Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

CVWD Replenishment Facilities Curtailment Program

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Coachella Valley Water District (CVWD) Replenishment Facilities Curtailment Program is a temporary two-year agreement with the U.S. Bureau of Reclamation, acting through the Department of the Interior, to conserve Colorado River water during calendar years 2027 and 2028. This program is an extension of the 2022 Thomas E. Levy Facility program and aims to conserve up to 35,000 acre-feet per year, totaling up to 70,000 acre-feet over the term. Conservation is achieved by limiting groundwater replenishment at the Thomas E. Levy, Whitewater River, Mission Creek, and Palm Desert facilities. The program is designed to assist in managing reservoir elevations at Lake Powell and Lake Mead in accordance with the 2007 Interim Guidelines for Lower Basin Shortages and Coordinated Operations. The agreement provides for a fixed payment of $325 per acre-foot of conserved water, with a total estimated contract value of up to $22,750,000. Performance is centered in the Coachella Valley of Eastern Riverside County, California. The program is exempt from the California Environmental Quality Act (CEQA) under various statutory and common sense exemptions, as it utilizes existing irrigation distribution and drainage systems without expanding infrastructure. Key administrative contacts include Assistant General Manager Robert Cheng and Environmental Resources Analyst Carlos Huerta.

General Info

CVWD to conserve 70,000 acre-feet of Colorado River water in 2027–2028 via reduced recharge at four sites for $325 per acre-foot.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Coachella Valley Water District
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Carlos HuertaEnvironmental Resources Analyst
Robert ChengAssistant General Manager

Full Description

Show more
The Coachella Valley Water District (CVWD) Replenishment Facilities Curtailment Program consists of CVWD entering an agreement with the U.S. Bureau of Reclamation (Reclamation), acting through the Department of Interior (DOI), for conservation of Colorado River water through replenishment curtailment in calendar years (CYs) 2027 and 2028; conserve water of up to 35,000 acre-ft/year (af/yr) at a fixed price of $325/af. This program is temporary and an extension of the Thomas E. Levy (Levy) Facility replenishment curtailment program established in 2022. The temporary and compensated Colorado River water conservation proposals cover the two calendar years of 2027 and 2028. CVWD operates the Thomas E. Levy Groundwater Replenishment Facility, Whitewater River Groundwater Replenishment Facility, Mission Creek Groundwater Replenishment Facility, and Palm Desert Groundwater Replenishment Facility, which are key to groundwater management in the Coachella Valley. The Levy Facility benefits the East Whitewater River Subbasin Area of Benefit (East AOB) and has averaged annual recharge of over 37 taf in recent years. Although delivering water to the recharge facilities is important for CVWD’s groundwater management, it was decided that temporarily suspending delivery to the Levy Facility would allow CVWD to achieve the goal of contributing materially to the River with minimal impacts to the region. Under the Agreement, CVWD will achieve the up to 35,000 af/yr of conservation by limiting the maximum groundwater replenishment at the CVWD replenishment facilities in the Coachella Valley while enrolled in the Lower Colorado Conservation program. The Replenishment Facilities Curtailment Program shall conserve a total of up to 70,000 af of Colorado River water for the two-year term of the agreement. This program will not result in expansion of use of CVWD’s existing irrigation distribution system or its irrigation drainage system. Accordingly, the proposed program involves operation and implementation of CVWD’s existing irrigation distribution facilities and irrigation drainage for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead. The proposed action of using conserved water from the proposed Conservation Program to assist in managing reservoir elevations is within the scope of analysis of actions that were previously analyzed in that EIS and in the SEIS currently underway. Thus, to the extent the proposed actions involve or may affect areas outside of California, such as at Lake Mead or on the portions of the Colorado River in Nevada or Arizona, they are exempt from CEQA under a Statutory Exemption State CEQA Guidelines Section 15277. The proposed action of adopting and extending the Coachella Valley Water District Replenishment Facilities Curtailment Program for 2027 and 2028 is exempt under the provisions of State CEQA Guidelines.

Similar Contracts

Same NAICS industry code

More opportunities from California → Coachella Valley Water District

Same awarding agency

NAICS: 237110
SLED
Well Rehabilitation Project FY27, Wells No. 5711-2 And 5727-1
Solicitation # 2026-44
The Coachella Valley Water District is soliciting bids for the Well Rehabilitation Project FY27, focusing on the rehabilitation of Wells No. 5711-2 and 5727-1 in Palm Desert, California. The scope of work includes the removal and inspection of permanent pumps and motors from estimated depths of 340 to 345 feet, mechanical and chemical cleaning, well redevelopment, disinfection, and the installation of new permanent pumps. Additionally, the contractor must perform EMT casing thickness, caliper, and deviation surveys, as well as discrete zone sampling and aquifer testing. All work must be completed within 240 calendar days from the Notice to Proceed. To be considered responsive, bidders must demonstrate significant experience, including the completion of at least four similar projects valued at 300,000 dollars or more within the last five years, and must self-perform at least 30 percent of the work. Required certifications include a valid California contractor's license, CARB fleet compliance, and registration with the Department of Industrial Relations. The successful bidder must provide performance and payment bonds equal to 100 percent of the contract price and All-Risk Installation Floater Insurance. Bids must be submitted electronically via Planet Bids by November 18, 2026, with pricing entered through the platform's line items tab and bid forms uploaded as a single PDF.
Water and Sewer Line and Related Structures Construction

POSTED

16 days ago

DEADLINE

in 11 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS