Cuyama Well Waterline Repair and Re-Route

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife, Region 4, is forecasting a project to repair and reroute the Cuyama Well waterline located within the South Chimineas Unit of the Carrizo Plain Ecological Reserve in San Luis Obispo, California. The project scope involves abandoning a broken waterline segment currently crossing private property and installing approximately 3,600 feet of new waterline entirely on State lands. This installation will utilize trenching, jacking, and boring methods, specifically requiring a bore beneath State Route 166 and the excavation of bore pits along an existing dirt road. The new line will connect to existing infrastructure that supplies wildlife troughs, a wildlife pond, and a water cistern. The project is classified under NAICS code 237110 and is categorically exempt from the California Environmental Quality Act under California Code of Regulations, title 14, Section 15304, as it is considered a minor alteration to improve habitat conditions. Administrative oversight is provided by Regional Manager Julie A. Vance, with Unit Biologist Brandon Swanson serving as the primary point of contact. As this is currently a forecast notice, specific contract values, performance schedules, and formal evaluation criteria have not yet been established.

General Info

Repair and reroute 3,600 feet of waterline on state land, bypassing private property, using trenching and boring to serve wildlife habitats.

Agency

California → Fish and Wildlife, Region 4 - Central, Fresno

Place of Performance

San Luis Obispo, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 4 - Central, Fresno
Contacts1 person available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 4 - Central, Fresno
Office AddressN/A
Contacts
Brandon SwansonUnit Biologist

Full Description

Show more
The California Department of Fish and Wildlife plans to reroute a broken waterline that runs from State land through private property. The segment of the waterline located on private land will be abandoned in place. Approximately 3,600 feet of new water line will be installed. The new alignment will be constructed entirely on State lands. Installation will occur through trenching and/or jacking and boring. The project will require boring beneath State Route 166 and excavating bore pits along an existing dirt road. The new waterlines will connect to existing infrastructure that supplies a water cistern, wildlife pond, and wildlife troughs.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open cut installation of PVC piping ranging from 6 to 30 inches and Ductile Iron Pipe (DIP) in 18 and 24-inch diameters. Key deliverables include the construction of standard manholes up to 72 inches, doghouse manholes up to 84 inches, and 24-inch DIP sewer trenchless crossings with associated launch and receiving shafts. Additional requirements encompass a CSO regulator fit out, outfall work, and the abandonment of existing pipes and manholes. Supporting site activities include the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP), clearing and grubbing of 5,130 square yards of wooded areas, and subsequent seeding and fine grading. The project also requires geotechnical instrumentation and monitoring, maintenance of flows and bypass, and specific railroad insurance. Point of contact for this opportunity is John Connelly at [email hidden].
Cleary Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 26 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer and manholes. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on socioeconomic compliance through required Minority and Women-Owned Business Enterprise documentation. Bidders must provide a Good Faith Efforts Form and Table A to be considered responsive. The project is governed by EJCDC standard general and supplementary conditions, requiring both performance and payment bonds from sureties with an A.M. Best rating of A-VII or better. Performance begins upon a written Notice to Proceed, and payment is processed monthly via applications for payment submitted to the Engineer, with payments becoming due 30 days after presentation to the owner. Final acceptance is contingent upon the Engineer's determination of substantial completion and the resolution of a final punch list.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 2 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS