Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on June 2, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CS UPS & COOLING SYSTEM

Closed
W50S8W25Q0011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract involves the comprehensive upgrade and maintenance of the WYANG data center's power and cooling systems. The vendor is responsible for removing outdated equipment and installing new components in accordance with accepted standards. Key tasks include replacing the cooling fluid and piping, installing a new 350A shut trip breaker with a NEMA-1 enclosure, and integrating the existing emergency power off system with the new breaker. Additionally, the contractor will shut down and remove the existing uninterruptible power supply (UPS), dispose of old units, and install new power modules and battery cabinets. The work assumes the structural integrity of the raised floor is sufficient for moving and installing the new UPS at the existing location, with any modifications to the raised floor handled by others. A site visit is scheduled for June 16, 2025, at 0900 MDT in Cheyenne, Wyoming, with participation contingent upon prior requests by June 11, 2025. Questions regarding the contract are due by June 19, 2025. The solicitation, titled "CS UPS & COOLING SYSTEM," is a total small business set-aside under NAICS code 335999, with a response deadline of July 2, 2025. The contract is managed by the Department of the Army, W7N9 Uspfo Activity WYANG, with points of contact Kristopher Kahle and Christopher Davalos.

General Info

Remove and replace UPS and cooling systems at WYANG Cheyenne facility, with project management required.

NAICS

335999 - All Other Miscellaneous Electrical Equipment and Component Manufacturing

Place of Performance

Cheyenne, WY, 82009, USA

Set-Aside

SBA

Documents

4

Provisions and Clauses W50S8W25Q0011

PDF, High priority: read this first41 pages · provisions-and-clauses
High

PWS - UPS Cooling Replacement and Upgrade

PDF, High priority: read this firstsow
High

UPS and Cooling System for 153 NCC - Product Description

PDF, High priority: read this firstsow
High

W50S8W-25-Q-0011 - 153 CS UPS & COOLING SYSTEM

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7N9 Uspfo Activity Wyang 153
Contacts2 people available
OfficeCHEYENNE, WY, 82009-4799, USA
Office AddressCHEYENNE, WY, 82009-4799, USA

Full Description

Show more
The vendor shall provide un-installation of outdated equipment and installation of brand-new items according to acceptable standards. Contractor shall provide Uninterruptible Power and Cooling Distribution Unit replacement/ installation and a Site Lead/Project Manager to provide the following critical tasks to support to the WYANG per the PWS. - 5.3.3 Capture existing cooling fluid/Re-fill system with cooling fluid. - 5.3.4 Demo existing piping - 5.3.5 Run new Pex piping to the in-row coolers. - 5.3.6 Furnish & install new 350A shut Trip Breaker with nema-1 Enclosure. Tie existing EPO into new Shunt Trip breaker. - 5.3.7 Existing 3 Feeder conduit & wire fed from MDP will be shutdown & locked out. Intercept existing Feeder to line side of new 350A Shunt Trip Breaker/Enclosure. Install Load side Feeder conduit & wire from new Shunt Trip Breaker to new UPS. - 5.3.8 Demo existing UPS, remove from Data Center, Dispose/recycle old UPS. - 5.3.9 Install Power Modules and Battery Cabinets - 5.3.10 Assume the existing structural integrity of raised floor is sufficient to move old UPS across floor & new UPS installed at old UPS location. All raised floor modifications by others. QUESTIONS DUE: 12 JUNE 2025

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS