and code compliance data.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Spec No. 2553: Port of Los Angeles Berths 48-50 Equipment Removal: Technical specifications and drawing index for the removal of equipment at Port of Los Angeles Berths 48-50. The document includes general notes on demolition, utility verification, debris control, and specific removal requirements for the car dumper building, conveyor systems, and ship ladders.
PDF
PDF, Low priorityother
LowAI Summary for 1-618_B49 LATX Foundation: Unreadable document.
PDF
PDF, Low priorityother
LowAI Summary for 2006 Port of Los Angeles Cruise Study Draft Report: A draft report submitted in July 2006 by Bermello-Ajamil & Partners, Inc. for the Port of Los Angeles. The document provides a comprehensive analysis of the global and U.S. West Coast cruise industries, passenger growth projections through 2020, facility demand assessments, financial modeling for tariffs and fees, and recommendations for capital programs and business operating models.
PDF
PDF, Low priorityspecifications
LowAI Summary for Agreement 1128: Geotechnical Investigation and Field Instrumentation Program at Berth 49: Final report dated March 31, 1980, submitted by Converse Ward Davis Dixon, Inc. to the Port of Los Angeles. The document details a geotechnical investigation and instrumentation program at Berth 49 following a 1976 land slippage event. It includes an executive summary of monitoring data from test and control areas, conclusions on the mechanism of land slippage in Malaga mudstone, and recommendations for a stress-relieving structure as a remedial scheme.
PDF
PDF, Low priorityspecifications
LowAI Summary for Agreement 1128: Geotechnical Investigation and Field Instrumentation Program at Berth 49: Final report dated March 31, 1980, submitted by Converse Ward Davis Dixon, Inc. to the Port of Los Angeles. The document details a geotechnical investigation and instrumentation program at Berth 49 to analyze land slippage that occurred in June 1976. It includes an executive summary of monitoring data from test and control areas, conclusions on the mechanism of land slippage in Malaga mudstone, and recommendations for a stress-relieving remedial structure and long-term monitoring.
PDF
PDF, Low priorityq-and-a
LowAI Summary for Cruise Development and Operations - Responses to Draft RFP: This document contains a table of developer comments and official responses regarding a draft Request for Proposal (RFP) for Cruise Development and Operations at the Port of Los Angeles. It addresses inquiries from various entities (e.g., Ports America, SSA Marine, Global Port Holdings) concerning procurement structure, site descriptions, berth extensions, and the relocation of the USS Battleship Iowa.
PDF
PDF, Low priorityother
LowAI Summary for Port of Los Angeles - Berth 88 Mooring Fender Modification: The document appears to be a cover page or title page for a project titled 'Berth 88 Mooring Fender Modification' from the Port of Los Angeles Engineering Division. No further technical details or solicitation instructions are provided in the content.
PDF
PDF, Low priorityother
LowAI Summary for Port of Los Angeles Green Building Policy (August 7, 2007): A board letter dated August 7, 2007, from the Engineering department proposing the adoption of a Green Building Policy for the Port of Los Angeles. The policy establishes a commitment to sustainable practices by requiring a minimum LEED Gold Rating for new constructions over 7,500 square feet, incorporating solar panels, and utilizing USGBC-LEED standards. This action serves as a response to the Mayor's Executive Directive No. 10 regarding sustainable practices in the City of Los Angeles.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for Port of Los Angeles Green Building Policy Resolution: A 2007 resolution by the Board of Harbor Commissioners establishing green building standards for the Port of Los Angeles. The policy mandates that new constructions of 7,500 sq. ft. or more meet specific LEED certification levels (Gold for office buildings, Silver for marine utilitarian buildings) and requires the evaluation of existing buildings against LEED EB standards.
PDF
PDF, Low priorityother
LowAI Summary for Port of Los Angeles Sea Level Rise Adaptation Study: A technical study prepared by AECOM for the Port of Los Angeles (POLA) in accordance with Assembly Bill 691. The document identifies areas projected to be exposed to sea level rise (SLR) by 2030, 2050, and 2100, assesses asset vulnerabilities, and proposes adaptation strategies to ensure the long-term viability of the port's infrastructure and operations.
PDF
PDF, Low priorityother
LowAI Summary for Project 76-106-AE: Geotechnical Investigation Progress Report - Berth 49: A progress report dated July 26, 1976, submitted by Converse Davis Dixon Associates to the City of Los Angeles Harbor Department. The document provides preliminary pile foundation recommendations for Conveyor No. 5 (Towers 7 and 8) at Berth 49 following a mass slippage event. It includes analysis of subsurface conditions, recommended vertical and uplift pile capacities based on embedment in weathered mudstone, and construction guidance regarding hammer energy and driving resistance.
PDF
PDF, Low priorityspecifications
LowAI Summary for Supplemental Foundation Investigation - Bulk Material Handling Facility (Berths 43-51): A technical geotechnical report dated February 1957 (with references to 1960-1965 studies) prepared by Dames & Moore for the Los Angeles Harbor Department. The document details a supplemental foundation investigation for the Bulk Material Handling Facility at Berths 43 through 51, focusing on soil stability, hydraulic fill strength, and the impact of ore pile loading on subsoil consolidation and shearing deformations.
PDF
PDF, Low priorityspecifications
LowAI Summary for Supplementary Soils Investigation - Berths 43-51 Los Angeles Harbor: A technical report dated December 10, 1976, prepared by Dames & Moore for the Los Angeles Harbor Department. The document details a supplementary soils investigation following a slide that occurred on June 27, 1976, at the bulk loading facility (Berths 43-51). It includes analysis of subsurface conditions, failure mechanisms, and recommendations for future use and remedial construction.
PDF
PDF, Low priorityother
LowAI Summary for Tips for a Successful Proposal Submission for Harbor Department RFP: This document provides administrative tips for proposers submitting personal services proposals to the Harbor Department. It emphasizes careful adherence to the Proposal Submission Checklist in the RFP, including mandatory submission of the Affidavit of Company Status form and Consultant Description Form, even without SBE/VSBE requirements. It details the specific requirements for the Insurance Verification Letter, clarifying unacceptable documents and stressing the importance of compliance to avoid non-responsiveness. Additionally, it requires a Standard Provisions Letter confirming acceptance of the Harbor Department's contract provisions and demographic reporting compliance. The document aims to help proposers avoid common administrative mistakes and offers contact information for questions.
The City of Los Angeles Harbor Department (Harbor Department) invites the submittal of proposals from qualified entities (Developer, Developers, Proposer or Proposers) to develop and operate the Inner and Outer Harbor cruise terminals at the Port of Los Angeles.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award