Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Ohio was posted on July 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

D03-Large Asphalt Cabinet Oven for Test Lab

Closed
SRC0000040819State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333994
New
Federal
Deep Pit Furnace
Solicitation # W519TC-27-Q-A019
The Army Contracting Command - Rock Island is soliciting a single Firm Fixed Price purchase order for one Deep Pit Furnace under solicitation W519TC27QA019. This procurement is a total Small Business Set-Aside under NAICS code 333994. The required furnace must feature an operating range of 1500-1850 degrees Fahrenheit, a load capacity of up to 10,000 pounds, and temperature uniformity of plus or minus 25 degrees Fahrenheit or better. The equipment must comply with ASTM E230 and NFPA 86 standards, and the manufacturer must provide evidence of having supplied or offered this type of equipment for at least three years. Delivery is required by June 1, 2027, on an FOB Destination basis to Rock Island, Illinois. Award will be based on the Lowest Price Technically Acceptable procedure. To be deemed technically acceptable, offerors must provide a compliance statement marking every paragraph of the purchase description as COMPLY or NON-COMPLY and provide a valid firm fixed price. Final acceptance is contingent upon successful on-site testing per AMS 2750, including a Temperature Uniformity Survey and a System Accuracy Test, with signed formal reports required for final payment. The contractor is responsible for site preparation, equipment preservation, and IUID marking per MIL-STD-130. All payments will be processed electronically via Wide Area WorkFlow. A site visit is scheduled for November 10, 2026, and quotes are due by November 17, 2026.
W6QK Acc-Ri

POSTED

1 day ago

DEADLINE

in 20 days
NAICS: 333994
New
Federal
New Heat Treat Equipment
Solicitation # FA9101NHT
The Air Force Test Center’s Installation Contracting Division is conducting market research through a Sources Sought Notice to identify capable small and large businesses for the turnkey procurement, delivery, installation, and commissioning of a new Surface Combustion Allcase Batch Integral Quench Furnace Line. Located at Holloman Air Force Base in Building 1185, the project includes the installation of a Uni-DRAW Temper Furnace and a Spray/Dunk Wash Unit. The selected contractor will be responsible for all specialized engineering, rigging, and labor, ensuring the system is fully operational and compliant with NFPA 86, AMS 2750, OSHA 29 CFR 1910, and NEC/NFPA 70 standards. The performance timeline involves a 4 to 6 week kickoff and drawing phase, followed by a manufacturing lead time of approximately 52 to 78 weeks. On-site installation is expected to take 4 to 6 weeks, with an additional 2 to 3 weeks for commissioning and handover. Formal acceptance requires a successful three-cycle production demonstration and the sign-off of an Engineering Release Form. Additionally, the contractor must provide a two-year extended warranty and comprehensive on-site training for operators and maintenance personnel. Interested respondents must submit their company information, UEI number, technical solutions, budgetary estimates, and delivery timelines by November 2, 2026.
FA9101 Aedc Pkp Procrmnt Branch

POSTED

2 days ago

DEADLINE

in 5 days
NAICS: 333994
DIBBS
AUTO-CLAVE UPGRADE
Solicitation # SPE4A8-27-Q-0003
Solicitation SPE4A8-27-Q-0003 is a request for a firm-fixed-price contract issued by the Defense Logistics Agency Weapons Support for the upgrade of a medium Thermal Equipment Corporation composite autoclave system located at the Fleet Readiness Center East in MCAS Cherry Point, North Carolina. The scope of work involves furnishing, installing, and integrating various components, including the replacement of vacuum receivers and control valves, the installation of a Windows 11 HMI computer with specific PLC/HMI development software, and the replacement of the scissor-lift bridge hoist system and related locking mechanisms. The contractor is also required to provide a self-contained Hydraulic Power Unit and all necessary technical data. The contract specifies a performance period of 365 days after receipt of order, with delivery and acceptance occurring at the destination. Key requirements include compliance with MIL-STD-130N for Item Unique Identification tagging, ASTM D3951 for packaging, and strict adherence to OSHA and EM 385-1-1 safety standards. This acquisition is set aside for Small Business, HUBZone Small Business, and Service-Disabled Veteran-Owned Small Business concerns. Award will be based on a best-value evaluation considering technical acceptability, past performance from the last five years, and price reasonableness. Offerors must submit detailed technical compliance statements and pricing via DIBBS, email, or mail.
Defense Logistics Agency

POSTED

14 days ago

DEADLINE

in 19 days

AI Contract Overview

Show more

Solicitation SRC0000040819 is a request for the procurement of one new electric large cabinet shelf oven for a test lab in Ohio, managed by the Capital Program Administration Dotd3. The required equipment must be a 480V, 3-phase, 60 Hz unit with a maximum operating temperature of 400 degrees Fahrenheit and a minimum capacity of 46 cubic feet. Key performance specifications include the ability to maintain a constant temperature of 230 degrees Fahrenheit plus or minus 9 degrees for 24 hours, a rise time of 35 minutes, and temperature uniformity of plus or minus 4 degrees Fahrenheit. The oven must feature forced convection airflow, a programmable 24-hour timer, and specific safety interlocks to prevent overheating or operation during blower failure. The unit must be UL Listed and comply with NFPA 86, NFPA 70, Factory Mutual, and OSHA standards. The total procurement includes the oven, a total of five shelves (two included and three additional), a programmable timer, and all shipping and delivery costs to the Ohio facility by October 30, 2026. Bidders are required to list all applicable part numbers and specifications for each item separately on a single bid. This is a Lowest Price Technically Acceptable procurement, where the award will be granted to the lowest bidder who meets all technical specifications. Additionally, the successful contractor must affirm that all services and data remain within the United States, as offshore performance or data storage without a waiver is grounds for contract termination.

General Info

Procurement of one electric large cabinet shelf oven for an Ohio test lab.

Documents

2

Office of Contracts IT Finance Purchasing Standard Terms and Conditions 5.26.2026

PDF, High priority: read this first23 pages · standard-terms-and-conditions
High

Affirmation and Disclosure Form 5-24

PDF, Low priority2 pages · affirmation-and-disclosure-form
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOhio → Dot034500 Capital Program Administration Dotd3
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The bid must clearly list all applicable parts, model/part numbers, and all applicable specifications for each item that the bidding company plans to provide. This bid will be for (1) Lab Oven, (5) shelves (2 included with oven, purchase 3 extra), timers, shipping, and delivery. Please bid each of these lines separately, but all on the same bid.Product SpecificationsPurchase of one (1) new Electric Large Cabinet Shelf Oven480V, 3 Phase, 60 HzMaximum Operating Temp - 400°FAir Flow – Forced Convection, Side to SideControl Accuracy ±0.3%Oven Uniformity ±4°F ABILITY TO MAINTAIN A CONSTANT TEMPERATURE OF 230 DEGREES F +/- 9 DEGREES FOR 24 HOURS Rise Time –35 minsOVEN BLOWERS MUST HAVE THE CAPABILITY TO RUN WITHOUT HEATPROGRAMMABLE TIMER 24 HOUR, 7 DAY (START, STOP) CAN BE SET IN HOURS AND MINUTES Workspace Dimensions - 50"W x 30"D x 54"HOutside Dimensions - 70"W x 46"D x 80"H The oven needs a minimum capacity of 46 cubic feet, and the exterior can be no bigger than 50 inches in depth and 75 inches in width. Total Shelves – 5 (2 included with oven, purchase 3 extra)Number of Shelf Ledges for movement - 8Shelf Capacity - 100#Max Load Capacity - 400#Doors - ManualLoading Method - Shelf24 Hour Timer – Start and Stop Programable TimerHigh/Low ControlProgramable Temperature ControlAutomatic Door SwitchSAFETY EQUIPMENTAdjustable manual reset excess temperature interlock to turn off heat on malfunction of main temperature controllerRecirculating blower air flow safety switch to turn off heat on loss of recirculated air flowElectrical interlock shuts off heat if power to recirculating blower is interruptedSeparate heating element control contactors to turn off heat on malfunction of main control contactorsOven Must Meet the Following Certifications UL Listed Control Panel Meets the Requirements of the Following Standards: NFPA 86 (Standard for Ovens and Furnaces) NFPA 70 (National Electric Code) FM (Factory Mutual) OSHA
Lowest bidder meeting all Spec's will be awarded the bid.
Core drying ovens
Items I1_000001 | Required Item | Large Asphalt Cabinet Oven | Please see "Large Ovens CO Requirments" document that is attached for exact specifications needed. | Estimated usage: 1.00000 | Unit: Each | Requested delivery: 10/30/2026 I1_000002 | Required Item | Additional Shelves | Oven comes with 2 shelves, we would like 3 extra, so 5 total. please refrence attachment for specifications. | Estimated usage: 3.00000 | Unit: Each | Requested delivery: 10/30/2026 I1_000003 | Required Item | 24 Hour Timer – Start and Stop Programable Timer | 24 Hour Timer – Start and Stop Programable Timer, see attachment for specifications. | Estimated usage: 1.00000 | Unit: Each | Requested delivery: 10/30/2026 I1_000004 | Required Item | Shipping / Delivery | Deliver/Shipping of Items to the Facility. See attachment for specifications. | Estimated usage: 1.00000 | Unit: Each | Requested delivery: 10/30/2026

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS