Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Rhode Island was posted on April 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Dam Repairs to Gorham N. Pond

Closed
Foster RFP002FY25State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
SLED
DHR Walker Co - FY27 Lawn Service
Solicitation # SRC0000037237
Solicitation SRC0000037237 is a firm and fixed price request for quote for comprehensive lawn services at the Walker County DHR facility located at 1901 Highway 78 East, Jasper, Alabama. The period of performance is from October 1, 2026, through September 30, 2027, with the possibility of annual renewals for up to five years, provided the total contract cost does not exceed 25,000 dollars. The scope of work includes grass cutting, limited to 20 cuts per fiscal year, and shrub or hedge trimming twice per year in the spring and fall. Services include weed eating, edging, and debris removal, though the spraying of beds and replacement of pine straw are explicitly excluded. A mandatory site visit is required on November 2, 2026, from 8:30 AM to 3:30 PM; quotes from vendors who do not attend and sign in will not be accepted. Responses must be submitted electronically via Alabama Buys by November 4, 2026. Payment terms are net 30, paid in arrears after service completion, and vendors must accept electronic payments such as P-cards or EFT. The contract is subject to Alabama state laws, including the Beason-Hammon Alabama Taxpayer and Citizen Protection Act requiring E-Verify documentation and specific tax compliance certifications. The State of Alabama reserves the right to inspect all services before acceptance and may request professional licenses and certificates of insurance following the bid opening.
DHR Walker County Office

POSTED

about 4 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The Foster Land Trust is seeking qualified contractors to undertake dam repair work at Gorham N. Farm Pond, with a focus on waterbody proximity experience. Interested bidders must obtain detailed site packages from Foster Town Hall, review them thoroughly, and schedule site visits by appointment between April 24 and May 27, 2025. All bid submissions, which must include a detailed cost proposal, project timeline, and completion date, are due by noon on July 1, 2025, with bids opening immediately afterward for review and discussion at the July Foster Land Trust meeting. The project scope, derived from an engineering report, involves repairs to the auxiliary spillway, embankment toe, discharge pool, and erosion control measures, with specific technical requirements outlined in attached documentation. Bidders are required to demonstrate recent relevant experience in site clearing and preparation, provide a Bidder’s Qualification Statement, and comply with all applicable federal and Rhode Island laws, including civil rights and non-discrimination policies. The contractor must secure all necessary permits, insurance, and a surety bond prior to commencing work, and is responsible for erosion control and other project-specific permits. The contract emphasizes the importance of proper project monitoring, adherence to specified velocities and construction sequences, and the submission of a comprehensive cost proposal. The project budget is estimated between $500,000 and $1,500,000, with detailed specifications and bid instructions available online through the Rhode Island procurement portal.

General Info

Agency

Rhode Island → Foster-Glocester Regional School District

Place of Performance

RI, USA

Set-Aside

NONE

Documents

1

Foster RFP002FY25 - Bid/RFP Offer Notice

PDF, Low priorityspecial-notice
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyRhode Island → Foster-Glocester Regional School District
ContactsNo contacts available
OfficeN/A
Organization / Agency
Rhode Island → Foster-Glocester Regional School District
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Dam Repair for Gorham N. Farm Pond
The Foster Land Trust (FLT) is requesting proposals from interested contractors with demonstrated experience of working near waterbodies to repair a dam. All bidders will be provided with detailed site packages that must be picked up at the Foster Town Hall at 181 Howard Hill Road, Foster, R.I. Monday – Thursday {0900-1600), titled “Gorham N. Farm Pond Dam.” The site package must be reviewed prior to scheduling your required site visit with a Foster Land Trust representative. Site inspections will be conducted by appointment from Thursday, April 24 through May 27, 2025, between 10 a.m. and 12 p.m.
Point of Contact, for scheduling, questions, and comments: Michael J. Carpenter, Phone: +1 (555) 000-0000, E-Mail: contact@example.gov All questions are due before 12:00 p.m. on June 10, 2025.
Due Dates Sealed bids, clearly marked “Gorham N. Farm Pond” must be dropped off at the Foster Town Hall, 181 Howard Hill Road by 12:00 p.m. on July 1, 2025 All bids must include a time schedule and completion date. Bids will be opened at 12:00 p.m. on July 1, 2025. Discussion and action on bids received scheduled for the Foster Land Trust meeting in July.
Requirements Bidders must have appropriate site clearing and preparation experience and offer evidence of that experience on similar projects in the last three years when they submit their Bidder’s Qualification Statement along with their bid.
The following Bidder’s Qualification Statement shall be added and submitted according to paragraph A.
Company Name: ____________________________________________________
____________________________________________________
The undersigned offers the following information as evidence of its organizational Qualifications to perform the work as bid according to all requirements of the plans and specifications.
There shall be no discrimination against any employee who is engaged in the work proposed, in compliance with Title IV of the Civil Rights Act of 1964 (EEO)
Disclaimer Any assignment or transfer of rights under a contract awarded through an RFQ with Foster Land Trust requires approval from same.
Foster Land Trust reserves the right not to proceed with certain bid terms. All necessary permits and insurance including but not limited to liability and workers compensation policies and erosion control are the sole responsibility of the contractor. The contractor must provide a surety bond prior to start of any work related to this RFQ of not less than the cost of materials plus labor for the completion of all work described herein. The contractor shall be in compliance with federal law and the laws of Rhode island.
Cost Proposal for repairs to Gorham N. Farm Dam per GZA
Company Name: Address: __________________________________________________


RI License Number:
Total Cost for All Work:
Authorized Signature:
Specifications
Scope of Work Extracted from GZA engineering report and attached to this Request for Quote as follows: (page numbers circled upper right corner) (see .pdf)
Page 2 – Permissible velocities for vegetated spillways.
Page 4 – Project Scope of Work/ Sequence: Auxiliary Spillway Channel. Page 5 – Project Scope of Work/ Sequence: Embankment Toe Discharge Pool
Figure 2 – AUXILIARY SPILLWAY CHANEL REPAIRS PROJECT ORIENTATION
Figure 3 – AUXILIARY SPILLWAY CHANNEL REPAIRS WORK EXTENTS
Page 6 – Water Control Notes Erosion Control Notes
Page 7 – Execution Construction Monitoring
Page 8 – Construction Monitoring
Page 14 – IRON STAINED AREAS AT OUTLET (picture)
Attachment A – AUXILIARY SPILLWAY (picture)
Attachment B – STUMP REMOVAL (drawing)
Attachment C – Updated linework
See https://www.townoffoster.com/foster-home-page/bids/gorham-n-farm-pond-dam-repair for specification.pdf

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS