Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

D Street Reconstruction and Utility Design Services

Active
20260720021State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Petaluma is soliciting professional design services for the comprehensive reconstruction of D Street from Petaluma Blvd S to the city limits, focusing on the creation of bid-ready construction documents that incorporate Complete Street and Green Street principles. The scope encompasses integrating traffic calming measures, ADA accessibility enhancements, green infrastructure, and the replacement and upgrade of aging utilities including water mains, sewer mains, and stormwater systems. The selected consultant will manage the project through all design phases—30%, 60%, 90%, and final—conducting essential site investigations such as surveying and geotechnical analysis, and will provide up to eighty hours of support during bidding and construction for review of submittals and response to RFIs. Deliverables include detailed construction drawings in AutoCAD and PDF, technical specifications in CSI format, cost estimates, environmental permits, tree protection plans, and as-built documentation if required, all aligned with CALTRANS, NPDES, BASMAA, ADA, and California environmental regulations. The work must comply with the City’s General Conditions and adhere to prevailing wage and living wage requirements as certified through mandatory attachments. The solicitation, numbered 20260720021, is open for responses until August 28, 2026, with proposals required to be submitted electronically via email to the Principal Civil Engineer at the City’s Public Works Department. The technical proposal is limited to forty single-sided pages, excluding cover materials and resumes, with a separate fee proposal to be submitted as a distinct file. Evaluations will be based equally on the offeror’s responsiveness to the scope and proposed approach and their demonstrated experience delivering similar services to public agencies, with selection determined on a trade-off basis rather than lowest price. Contractors must hold an A.M. Best rating of A:VII or better, provide primary and non-contributory insurance with waiver of subrogation, indemnify the City against negligence or misconduct under California law, and avoid any organizational conflicts of interest as defined by state statute. All permits, licenses, equipment, and facilities are the contractor’s responsibility, and the City retains unfettered inspection rights throughout performance. Submission must comply with strict format rules, and any violation of prevailing wage, living wage, or disclosure obligations regarding past violations may result in disqualification or contract termination.

General Info

Design services for D Street reconstruction with utility upgrades, ADA access, and green infrastructure in Petaluma.

Agency

California → City of Petaluma – Public Works DepartmentView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Petaluma, CA, 94952, USA

Set-Aside

NONE

Documents

(3)

RFP D Street Reconstruction and Utility Design Services City of Petaluma

PDFrfp

Addendum 1 to RFP for D Street Restoration and Utility Upgrades Design

PDFamendment

City of Petaluma D Street Bike Lane Alternative Project 4748946003 - 95% Bid Documents

PDFspecifications

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Petaluma – Public Works Department
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Petaluma – Public Works Department
View Agency Profile
Office AddressN/A
Contacts
Hannah LeePrincipal Civil Engineer

Full Description

Show more
This project is for professional design services to create bid-ready construction documents for the reconstruction of D Street from Petaluma Blvd S to the City Limits. The scope includes integrating 'Complete Street' and 'Green Street' concepts, such as traffic calming, ADA accessibility upgrades, and green infrastructure. A major component is the design for the replacement and upgrade of aging utilities, including water mains, sewer mains, and stormwater systems. The selected consultant will manage the project through all design phases (30%, 60%, 90%, and final), conduct necessary site investigations like surveying and geotechnical analysis, and provide support during the subsequent bidding and construction phases.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals for the Corydon Well Replacement Project (C2305) on behalf of the Elsinore Valley Municipal Water District in California. This professional services agreement seeks qualified firms, specifically targeting Disadvantaged Business Enterprises (DBE), to provide comprehensive design, bidding support, and engineering services during construction. The scope is divided into two phases: Phase 1 focuses on civil site design, technical specifications, and construction management for the drilling of a new well and the abandonment of the existing one; Phase 2 covers architectural, mechanical, electrical, and instrumentation design, as well as the equipping, testing, and commissioning of the groundwater production well. Technical requirements specify the use of 24-inch diameter stainless steel Ful-Flo louvered well screens and compliance with AWWA potable water standards, Riverside County, and California State Water Resources Control Board regulations. The solicitation is open to various small business set-asides, including SDB, WOSB, and VOSB. Proposals must be submitted by September 1, 2026, and must include a cover letter, a detailed project approach, staff qualifications, a five-year representative project list, and three professional references. Award selection is based on the most advantageous proposal, considering both price and other factors. Selected consultants must maintain active SAM registration, provide a 100 percent performance and payment bond, and adhere to California prevailing wage laws. Payment is processed via monthly itemized statements with a 45-day review period, though federal award reimbursements must be made within 30 calendar days. The contract also mandates strict adherence to Cal/OSHA safety standards and requires a dedicated Project Manager to coordinate all communications with the District.
Ardurra Group, Inc.

POSTED

about 6 hours ago

DEADLINE

in 16 days
View Details