Cured-in-Place Pipe (CIPP) Lining for Sewer Systems
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract involves the trenchless rehabilitation of sewer pipes through the use of cured-in-place pipe (CIPP) technology, encompassing full-service execution from initial inspection to final verification. Work includes detailed pre-inspection of existing sewer infrastructure, thorough cleaning of pipes to prepare surfaces, installation of resin-saturated fiberglass liners, and curing via heat or ultraviolet light to form a new, durable pipe within the old conduit. All work must be verified using closed-circuit television (CCTV) to ensure compliance with performance standards and structural integrity. The project is structured as a subcontract under NAICS code 238990, indicating specialty trade contracting for other construction activities, and is issued by the City of Sumter in South Carolina. Proposals must be submitted by August 19, 2026, with the opportunity posted on July 15, 2026, and all work is expected to be performed locally to address the city’s sewer system needs.
General Info
Agency
NAICS
Place of Performance
SC, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from South Carolina → City Of Sumter
Same awarding agency
