Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Illinois was posted on February 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Cured-in-Place Pipe (CIPP) Lining Installation – UV and Heat-Cured

Closed
State & Local
Submission Closed

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221320
New
Federal
Operations and Maintenance (O&M) Services for the SBIWTP
Solicitation # 191BWC26R0009
The International Boundary and Water Commission (IBWC) is soliciting proposals for the Operation and Maintenance (O&M) of the South Bay International Wastewater Treatment Plant (SBIWTP) in San Diego, California. The scope of work includes the operation of a facility designed to treat an average of 25 million gallons per day (MGD) of wastewater, including the maintenance of plant infrastructure, pavement, and comprehensive pest management. The contract consists of a base year starting June 1, 2027, and four option years, extending through May 31, 2032. A 60-day phase-in period is required, designated as CLIN 011. This is a no set-aside solicitation. Award will be made using the Highest Technically Rated with a Fair and Reasonable Price (HTR-FRP) method, where non-price factors are significantly more important than price. Technical evaluation focuses on plant operations, permit compliance, company experience, staffing, SCADA operations, plant coordination, and past performance. Proposals must be submitted in PDF format via a secure SharePoint portal by January 6, 2027. Key requirements include a 25% performance bond, strict adherence to NIST SP 800-171 for protecting Controlled Unclassified Information (CUI), and mandatory background investigations for all personnel. The contract is subject to the Davis-Bacon Act and requires a Small Business Subcontracting Plan for offerors classified as other than small.
Internat Boundary And Water Commission

POSTED

2 days ago

DEADLINE

in about 1 month
NAICS: 221320
New
SLED
Odor and Corrosion Control
Solicitation # 2027-006-JS
The City of Sarasota is soliciting bids through Invitation to Bid 2027-006-JS for a licensed Florida General Contractor to provide odor and corrosion control services at various water and wastewater treatment facilities, including lift stations. The scope of work involves the installation and maintenance of odor control process equipment and the monthly delivery of approximately 30,000 gallons of chemicals to reduce hydrogen sulfide emissions. The contractor is required to monitor all sites at least monthly and maintain 24/7 availability, with a required response time of two hours for odor complaints and four hours for equipment failures. The solicitation is open to all qualified bidders with no specific set-aside status. Award will be granted to the lowest responsible and responsive bidder, with the city reserving the right to award by individual item, group, or all-or-none. Bids must be submitted electronically as a single consolidated PDF by December 3, 2026. Requirements include compliance with OSHA standards, specific insurance coverage with an A.M. Best rating of A or better, and the use of new, standard production models for all equipment. Previous contract data indicates a total value ranging from 454,366.02 to 535,528.31, covering chemical supplies such as Ammonium Calcium Nitrate and Bioxide Plus, as well as routine maintenance and media change-outs.
Utilities

POSTED

4 days ago

DEADLINE

in 6 days
NAICS: 221320
New
International
Supply Materials for Rehabilitation of Al Baqqara PS5 Wastewater Pumping Station in Gaza City Moumen Salem - [email hidden], Tel: +970 566707707
Solicitation # LITB2026-9207498
UNICEF is soliciting bids for the supply of materials required for the rehabilitation of the Al Baqqara PS5 Wastewater Pumping Station in Gaza City. The scope of work includes the design, manufacture, supply, delivery, installation, testing, and commissioning of critical systems, including mechanical equipment such as pumps with integrated monitoring and vibration sensors, electrical systems featuring generators with electronic fuel control, and PV system items. The project also requires the provision of civil items, tools, and furniture. Technical standards include compliance with Swedish standard EN 60204-1 for electrical equipment, ISO 9906 for pump performance, and specific ASTM or BS EN standards for cement and steel anchor bolts. Additionally, the contractor must provide and configure cybersecurity and communication components for the PLC panel board, ensuring compatibility with Jawwal/Ooredoo GSM networks. Bids must be submitted by December 6, 2026, via email to [email hidden], consisting of a technical proposal (Annex B) and a financial proposal (Annex C). Evaluation is a two-step process focusing first on mandatory requirements and then on technical and commercial acceptability. The contract uses DAP Incoterms 2010 for delivery to the Gaza Entry point or UNICEF Ashdod Warehouses. Payment terms are 30 days net, with quotes required in USD. Strict packaging and marking requirements are mandated to ensure durability during transport, including specific pallet dimensions and weight limits for Gaza destinations. Final acceptance is contingent upon inspection by the Engineer at the site, and final payment may be withheld until all warranties, manuals, and certificates are submitted.
UNICEF

POSTED

5 days ago

DEADLINE

N/A
NAICS: 221320
New
International
Infrastructure - Request for Proposal - REQUEST FOR PROPOSAL (RFP) for OPERATOR SERVICES for Three Water and Wastewater Treatment Facilities for Three (3) Portfolios
Solicitation # AB-2026-07691
Alberta Infrastructure is soliciting proposals for operator services to manage water and wastewater treatment facilities across three portfolios: the Evan Thomas Water and Wastewater Treatment Facility, the Footner Lake Water and Wastewater Treatment Plant, and the Peace River Correctional Centre Water and Wastewater Treatment Plant. The selected operator will be responsible for the continuous and uninterrupted operation and maintenance of these facilities, including potable water distribution systems, ensuring all treated water and wastewater meet the quality standards defined in the contract. The project is located in Alberta, Canada, and requires the operator to maintain general liability insurance of at least $25,000,000 per occurrence. The contract is structured as an Alberta Infrastructure Operating Agreement with a term starting from the effective date, which the Province may renew for up to two years in aggregate. The Province may terminate the agreement with six months' written notice, while the operator may terminate after the initial term with twelve months' notice. Award decisions are based on the highest Adjusted Total Score, derived from a combination of qualification and fee scores. To ensure performance, the operator must provide a performance bond or irrevocable letter of credit equivalent to 2.5 times the operator's fee. There is no set-aside status for this solicitation.
Infrastructure

POSTED

7 days ago

DEADLINE

in about 1 month
NAICS: 221320
SLED
PROJECT NO. 1435 ON-CALL STAFFING AUGMENTATION, WASTEWATER PROCESSING AND TECHNICAL SUPPORT
Solicitation # 1435
Project No. 1435 is a solicitation by the City of Baltimore's Department of Public Works Wastewater Facilities Division for on-call staffing augmentation, wastewater processing, and technical support. The project aims to provide on-site operations support, technical analysis, and engineering process solutions at the Back River and Patapsco Wastewater Treatment Plants to optimize performance and ensure continuous compliance with effluent discharge permit requirements while City staff are hired and certified. The scope includes operating the Back River WWTP Headworks facility, coordinating chemical applications, performing routine sampling and laboratory analysis, and conducting root cause analysis per plant SOP. The contract has an estimated maximum value of $16,000,000 for an initial three-year period, with a possible one-year extension at the City's discretion. There is no set-aside status for this solicitation, and the MBE and WBE participation goals are both 0%. Interested firms must demonstrate experience in wastewater facility operations, NPDES permit compliant operations, and data management. Proposals must be submitted by noon on January 15, 2027, to the Office of Boards and Commissions in Baltimore, Maryland. Required documentation includes an original SF 255, a current Prequalification Certificate from the Office of Boards and Commissions, and resumes for all key personnel. The selected consultant must maintain professional, auto, general liability, and workers' compensation insurance.

POSTED

7 days ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

This subcontract involves the installation of Cured-in-Place Pipe (CIPP) liners in existing water mains for the Illinois Public Utilities (Water) | DPU-W. The scope of work includes the use of UV or heat-cure methods for liner installation, as well as comprehensive support services such as pipe cleaning, liner insertion, curing, end sealing, hydrostatic testing, disinfection, and full site restoration. The project is categorized under NAICS code 221320. The solicitation was posted on February 26, 2026, with a response deadline set for March 25, 2026. There is no specified set-aside status for this procurement.

General Info

Documents

This scope was carved out of 26-062.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ODYSSEY WEST WATER MAIN IMPROVEMENT

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Metropolitan Council Blue Lake WRRF Digester #4Open now, due in 5 days
  • New Southwest Water Resource Recovery Facility, Oskaloosa, IAOpen now, due in 5 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIllinois → Public Utilities (Water) | DPU-W
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install trenchless CIPP liners in existing water mains using UV or heat-cure methods, including pipe cleaning, liner insertion, curing, end sealing, hydrostatic testing, disinfection, and site restoration.

More opportunities from Illinois → Public Utilities (Water) | DPU-W

Same awarding agency

NAICS: 238910
SLED
South Operation Center (SOC) Digester Demolition
Solicitation # 26-114
The South Operation Center (SOC) Digester Demolition project, solicitation 26-114, is an invitation for bid issued by the City of Naperville, Illinois, for the demolition and removal of an abandoned digester located at 1800 S. Washington Street. The scope of work includes the removal of the building and tank, filling of excavations, site restoration, ancillary landscaping, and the installation of security fencing. The project must be completed by December 31, 2027, with construction operations limited to Monday through Friday, 7:00 a.m. to 4:00 p.m. The contract will be awarded to the lowest responsible bidder based on technical ability, financial capability, and past performance. Bidders must submit an electronic bid including a 10% bid deposit, an Affidavit of Compliance, and an IDOT Prequalification Certificate. The contractor is responsible for the handling and disposal of asbestos-containing tar paper and must comply with the State of Illinois Prevailing Wage Act and 2010 ADA Standards for Accessible Design. Key administrative requirements include the provision of performance and payment bonds equal to the contract price and adherence to a safety orientation checklist. Progress payments are based on a Schedule of Values, and the City maintains the right to audit records for the term of the contract and four years after final payment.
Site Preparation Contractors

POSTED

10 days ago

DEADLINE

in about 2 months
View Details
NAICS: 237110
SLED
East Highlands Sanitary Sewer Replacement Phase II
Solicitation # 26-215
The East Highlands Sanitary Sewer Replacement Phase II project (Solicitation 26-215) for the City of Naperville, Illinois, involves the filling and abandonment of existing sanitary sewers and manholes and the installation of approximately 4,400 linear feet of 8-inch and 1,000 linear feet of 10-inch sanitary sewers. The scope of work extends across E Hillside Rd, Sunset Dr, Thornwood Dr, Pine Ct, Santa Maria Dr, Willow Rd, and Diane Ln, and includes the installation of manholes and 6-inch sanitary services. Associated restoration work consists of driveway and roadway pavement removal and patching, curb and gutter replacement, traffic control, inlet protection, and landscape restoration. A specific construction restriction is in place for East Hillside Road between June 1 and August 10 to minimize disruption to local schools. The contract is a unit price agreement awarded to the responsible bidder with the lowest responsive bid. Key requirements include a bid deposit of 10% of the total bid, performance and payment bonds equal to the contract price, and a requirement that bidders have completed five similar projects within the last five years and maintain a local office within 70 miles of Naperville. Technical specifications mandate that the TV contractor be NASCO PACP certified and that all work adhere to the latest IDOT Standard Specifications. The project includes a $100,000 miscellaneous construction items allowance and a $50,000 construction contingency. Failure to meet the final completion date results in liquidated damages of $1,000 per calendar day.
Water and Sewer Line and Related Structures Construction

POSTED

10 days ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS