CY10 A10Y109 (C4I080) KORCOM Operations Center (Building Phase/US), USAG Humphreys, Korea

Closed
W912UM-16-R-0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 10 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 10 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 10 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 10 hours ago

DEADLINE

in 10 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC is soliciting bids for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes saw cutting reinforced concrete walls, installing a commercial-grade exterior door assembly with panic hardware, and excavating a permanent ADA-accessible egress path with required drainage, retaining walls, and handrails. The contractor must ensure all work is code-compliant, coordinate inspections with the Authority Having Jurisdiction, and restore all affected surfaces to match existing clubhouse architecture. This is a price-based invitation for bids where the award will be granted to the lowest responsive and qualified bidder, subject to budgetary limits and Indian preference requirements. Preference is tiered from 100% Colville Business Enterprises down to non-certified Indian-owned businesses, with allowable price differentials based on the total bid amount. Bidders must submit a firm fixed price bid, a performance schedule, a subcontracting plan, and evidence of financial stability, insurance, and licensing by November 20, 2026. The project is expected to be completed by March 31, 2026, though this date is weather-dependent. Final contract terms and payment conditions will be negotiated upon the selection of the successful bidder.
Confederated Tribes of the Colville Reservation

POSTED

about 11 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
SLED
ADA Improvements for Patterson Park and MPD
Solicitation # 1914.02
The City of Murfreesboro is soliciting sealed bids for solicitation number 1914.02, which entails construction upgrades for the Police Headquarters Vestibule and ADA improvements for the Patterson Park Recreation Center Entry. The project is based on AIA Documents A101 and A201 (2017) and requires the contractor to provide high-grade workmanship, including cutting, patching, and the restoration of disturbed structures. Bidders must be licensed General Contractors in the State of Tennessee and registered through the OpenGov procurement portal. The contract will be awarded to the lowest responsive and responsible bidder based on the sum of the base bid and any accepted alternates, with evaluation criteria focusing on experience, financial ability, reputation, and past work history with the owner. Submission requirements include a lump sum base bid, a 5% contingency allowance, and a bid security equal to 5% of the bid, which must be uploaded electronically and delivered physically to the Purchasing Department. The successful contractor must provide performance and payment bonds totaling 100% of the contract sum. Key deliverables include a construction schedule submitted within 21 days of award, various certificates of occupancy and inspection, and specific documentation such as AIA Forms G706, G706A, and G707. The contractor is responsible for quality control and must adhere to strict packaging and marking standards for hardware and wiring, as well as specific waste management and labeling protocols. Payment is processed via Applications for Payment, which must be accompanied by an updated Construction CPM Schedule and a schedule of values.
Facilities

POSTED

about 11 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers Far East District is seeking information from qualified U.S. construction prime contract firms for the KORCOM Operations Facility C4I080 at USAG Humphreys, Korea. This project involves the interior construction of a 170,000 square foot secure work area within a reinforced, below-grade facility. The scope includes administrative offices, data centers, and specialized systems for power and CBR filtration, all adhering to ICD 705 DoD Standards and Antiterrorism/Force Protection Requirements. The estimated project magnitude is between 25 million and 100 million dollars, with a performance period of 730 calendar days from the notice to proceed. The contract will be a firm-fixed price award based on the lowest price technically acceptable source selection. Eligible prime contractors must be U.S. firms with a Facility Clearance Level and safeguarding capability granted by the Defense Security Service, and they must be capable of performing at least 12 percent of the work with their own employees. Strict security protocols will be enforced, including restricted access for finish work to U.S. cleared workers and government inspection of all locally procured materials. Interested firms must be registered in the CCR and provide detailed evidence of their bonding capacity and experience with projects of similar complexity.

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

U.S. Army Corps of Engineers, Far East District ATTN: CEPOF-CTC Unit #15546 APO AP 96205-5546 Project Site: USAG-Humphreys,, AP, KOR

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Sources Sought

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SN Endist Far East
Contacts2 people available
OfficeAPO, AP, 96271-0000, USA
Office AddressAPO, AP, 96271-0000, USA
Contacts
Ronald LimContracting Officer
Tong-Hui YiContract Specialist

Full Description

Show more
I. Synopsis: a. This is a Sources Sought Synopsis announcement for information only, to be used for preliminary planning purposes. No proposals are being requested or accepted with this synopsis. This is not a solicitation or a request for proposal (RFP) and no contract shall be awarded from this synopsis. The U.S. Army Corps of Engineers Far East District (FED) anticipates the issuance of a Request for Proposal and the award of a firm-fixed price construction contract for the KORCOM Operations Facility "C4I080" at USAG Humphreys, Korea. No reimbursement will be made for any costs associated with providing information in response to this synopsis or any follow up information requests. b. The purpose of this synopsis is to gain knowledge of interest, capabilities and qualifications of interested U.S. construction prime contract firms who have the demonstrated capabilities and bonding to complete and perform a contract of this complexity, and to address any questions, recommendations, or concerns from Industry. c. Description of Project: This project is primarily interior construction of a 170,000 Square Foot secure work area within the larger two-story, below grade heavily reinforced KORCOM Operations Center. This facility contains administrative offices, operation centers, data centers, electrical switchgears, uninterruptable power systems, Chemical, Biological, Radiation filtration systems all with redundant capability. Construction shall comply with ICD 705 DoD Standards for Overseas construction. Building envelope is heavily reinforced concrete and includes freight and passenger elevators, multiple blast doors and compartmentalization. Facility, shall comply with DoD Antiterrorism/Force Protection Requirements and other threat mitigation measures. d. Security Requirements: The following special procedures must be followed during construction, in accordance with ICD 705 and associated ICD 705 Technical Specifications standards. (1) Clearance Requirements for Construction: Prime contractor Firm shall be a US Prime (Required) to manage and construct the facility with a Facility Clearance Level (FCL) and Safeguarding capability granted by the Defense Security Service (DSS). Local National labor (Restrictions apply) may be utilized to build and perform general construction. Only U.S. Cleared worker are authorized to complete finish work. (2) Access Control Requirements: A project site pass system and security monitoring shall be implemented by FED and required for all construction personnel, deliveries and visitors. The construction site access control process is required, and will include an effective screening and searching procedures for the ingress and egress of the construction area. Signage will be displayed prohibiting items that cannot enter the construction area. Barriers shall be erected to deny unauthorized access to the construction area. (3). Control of Material: All material procured locally for construction will be subject to inspection by government personnel. After material is procured and inspection is completed the material must be stored in the government controlled secured storage area. e. Magnitude of Project: The magnitude for this project is between $25,000,000 and $100,000,000. The construction contract is subject to specific limitation and availability of funds. f. Performance Period: Duration of construction is 730 calendar days from Notice to Proceed or Award date. II. REQUIREMENT: a. Negotiated procedures resulting in a firm fixed price contract. b. In accordance with Federal Acquisition Regulation (FAR) guidance, the prime contractor must have the capability to perform at least 12% of the contract work with his/her own employees. c. Award will be based on lowest price technically acceptable source selection procedures. d. Anticipated solicitation issuance date is 22 February 2016. Proposal due date will be determined later. e. Offerors response to this Synopsis shall be limited to 50 pages and shall include the following information: (Clarifications and or questions shall be submitted in a separate word document and will not count towards the 50 page limitation) - Offerors name, addresses, point of contact, phone number, and e-mail address. Offerors interest in bidding on the solicitation when it is issued. - Offerors capability to meet project requirements. - Offerors capability to perform a contract of this magnitude and complexity (include offerors in-house capability to execute construction, comparable work performed within the past ten (10) years brief description of the project, customer name, timeliness of performance, customer satisfaction, and dollar value of the project) provide at least 3 examples. - Offerors Bonding Capability (construction bonding level per contract expressed in dollars). - Offerors Joint Venture information, if applicable, existing and potential. Interested Offerors shall respond to this Sources Sought/Market Survey Synopsis no later than 10:00 hrs (KST) 4 November 2015, Korea Standard Time. All interested contractors must be registered in CCR to be eligible for award of Government contracts. Email responses to: Mr. Ronald Lim, Contracting Officer, CEPOF-CTC, Far East District, Email address: ronald.lim@usace.army.mil. Email is the preferred method when receiving responses to this synopsis.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS