This Solicitation opportunity from Texas was posted on January 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Harris Health issued a Competitive Sealed Proposal for the replacement of MRI scan equipment and the renovation of the MRI suite at the Smith Clinic in Houston, Texas, with an estimated budget of $1,924,067. The project involves comprehensive construction activities, including interior renovations, cosmetic upgrades, and the installation of new equipment, managed via a single prime contract with a Construction Manager. Key technical requirements include adherence to strict shielding effectiveness standards, the installation of specialized interior signage in English and Spanish, and compliance with various safety and building codes such as NFPA, IBC, and OSHA. A pre-construction asbestos survey confirmed no asbestos-containing materials were present in the sampled areas.
The contract was awarded to JE Dunn Construction following a best-value evaluation process that weighted pricing at 50%, qualifications and safety at 30%, and technical approach at 20%. Awardees must comply with a 25% MWBE utilization goal and adhere to Harris County prevailing wage requirements, including a minimum wage of $21.65 per hour. Contractors are required to provide factory-trained technicians certified at the Advanced Integrator level for specific systems and must submit detailed construction schedules and O&M manuals. Performance is monitored through on-site inspections and acceptance testing, with final payment processed via AIA G702/G703 forms through the Newforma Info Exchange software.
HighAI Summary for Addendum 2 - 260002: Bid Bond Confirmation and Bid Check Return Authorization Form: This document is Addendum 2 for Job No. 260002, providing a formal Bid Bond Confirmation and Bid Check Return Authorization Form. It outlines the requirements for submitting cashier's checks as bid bonds via Bonfire and physical delivery to Harris County, and includes an authorization for the County to return unsuccessful bid checks via mail.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Division 27 Communication Specification 20250826: Technical specifications document for Division 27 Communications, containing floor plans for Level 3 Area A.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Division 28 Access and Surveillance Systems - Level 5 Composite Plan: A technical drawing or plan document for Division 28 Access and Surveillance Systems, specifically detailing the Composite Plan for Level 5.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Harris County Prevailing Wage Rate Instructions and General Decision TX20260253: This document outlines the prevailing wage rate requirements and payroll submittal instructions for construction projects in Harris County, Texas. It includes General Decision Number TX20260253 (dated 01/02/2026), specifying hourly rates and fringes for various trades including asbestos workers, electricians, and plumbers. It details compliance mandates, including weekly certified payroll submissions via DEEO software, the requirement to display wage posters, and penalties for non-compliance under Texas Government Code Chapter 2258.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Harris County Prevailing Wage Rate Instructions and Wage Decision TX20260253: This document provides prevailing wage rate instructions and a detailed wage decision (TX20260253, dated 01/02/2026) for building construction projects in Harris County, Texas. It outlines payroll submittal requirements via DEEO software, compliance monitoring, and penalties for underpayment per Texas Government Code Chapter 2258. It includes a comprehensive schedule of hourly rates and fringes for various trades, including electricians, carpenters, and plumbers, and mandates adherence to the Harris County Contractor Minimum Wage of $21.65/hour.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Harris Health System - Skilled Trade Protections Policy: This document is Exhibit 'A' of the Harris Health System Policy and Regulations Manual, effective September 28, 2023. It mandates skilled trade protections for bond-funded construction contracts valued at $10M or more, including a minimum wage of $15/hour or Davis-Bacon Act rates, a 10% apprenticeship hour requirement, and OSHA safety record tracking.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for HHS Smith Clinic Pre-TAB Report: A Pre-Testing, Adjusting, and Balancing (Pre-TAB) report dated February 25, 2025, for the Harris Health Systems (HHS) Smith Clinic in Houston, TX. The document, prepared by NEBB-certified Page Southerland Page, Inc., identifies 16 specific technical issues and recommendations regarding AHUs, VAV terminal units, and exhaust fans, including duct leakage, PID loop tuning errors, and BAS setpoint discrepancies. It includes a table of contents for equipment profiles and professional certifications.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Job No. 26/0002 Addendum No. 1 - MRI Scan Equipment and Suite Renovation: Addendum No. 1 for Job No. 26/0002 regarding MRI Scan Equipment Replacement and MRI Suite Renovation at Smith Clinic for Harris Health. This document extends the proposal due date from March 9, 2026, to March 23, 2026, at 2:00 p.m. local time.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Job No. 26/0002 Addendum No. 1 - MRI Scan Equipment Replacement and MRI Suite Renovation: Addendum No. 1 for Job No. 26/0002 regarding the MRI Scan Equipment Replacement and MRI Suite Renovation at Smith Clinic for Harris Health. This document extends the proposal due date from March 9, 2026, to March 23, 2026, at 2:00 p.m. local time.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Job No. 26/0002 Addendum No. 2 - MRI Scan Equipment Replacement and MRI Suite Renovation: Addendum No. 2 for Job No. 26/0002, dated March 13, 2026, regarding the MRI Scan Equipment Replacement and MRI Suite Renovation at Smith Clinic for Harris Health. This document revises the MWBE goal to 25%, adds 18 new technical documents (including GE Healthcare manuals and site reports), and provides formal responses to 22 vendor questions regarding equipment specifications, permitting, and site logistics. The submission deadline is March 23, 2026.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Job No. 26/0002 Addendum No. 2 - MRI Scan Equipment Replacement and MRI Suite Renovation: Addendum No. 2 for Job No. 26/0002, dated March 13, 2026, regarding the MRI Scan Equipment Replacement and MRI Suite Renovation at Smith Clinic for Harris Health. This document updates the MWBE goal to 25%, adds 18 new technical documents (including GE Healthcare manuals and site drawings), and provides a detailed Q&A session addressing technical specifications, equipment responsibility, and site logistics.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Job No. 26/0002 - MRI Scan Equipment Replacement and MRI Suite Renovation: Competitive Sealed Proposal (CSP) issued by Harris Health for the replacement of MRI scan equipment and renovation of the MRI suite at Smith Clinic. The document outlines the procurement schedule, mandatory pre-proposal conference on February 17, 2026, scope of work, and evaluation criteria (Qualifications 30%, Technical Approach 20%, and Pricing 50%). Proposals are due by March 9, 2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Project 92257965 - Smith Clinic Path-of-Construction Asbestos Survey Report: An asbestos survey report dated September 19, 2025, prepared by Terracon Consultants, Inc. for Harris Health System. The report details an interior path-of-construction (POC) survey conducted on September 16, 2025, at the Smith Clinic (1st Level) to identify asbestos-containing materials (ACM) prior to renovations of Linear Accelerators, CT Scans, and Rad Fluoroscopy rooms. The survey concluded that no asbestos-containing materials were identified in the sampled materials.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Project No. 422089.05 - Harris Health SCP ACS SC MRI Scan 1.5T Replacement: Construction documents and technical specifications dated September 19, 2025, for the interior renovation and cosmetic upgrades to support MRI equipment replacement at Harris Health (2525 Holly Hall, Houston, TX). The document includes a comprehensive Table of Contents covering multiple divisions (General Requirements, Concrete, Electrical, HVAC, etc.) and Section 011000 - Summary, which defines the project scope and the use of a Construction Manager as the single prime contract.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Project No. 422089.05 - SCP ACS SC MRI Scan Replacement Room Signage: Issued September 19, 2025, this document provides the sign counts and detailed message schedule for the SCP ACS SC MRI Scan Replacement (1 & 3) project (Project No. 422089.05). It specifies interior signage types, including room identification, MRI zone identification, and legal notices in English and Spanish, along with mounting instructions and sheet references.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Project No. 422089.05 - SCP ACS SC MRI Scan Replacement Room Signage: Issued on September 19, 2025, for construction, this document provides the sign count and detailed message schedule for the SCP ACS SC MRI Scan Replacement (1 & 3) project. It specifies sign types, descriptions, mounting locations, and exact text (including Spanish translations and Braille requirements) for interior signage, including MRI zone identification and room labels.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Texas Workers' Compensation Law Compliance Requirements: This document outlines the mandatory workers' compensation insurance requirements for contractors and subcontractors performing building or construction work for a Texas governmental entity. It defines certificates of coverage, mandates compliance with the Texas Labor Code, and specifies the contractor's responsibility to maintain and provide proof of insurance for all personnel on the project.
PDF
PDF, Low priorityother
LowAI Summary for Building Permit Sales Order: The document appears to be a sales order for a building permit from Southernland Page, Inc., but the provided content consists primarily of repetitive address and telephone information with no substantive transaction details or procurement terms.
PDF
PDF, Low priorityaward
LowAI Summary for CSP No. 26/0002 Notice of Intent to Award - MRI Scan Equipment Replacement: Notice of Intent to Award dated May 5, 2026, for CSP No. 26/0002 regarding MRI Scan Equipment Replacement and MRI Suite Renovation at Smith Clinic. Harris Health intends to award the contract to JE Dunn Construction, pending approval by the Harris Health Board of Trustees.
PDF
PDF, Low priorityaward
LowAI Summary for CSP No. 26/0002 Notice of Intent to Award - MRI Scan Equipment Replacement: Notice dated May 5, 2026, from Harris Health announcing the intent to award CSP No. 26/0002 for MRI Scan Equipment Replacement and MRI Suite Renovation at Smith Clinic to JE Dunn Construction, pending approval by the Harris Health Board of Trustees.
PDF
PDF, Low priorityother
LowAI Summary for SV83163 - Smith Clinic MRI 1 Rm 1503 Shielding Effectiveness Test Report: Shielding Effectiveness Test Report dated July 19, 2025, for Project SV83163 at Smith Clinic MRI 1 Rm 1503 in Houston, TX. The document details RF testing performed by ETS-Lindgren in accordance with IEEE-STD 299 to verify the performance of a Nelco Inpace Shield. Results indicate multiple failures at 51 MHz, 63.86 MHz, and 76.6 MHz, specifically regarding the door, window, and penetration panels, while the walls generally passed.
PDF
PDF, Low priorityspecifications
LowAI Summary for SV83163 - Smith Clinic MRI 4th flr Shielding Effectiveness Test Report: Shielding Effectiveness Test Report dated July 19, 2025, for the Smith Clinic MRI 4th floor project (Job No. SV83163) in Houston, TX. The report details baseline RF testing of a Nelco in-place shield performed by ETS-Lindgren in accordance with IEEE-STD 299. Testing at frequencies of 51 MHz, 63.86 MHz, and 76.6 MHz resulted in 'Fail' status across multiple test positions, including the door, window, and walls. The report concludes that the shield did not pass all positions despite standard maintenance performed on the RF door.
PDF
PDF, Low priorityother
LowAI Summary for Tax Form/Debt/Residence Certification: A certification form for bidders to provide Taxpayer Identification Numbers, Harris County property details, debt disclosures to Harris County, and residency status in accordance with Texas Government Code §2252.001.
ZIP
ZIP
ZIP
ZIP
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.