Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Ohio was posted on August 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

DAS Facility Improvements FY27

Closed
https://dam.assets.ohio.gov/image/upload/ofcc.ohio.gov/Project_Opportunities/RFQs/2026/RFQ-DAS-2600XX-CMR.pdfState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Renovate Inpatient Pharmacy Phase II Loma Linda
Solicitation # W912PL26RA036
The U.S. Army Corps of Engineers, Los Angeles District, is soliciting proposals for a Design Build Multiple Award Task Order Contract to perform a 100 percent complete design and construction renovation of approximately 10,000 square feet at the Loma Linda VA Health Care System Hospital in California. The project scope is divided into three primary areas: a 4,100 square foot inpatient pharmacy requiring sterile and hazardous drug compounding rooms compliant with USP 797, USP 800, and VA PG-18-12 standards; 500 square feet of locker rooms requiring complete demolition and replacement of all finishes and fixtures; and 5,400 square feet of selective corridors involving new acoustical ceilings, LED lighting, and HVAC upgrades. The contractor is responsible for all lead and asbestos abatement, mechanical, electrical, and fire protection modernizations, and the installation of owner-furnished equipment. The contract has an estimated magnitude between 5 million and 10 million dollars with a performance period of 15 months from the notice to proceed. Award will be based on price only, and the acquisition strategy prioritizes service-disabled veteran-owned small businesses. Key administrative details include liquidated damages of 2,025 dollars per calendar day for delays and a requirement for the contractor to appoint a site representative with negotiation authority up to 500,000 dollars. The Department of Veterans Affairs and USACE serve as the sole Authority Having Jurisdiction for all building, fire, and life-safety approvals, meaning local or state agency approvals are not required. All proposals must be submitted in PDF format via the Procurement Integrated Enterprise Environment solicitation module.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in about 10 hours
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a single firm fixed price contract for the comprehensive interior modernization of Building 262 and associated upgrades to Buildings 261 and 263 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring, renovating restrooms with new vanities and lavatories, updating doors and life-safety components, and installing new raised flooring and electrical distribution. Additional requirements involve replacing variable air volume systems, upgrading lighting controls, correcting plumbing deficiencies, and replacing classroom ceiling fans. The project is structured with a base requirement for Building 261 and an option for Building 263, to be performed consecutively, with a total delivery schedule of 425 days after the notice to proceed. The overall period of performance is from January 11, 2027, to March 11, 2028. Award will be based on the best suited negotiate methodology, where price, past performance, and corporate relevant experience are of equal importance. To be eligible, offerors must achieve at least a satisfactory rating for past performance and an acceptable rating for corporate relevant experience. The contractor is required to provide performance and payment bonds totaling 100 percent of the contract price and must adhere to Buy American and ADA compliance standards. Proposals must be submitted electronically to the contracting officer by November 9, 2026, and must include specific documentation such as a signed Standard Form 1442, a detailed bid schedule in Excel, and a construction quality control plan. All payments will be processed via electronic funds transfer in accordance with federal prompt payment regulations.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 17 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, falling under NAICS code 236220. The solicitation was posted on October 22, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is designated as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements is mandatory to secure project financing. Bidders must provide proof of specific efforts to be deemed responsive, including posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, proof of utilizing the Small Business Administration and the Minority Business Development Agency must be included in the bid package. While outreach documentation such as call logs or emails may be submitted up to three business days after the closing date, failure to meet the primary publicity and agency utilization requirements will result in the bid being deemed non-responsive.
RT CONTRACTOR CORP

POSTED

about 1 hour ago

DEADLINE

in 12 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is seeking pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring shallow foundations, a metal standing seam roof, and exterior walls composed of masonry and metal panels. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and an underground stormwater retention system. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 1 hour ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and flooring installation, rubber wall base installation, and necessary plumbing and electrical work to restore dormitory rooms, offices, and medical areas to their original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on best value, with evaluation weights assigned to price (60 percent), quality (20 percent), past performance (10 percent), and schedule (10 percent). Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Requirements include a valid Massachusetts Contractor's License, proof of specific automobile liability insurance, and compliance with the Davis-Bacon Act, OSHA, EPA, and NFPA-101 standards. The contract includes a one-year workmanship guarantee and a 20-year product warranty for LVP flooring, with payment terms set at Net 30.
Grafton Job Corps

POSTED

about 1 hour ago

DEADLINE

in 25 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The comprehensive scope of work includes the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine, along with a new Ordnance Operations building, Truck Inspection area, and Sentry building. The project involves extensive site preparation, including clearing, rock excavation, and the demolition of 18 existing magazines and two buildings. Specialized construction requirements include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and mitigation for impacts on existing wetlands. The project duration is estimated at 1828 calendar days and encompasses a wide array of trades, including demolition, abatement, concrete, masonry, structural steel, roofing, electrical, plumbing, and mechanical systems. Additional site improvements involve the installation of access roads, paved loading areas, landscaping, and full electrical utility infrastructure. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026, and should contact Rahul Maheshwari to receive the formal bid invitation and access to project documents.
J & J Contractors, Inc

POSTED

about 1 hour ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The Ohio Department of Administrative Services is seeking Construction Manager at Risk firms to provide construction management services for major facility upgrades, renovations, and repairs across six managed buildings in Columbus, Franklin County. These projects, supporting the FY 27/28 biennium funding cycle, include improvements to the Front Facility, Riffe Center, State of Ohio Computer Center, James A. Rhodes State Office Tower, Office Services Building, and North High Complex. Total state funding for these initiatives exceeds 120 million dollars, with individual project costs ranging from approximately 2.9 million to 36.1 million dollars. The scope of work may encompass MEP maintenance, aesthetic and functional tenant upgrades, roofing, facade restoration, and ADA compliance. Selected firms will provide both preconstruction and construction services, including constructability reviews, cost estimating, value engineering, and subcontractor management using an open book pricing method. The process involves a shortlist of the top six ranked teams, with multiple selections planned. Each project will be executed under a separate best value agreement and construction contract. Requirements for the CMR firms include experience with the Ohio Facilities Construction Commission standards, maintenance of high-rise office buildings in urban environments, and expertise in secure government facilities and complex MEP systems.

General Info

Ohio DAS seeks CMAR firms for $120M+ facility upgrades across six Columbus buildings.

Documents

2

RFQ-DAS-2600XX-CMR Request for Qualifications - CM at Risk

PDF, High priority: read this first6 pages · rfq
High

DAS260015 RFQ Question and Answer List

PDF, Low priority1 page · q-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOhio Department of Administrative Services
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Jill HooblerSubmission Recipient

Full Description

Show more
Project number: DAS-260015 DAS-260016 DAS-260018 DAS-260021 DAS-260022 DAS-260023
The Ohio Department of Administrative Services (ODAS), Office of Properties and Facilities (OPF), is seeking to engage CM at Risk firms to provide construction management services for a range of major facility upgrades/renovations/repair needs across its managed building portfolio. These services will support the FY 27/28 biennium funding cycle. The buildings included in this RFQ, along with their associated project numbers, are listed following. DAS-260015 Front Facility Improvements FY27 25 South Front Street Columbus, Franklin County State Funding: $12,410,000.00 Estimated Construction Cost: $10,725,000.00 DAS-260016 Riffe Facility Improvements FY27 Vern Riffe Center for Gov’t and the Arts 77 South High Street Columbus, Franklin County State Funding: $41,350,000.00 Estimated Construction Cost: $36,100,000.00 DAS-260018 SOCC Facility Improvements FY27 State of Ohio Computer Center (SOCC) 1320 Arthur E. Adams Drive Columbus, Franklin County State Funding: $14,810,000.00 Estimated Construction Cost: $12,800,000.00 DAS-260021 Rhodes Facility Improvements FY27 James A. Rhodes State Office Tower 30 East Broad Street Columbus, Franklin County State Funding: $35,430,000.00 Estimated Construction Cost: $31,075,000.00 DAS-260022 Surface Facility Improvements FY27 Office Services Building 4200 Surface Road Columbus, Franklin County State Funding: $3,600,000.00 Estimated Construction Cost: $2,900,000.00 DAS-260023 NHC Facility Improvements FY27 North High Complex 35 East Chestnut Street & 246 North High Street Columbus, Franklin County State Funding: $24,400,000.00 Estimated Construction Cost: $21,275,000.00 Professional design services are being acquired by the Contracting Authority under a separate contract. The A/E services include facility condition assessments which will help DAS tailor the scope of work that will be implemented via the CMR contract(s). The exact scope of work is not yet known at this time but may include building MEP end of life/maintenance needs, aesthetic and tenant functional upgrades, roofing repairs/replacement, façade repairs/restoration, code/ADA upgrades. The estimated per building costs should be regarded as preliminary approximations only and are subject to significant adjustment based on DAS prioritization of work and actual authorized capital releases. The selected CMR teams may be requested to assist/support the A/E’s facility condition assessment field work, etc. It is anticipated that the top six (6 ) ranked CMR teams will be shortlisted for Proposal Request. Multiple selections of CMR firms are planned, and selection of a CMR team for one or multiple projects (sites) will be at the sole discretion of the Contracting Authority and the Owner. Projects and associated services may be awarded and implemented on a slightly staggered schedule, the timelines provided in section D should be regarded as a preliminary approximation only. Each project/site will be executed under a separate CMR best value agreement and will result in a separate construction contract. All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority and/or Owner’s policies and procedures.
Scope of Services: The selected Construction Manager at Risk (“CMR”) firms, as a portion of their required Scope of Services and prior to submitting their proposal, will discuss and clarify with the Contracting Authority and/or Owner, the breakdown of the Agreement detailed cost components, to address the Owner’s project requirements and refine the project schedule. Participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services: provide constructability review comments on documents produced by the A/E during the Schematic Design, Design Development, and Construction Document stages; develop and maintain estimates of probable construction cost, value engineering, project schedules, and construction schedules; lead and manage the Subcontractor Prequalification and Bidding process, Construction and Closeout Stage. Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov. The preconstruction and construction services are generally described below. Subcontracts including but not limited to Plumbing, Fire Protection, HVAC, Electrical and AV/Technology will be awarded by the CM to prequalified vendors using a competitive process. The parties will engage in an “open book” pricing method in which all subcontracted work shall be based upon competitive pricing that will be reviewed by the Contracting Authority and/or Owner, the A/E and the CM. The Contracting Authority and/or Owner shall have access to all books, records, documents and other data in the CM's possession related to itself, its subcontractors and material suppliers pertaining to bidding, pricing or performance of the Agreement. Preconstruction Services: The CM will work cooperatively with the Contracting Authority and/or Owner, A/E, and Project Team, and will provide, among other services, schedule development, estimate development, Guaranteed Maximum Price (“GMP”) proposal, subcontractor prequalification and bidding, constructability review, permits, budgeting, value engineering, and preconstruction planning throughout the preconstruction stages. When the drawings and specifications are at the stage of completion specified in the Agreement, such partially completed documents (the “Basis Documents”) shall be provided to the CM, together with the A/E's detailed listing of any incomplete design elements and the A/E’s statement of intended scope with respect to such incomplete elements (the “Design Intent Statement”). Contingent upon the Contracting Authority’s approval of the GMP, the parties will enter into an amendment to the Agreement establishing the Contract Sum (“GMP Amendment”). If the proposed Contract Sum exceeds the Project Budget established for construction, then the Contracting Authority may terminate the agreement with the CM and seek proposals from other firms for completion of the Project. Construction Services: The CM shall construct the Project pursuant to the construction documents and in accordance with the schedule requirements. The CM shall hold all subcontracts and shall be fully responsible for the means and methods of construction, project safety, project completion within the schedule agreed upon in the preconstruction phase, compliance with all applicable laws and regulations including monitoring compliance with all EDGE, equal employment, and prevailing wage requirements, and submitting monthly reports of these activities to the Contracting Authority. All subcontracts shall be on the subcontract form prescribed by OAC Section 153:1-03-02. The Contracting Authority reserves the right to approve the CM’s selection of subcontractors and any supplemental terms to the form subcontract. For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: 1. Project Delivery Method: Construction Manager at Risk 2. Role on Project: CMR 3. LEED Status: N/A 4. State of Ohio OFCC (Standard Documents / OAKS CI) experience 5. Maintenance of mid- & high-rise office buildings in urban environments 6. Secure Government Facilities 7. Experience with MEP systems with BAC systems 8. Experience with Building Façade Restoration 9. Experience with Fire Alarm systems 10. Experience with Tenant Buildouts / Office renovations

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS