Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Pennsylvania was posted on May 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Daniel Miller Stream Restoration

Awarded
Donegal Chapter of Trout Unlimited, Lancaster CountyState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 14 hours ago

DEADLINE

in 15 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualifications from Design Build Entities for the design and construction of eight new pickleball courts with lighting at Garden Grove Park. This project, estimated to cost between 1,000,000 and 1,200,000 dollars, includes all labor, materials, engineering, and construction services, including site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to California Public Contract Code Section 20164 and Garden Grove Municipal Code. While the contractor is responsible for most testing and inspections, the City will retain a third-party consultant specifically for soil compaction testing. The procurement follows a two-step process where the City will first shortlist the three highest-scoring firms based on experience, technical capabilities, safety records, and financial capacity. These shortlisted firms will then be invited to submit a proposal for final selection based on best value. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a Certification Form, a Firm Information Form, and a Surety Declaration Form confirming the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 15 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

This contract pertains to the restoration and stabilization of 2,090 feet of streambank along the Daniel Miller Stream at 376 Goat Hill Road in Peach Bottom, Pennsylvania, within Fulton Township, Lancaster County. The work will employ a multi-Best Management Practice (BMP) approach guided by the Pennsylvania Fish and Boat Commission’s “Habitat Improvements for Trout Streams” guidelines, focusing on natural channel design to achieve long-term stabilization and reduce sediment transport. The project requires full implementation of all materials, equipment, supplies, and labor as specified in the approved drawings and Statement of Work (Attachment A), with additional emphasis on enhancing and managing the existing riparian buffer in the floodplain and adjacent wetlands to support ecological resilience. Performance must comply with USDA NRCS Standard 590, Pennsylvania state labor laws, and federal environmental regulations including the Clean Water Act, with all deliverables subject to inspection and formal acceptance by the U.S. Army Corps of Engineers and Pennsylvania Department of Environmental Protection upon submission of certified as-built drawings and mitigation documentation. The contract is solicited by the Donegal Chapter of Trout Unlimited under Lancaster County jurisdiction, with submissions due by June 12, 2026, via the PennBid portal. While not a federal contract and thus not governed by FAR clauses, it incorporates federal compliance obligations including SAM.gov registration with a Unique Entity Identifier (UEI), adherence to FFATA reporting thresholds, and certification under the Build America, Buy America Act for materials. Contractors must follow ACH-based payment procedures through the Pennsylvania Budget Office, submit quarterly progress and MBE/WBE participation reports, and ensure compliance with federal audit standards under 2 CFR Part 200. No contract value is listed, and pricing details remain uncompleted, indicating the document is in solicitation phase. Key administrative requirements include submission of final reports within 30 days of project completion, use of EPA/DEP logos on deliverables, and immediate notification of any debarment, tax delinquency, or conflict-of-interest changes. The place of performance is fixed at the specified Lancaster County location, and no FOB terms, packaging standards, or designated COR/COTR are provided, pointing to a state-level grant or partnership agreement rather than a standard federal procurement.

General Info

Restore and stabilize 2,090 feet of Daniel Miller Stream with BMPs and riparian buffer enhancement.

Contract Value

$0

Place of Performance

Lancaster County, PA, USA

Set-Aside

NONE

Award Issued Date

Documents

19

Commonwealth Standard Terms and Conditions Grant Version 10-1-2023

PDF, High priority: read this firstcontract-document
High

Conowingo Creek Samuel E Lapp Stream Plans

PDF, High priority: read this firstspecifications
High

Daniel Miller Stream Restoration Advertisement for Bids

DOCX, High priority: read this firstadvertisement-for-bids
High

Daniel Miller Stream Restoration Bid Instructions

PDF, High priority: read this firstbid-instructions
High

Daniel Miller Stream Restoration Bid Schedule and Response Form

DOCX, High priority: read this firstbid-schedule
High

Daniel Miller Stream Restoration General Instructions

DOCX, High priority: read this firstgeneral-instructions
High

Mandatory Site Visit Notice for Daniel Miller Project Sealed Bid

PDF, High priority: read this firstspecial-notice
High

Mandatory Site Visit Notice for Daniel Miller Stream Project Sealed Bid

PDF, High priority: read this firstspecial-notice
High

S. Lapp & A. Beiler Stream Restoration Bid Schedule and Response Form

DOCX, High priority: read this firstbid-schedule
High

S. Lapp & A. Beiler Streams General Instructions

DOCX, High priority: read this firstifb
High

S. Lapp and A. Beiler Stream Restoration Bid Instructions

DOCX, High priority: read this firstifb
High

319 NPS Management Grant Final Report Guidelines

PDF, Low priorityother
Low

Conowingo Creek Daniel Miller Stream Plans 2026-02-09

PDF, Low priorityother
Low

EA3603225-002 Environmental Assessment Approval - Conowingco Creek Restoration

PDF, Low priorityaward
Low

Environmental Assessment Approval Daniel Miller Farm Conowingo Creek Restoration

PDF, Low priorityenvironmental-assessment-approval
Low

General Permit Acknowledgment - Conowingo Creek Restoration (Amos Beiler Site #1)

PDF, Low priorityaward
Low

NAB-2022-00231 PASPGP-6 Authorization for Daniel Miller Farm Conowingo Creek Restoration

PDF, Low priorityauthorization
Low

NAB-2025-00165 Conowingo Creek Restoration Authorization

PDF, Low priorityaward
Low

Conowingo Creek Amos Beiler Site 1 Stream Plans 2025-06-24.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseAwarded
Posted

Solicitation

Notice updated

Response deadline changed from Jun 12, 2026 to Nov 9, 2026. The notice title changed. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Lancaster County
ContactsNo contacts available
OfficeLancaster County, PA, USA
Office AddressLancaster County, PA, USA
ContactsNo contact information available

Interested Companies (86)

Cutting Edge Tree Professionals
A.T.O. Excavating
Schuylkill Tree and Landscaping

See All 86 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
This contract includes, but is not limited to, furnishing all materials, equipment, supplies, and labor to implement 2,090 feet of streambank stabilization on the Daniel Miller Stream per the supplied drawings. The restoration/stabilization will utilize a multiple Best Management Practice (BMP) approach, applying natural channel design for the understanding of restoration risk management, and the selection of Best Management Practices as described and presented by the Pennsylvania Fish and Boat Commission’s (PFBC) “Habitat Improvements for Trout Streams”, to achieve the long-term stabilization and sediment reductions. Enhancement and management of the existing riparian buffer in floodplain and adjacent wetlands are to be included to complement the restoration efforts at 376 Goat Hill Road, Peach Bottom, Pennsylvania 17563 in Fulton Township, located in Lancaster County, Pennsylvania

More opportunities from Pennsylvania → Lancaster County

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS