Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Hawaii was posted on May 17, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CS1421-53 Automated Checkpoint Exit Lanes

Closed
B24002848State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 13 hours ago

DEADLINE

in 12 days
NAICS: 238910
New
SLED
26-037-CIP
Solicitation # 26-037-CIP
The SportsOhio PowerPlay Demolition project, identified as solicitation 26-037-CIP, is a City of Dublin, Ohio, contract for the demolition and restoration of specific areas at 6314 Cosgray Road. The scope of work includes the removal of the Can-Am/go cart track, batting cages, a concrete seating pad, associated walkway connections, and a mini golf course. The project has an engineer's estimate of $259,606.50 and must be completed by April 30, 2027. Key technical requirements include adhering to the 2026 City of Dublin and City of Columbus Construction and Material Specifications, following National Electric and Safety Codes, and ensuring tree clearing occurs specifically between October 1 and March 31. Bids are submitted via Bid Express and are evaluated based on a lowest and best analysis, with a strong preference for Ohio-based bidders or those from reciprocal border states. Qualified bidders must provide a bid guaranty per the Ohio Revised Code, evidence of similar experience, and a noncollusion affidavit. The contract mandates the payment of prevailing wages and requires the use of domestic source end products. Payment is structured monthly at a rate of 95% until the work is 50% complete, after which the retention amount may be reduced at the City's discretion. All inspections are managed by the City of Dublin, though the contractor must coordinate utility abandonment inspections with AEP, Columbia Gas, and other communications companies.
City of Dublin, OH - Engineering

POSTED

about 14 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The contract involves the installation of fabricated Automated Checkpoint Exit Lanes, also known as Automated Exit Lane Breach Controls, at multiple locations within Hawaii's major airports. The scope includes selective demolition, installation of doors, walls, and partitions, and the integration of these new systems with existing security and communication infrastructure. The work is to be carried out at two checkpoints in Terminal 1 (checkpoint 1E) and Terminal 2 (checkpoint 5) at Daniel K. Inouye International Airport in Honolulu, as well as at the TSA precheck checkpoint at Kahului Airport in Maui. The project encompasses the configuration, commissioning, and thorough testing of all installed systems to ensure proper functionality. This solicitation, titled CS1421-53 Automated Checkpoint Exit Lanes, was posted on May 17, 2024, with a response deadline of June 13, 2024. The project is estimated to cost between 1.5 million and 3 million dollars and is managed by the Hawaii Department of Transportation. The primary point of contact for inquiries is Rachael Hui Jin Park, reachable via email at [email hidden] or by phone at [phone hidden]. The project aims to enhance security and streamline checkpoint operations at these critical transportation hubs.

General Info

Place of Performance

HI, USA

Set-Aside

NONE

Documents

2

CS1421-53 Automated Checkpoint Exit Lanes

PDF, High priority: read this firstrfb
High

CS1421-53 Automated Checkpoint Exit Lanes - Final Plans

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyHawaii Department of Transportation
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
The scope of work consists of installation of fabricated Automated Checkpoint Exit Lanes (Automated Exit Lane Breach Controls) from an approved vendor, selective demolition, installation of doors, walls and/partitions, integration to existing security and communications systems; configuration, commissioning and testing of all systems at two (2) checkpoints, Terminal 1 checkpoint 1E and Terminal 2 at checkpoint 5 at Daniel K. Inouye International Airport, Honolulu, and one (1) at the TSA precheck checkpoint at Kahului Airport, Maui.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS