Culvert Installation and Stream Crossing Stabilization

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Culvert Installation and Stream Crossing Stabilization involves performing culvert replacement and stream stabilization for prime contractors on projects managed by the California Department of Fish and Wildlife and San Mateo County Parks. The scope of work includes the removal of failing culverts, the installation of a 72 inch by 80 foot culvert, and the implementation of stabilization measures designed to prevent more than 10 cubic yards of annual sediment erosion. The project requires strict adherence to CDFW and NOAA Fisheries guidelines, as well as compliance with Lake and Streambed Alteration Agreement EPIMS-SMO-59860-R3. The final deliverable is a fully stabilized creek crossing. This work falls under NAICS code 237310 and is associated with the Fish and Wildlife Region 3 Bay Delta office in Fairfield.

General Info

Subcontract for culvert installation and stream stabilization per CDFW and NOAA guidelines.

Agency

California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield

Place of Performance

CA

Set-Aside

NONE

Documents

This scope was carved out of EPIMS-SMO-59860-R3.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Schenly Creek Crossing Stabilization (Notification of Lake or Streambed Alteration, No. EPIMS-SMO-59860-R3)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom Schenly Creek Crossing Stabilization (Notification of Lake or Streambed Alteration, No. EPIMS-SMO-59860-R3)
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs culvert replacement and stream stabilization for prime contractors on CDFW and San Mateo County Parks projects. Removes failing culverts, installs a 72" x 80' culvert, and implements stabilization measures to prevent over 10 cubic yards of annual sediment erosion. Work must comply with CDFW and NOAA Fisheries guidelines and Lake and Streambed Alteration Agreement EPIMS-SMO-59860-R3. Delivers a stabilized creek crossing.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS