Dane County Regional Airport East Parking Ramp Immediate Repairs

Active
326026State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Dane County Regional Airport East Parking Ramp Immediate Repairs project, solicitation number 326026, focuses on addressing high-priority structural maintenance and safety issues within the East Parking Ramp. The scope of work includes repairing concrete deterioration, delaminations, failed joint sealants, and worn protective systems to prevent further water and salt damage. This immediate phase is part of a larger capital improvement program, with additional levels scheduled for repair between 2027 and 2029. Managed by the Public Works Engineering agency in Wisconsin, the project requires contractors to operate within phased, limited-access areas while maintaining airport operations and protecting the public and parked vehicles. Key operational requirements include managing limited staging space and completing temperature-sensitive coatings within a specific window. Interested bidders must respond by September 1, 2026, and are encouraged to attend a pre-bid meeting to verify site conditions and phasing requirements.

General Info

Immediate structural repairs for Dane County Regional Airport East Parking Ramp, due September 2026.

Agency

Wisconsin → Public Works EngineeringView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

WI, USA

Set-Aside

NONE

Documents

(2)

326026_Final_RFB.pdf

PDF

Dane County Regional Airport East Parking Ramp Immediate Repairs.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyWisconsin → Public Works Engineering
Contacts2 people available
OfficeMadison, WI, 53703, USA
Organization / Agency
Wisconsin → Public Works Engineering
View Agency Profile
Office AddressMadison, WI, 53703, USA
Contacts
Ryan FalchDirector of Planning and Development
Daniel MartinezProject Manager

Interested Companies (27)

Show more
KPH Construction
Milwaukee, WI
Constructconnect
Cincinnati, OH
LaLonde Contractors

See All 27 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Dane County Regional Airport parking facilities include an East Parking Ramp that was originally constructed in 1993, with an additional level completed in 1995. The structure has been evaluated periodically as part of the County's ongoing parking-facility maintenance and capital-improvement program. A recent structural assessment identified localized concrete deterioration, delamination's, failed or deteriorated joint sealants, worn protective systems, isolated structural connection concerns, and other conditions requiring timely repair. The Immediate Repairs Project is intended to address the highest-priority maintenance and safety items identified during those evaluations while reducing continued exposure of the structure to water and deicing salts. This project is part of Dane County's ongoing effort to maintain safe, functional, and durable public infrastructure. The proposed work is intended to reduce the risk of further deterioration, preserve the structural system, and improve waterproofing performance. The remaining levels of the East Parking Ramp will be addressed in future construction project in 2027, 2028, and 2029. Key considerations include maintaining airport and parking operations, working within phased and limited-access areas, coordinating closures and traffic routing, protecting parked vehicles and the public, controlling dust and debris, managing limited staging space, and completing temperature-sensitive repair and coating work within the specified construction window. Bidders are encouraged to attend the pre-bid meeting, carefully review existing site conditions, verify access and staging constraints, and become familiar with the phasing, temporary protection, material-curing, and operational requirements included in the Contract Documents.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Sanitary Sewer & Recycled Water Project in CA
Solicitation # sanitary-sewer-recycled-water-project-ca
The Sanitary Sewer and Recycled Water Project in Colusa, California, is a construction solicitation issued by Garney Pacific, Inc. on behalf of the City of Colusa. The scope of work involves the installation of approximately 13,000 linear feet of new sewer gravity mains, recycled water mains, and sewer force mains, along with the installation of sewer manholes and the execution of pavement grinding and overlay. Key project deliverables include site preparation, grading, joint trenching, traffic control, paving, stripping, vac-truck services, trucking, and CCTV inspection to ensure the functionality and safety of the underground infrastructure. The solicitation, identified by number sanitary-sewer-recycled-water-project-ca and NAICS code 237990, is open for responses until September 1, 2026, at 3:00 PM PT. This opportunity is set aside for various small business categories, including Small Disadvantaged Business, Women-Owned Small Business, HUBZone, and Veteran-Owned Small Business entities, with a strong emphasis on Disadvantaged Business Enterprise participation. Special requirements for subcontractors include the mandatory use of union labor and the provision of 100 percent payment and performance bonds from U.S. Treasury-listed sureties. All bids must be submitted through the Garney Pacific portal, and any proposed modifications to the standard purchase order and subcontract forms must be included with the quote.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Healy Tibbitts Builders, Inc. is seeking small business subcontractors and suppliers for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Hawaii. This firm-fixed-price effort, issued as an Invitation for Bid under solicitation W9128A26BA002, has an estimated value between 1 million and 5 million dollars. The scope of work includes mobilization and demobilization, the dredging and ocean disposal of 4,260 cubic yards of material, and revetted mole repairs involving stone rework and CRM wall repair. The period of performance is 200 calendar days from the notice to proceed, with a response deadline of September 30, 2026. The contract is set aside for various small business categories, including SDB, WOSB, HUBZone, VOSB, and SDVOSB, under NAICS code 237990. Key requirements include adherence to USACE EM 385-1-1 safety standards, Davis-Bacon Act prevailing wages, and specific ASTM standards for stone materials. Awardees must provide a qualified project team, including a Project Manager, Superintendent, Quality Control Manager, and Site Safety and Health Officer. Performance is subject to a three-phase control process and final acceptance by the Contracting Officer. Liquidated damages for construction delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SBWRP Reverse Osmosis System
Solicitation # K-26-2469-DBB-3
Garney Pacific, Inc. is acting as the general contractor for the SBWRP Reverse Osmosis System project, located in San Diego, California, for the City of San Diego. The project has an estimated bid value of 19,300,000.00 dollars and falls under NAICS code 237990. The scope of work involves the design and removal of existing trailer-mounted electrodialysis reversal, slab-mounted membrane filtration, and reverse osmosis units. These will be replaced with new slab-mounted membrane filtration and reverse osmosis units to create a demineralization facility aimed at reducing total dissolved solids in reclaimed water. Garney Pacific is seeking quotes from subcontractors for various trades, including HVAC, plumbing, electrical, concrete, pumping, crane services, aggregate, landscaping, painting, piping insulation, and demolition. The solicitation, identified as sbwrp-reverse-osmosis-system and bid number K-26-2469-DBB-3, has a response deadline of August 27, 2026, by 2:00 PM PT. All subcontractors must utilize union labor and be prepared to provide a 100 percent payment and performance bond from a US Treasury listed surety company, though Garney will reimburse the bond premium. The company is actively seeking participation from small businesses, including those with DBE, MBE, WBE, or SBE certifications, and can provide assistance to SLBE and ELBE firms in obtaining insurance or bonding lines of credit. Contracting will be based on Garney Standard PO and Subcontract Forms, and any exceptions to these forms must be submitted as redline comments with the quote.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 11 days
View Details