Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

David C. McCollom Water Treatment Plant Membrane Basin Rehabilitation in CA

Active
david-c-mccollom-water-treatment-plant-membrane-basin-rehabilitation-ca

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Garney Pacific, Inc. is soliciting bids for a multi-year membrane basin rehabilitation program at the David C. McCollom Water Treatment Plant located in Escondido, California. The primary objective of this project is to restore and extend the service life of critical membrane treatment infrastructure. The scope of work encompasses the rehabilitation of multiple concrete membrane basins, the replacement of protective liner systems, and various structural, mechanical, and coating improvements. Additionally, the project includes the replacement of the Combined Influent and Backpulse Pipe. This solicitation is open to various small business categories, including Small Disadvantaged Businesses, Women-Owned Small Businesses, and HUBZone Small Businesses, with a specific emphasis on seeking Disadvantaged Business Enterprise subcontractors for concrete repair, electrical work, and coatings. The project requires adherence to union labor and bonding requirements. All bids and quotes must be submitted by September 1, 2026, at 2:00 PM PT. Primary coordination for the project is managed by Alyssa Callaway.

General Info

Garney Pacific seeks small business bids for California water plant membrane basin rehabilitation.

Agency

Garney Pacific, Inc.View Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CA, USA

Set-Aside

SBA

Documents

(1)

David C. McCollom WTP Membrane Basin Rehabilitation Bid Advertisement

PDF1 pagespecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGarney Pacific, Inc.
Contacts1 person available
OfficeN/A
Organization / Agency
Garney Pacific, Inc.
View Agency Profile
Office AddressN/A

Full Description

Show more
This is a multi-year membrane basin rehabilitation program to restore and extend the service life of critical membrane treatment infrastructure. Work to include rehabilitation of multiple concrete membrane basins, replacement of protective liner systems, associated structural, mechanical, and coating improvements, and replacement of the Combined Influent and Backpulse Pipe(CIBPP).

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project (PN C155003) involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. With an engineer's estimate of 36,000,000 dollars, the project is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. Filanc is soliciting quotes for a wide range of scopes, including pipeline infrastructure such as pipe, valves, welding, cathodic protection, and jack and bore operations; site work including paving, striping, flatwork, precast vaults, fencing, and potholing; and technical services such as surveying, videography, testing, inspections, settlement monitoring, and E&IC. Additional requirements include SWPPP implementation, traffic control and plans, and asbestos pipe demolition and removal. Bids are due by 2:00 PM on September 18, 2026. The solicitation is open to various small business set-asides, including SDB, WOSB, HUBZone, and VOSB, and strongly encourages participation from SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, and equipment if necessary. Interested parties can obtain plans and specifications at no cost by contacting Julia Masaitis. The project falls under NAICS code 237110 and emphasizes a strict commitment to equal opportunity and non-discrimination.
Filanc

POSTED

about 18 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Garney Pacific, Inc.

Same awarding agency

NAICS: 237110
New
Water Line Replacement at Oakland and Santa Fe - CIP 5661 in CA
Solicitation # CIP 5661
Garney Pacific, Inc. is soliciting subcontractor quotes for the Water Line Replacement at Oakland and Santa Fe (CIP 5661) project located in Hemet, California, for the City of Hemet. The scope of work involves the installation of approximately 8,200 linear feet of 16-inch C900 PVC water main, including all necessary fittings, valves, valve boxes, and appurtenances. Additional requirements include the installation of fire hydrants, blow-offs, air/vacuum release assemblies, service connections, and tie-ins to existing facilities. The contractor is responsible for all trenching, excavation, bedding, backfill, compaction, and the construction of thrust restraint systems. Following installation, the contractor must perform all required testing and disinfection to ensure a complete and operable system, which must be approved by the Engineer before being placed into service. The project also requires the restoration of all disturbed areas, including asphalt paving, concrete replacement, aggregate base, and decorative crosswalk improvements. This solicitation is open to various small business set-asides, including SDB, WOSB, HUBZone, and VOSB, with a strong emphasis on DBE participation. Because Garney Pacific, Inc. is a union contractor, all subcontractors must utilize union labor. Additionally, subcontractors must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, though Garney will reimburse the bond premium. All quotes must be submitted by September 21, 2026, at 3:00 PM PT.
Water and Sewer Line and Related Structures Construction

POSTED

about 18 hours ago

DEADLINE

in 23 days
View Details