Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Bristol - North Carolina was posted on October 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC

Closed
873266State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation, falling under NAICS code 236220. The solicitation was posted on October 26, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements to secure project financing. Bidders must demonstrate comprehensive outreach and recruitment activities, including posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency. Failure to submit proof of these specific public notices and agency utilizations within the bid package will result in the proposal being deemed non-responsive. Documentation for general outreach may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 6 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring shallow foundations, a metal standing seam roof, and exterior walls composed of masonry and metal panels. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement, painting, ceiling tile and flooring installation, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets to restore the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. Award will be based on best value, evaluated through price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Requirements include a valid Massachusetts Contractor's License, proof of specific automobile liability insurance naming Adams and Associates, Inc. as an additional insured, and compliance with Davis-Bacon Act wage determinations, OSHA, EPA, ADA, and NFPA-101 life safety codes. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 6 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. Site preparation involves rock excavation, grading, and mitigation for impacted wetlands, as well as the installation of access roads, paving, and telecommunications infrastructure. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 6 hours ago

DEADLINE

in 3 days

AI Contract Overview

Show more

Solicitation 70Z04726RPCN0018 is a fixed-price design-build contract for the construction of a full-motion Weapons System Trainer facility for HC-130J aircraft at USCG Base Elizabeth City, North Carolina. The project involves the creation of an approximately 13,000 gross square foot facility designed to house a Government Furnished, Government Installed mobile simulator. Key spaces include classrooms, administrative offices, debriefing areas, and essential support rooms for electrical, mechanical, and telecommunications systems. Site work encompasses the installation of sidewalks and landscaping while utilizing existing parking areas. The project has an estimated value of approximately 16 million dollars and a period of performance of 719 calendar days from the date of award. Technical requirements specify adherence to ASCE 24 Flood Design Class II and the mandatory use of Siemens Building Automation System equipment to ensure compatibility with existing base infrastructure. The award will be based on best value using tradeoff selection procedures, evaluating non-price factors such as planning, organization, communication, and construction approach—with a preference for offerors experienced in military or commercial flight simulators. Compliance mandates include the Davis-Bacon Act for prevailing wages, UFC 4-010-06 for cybersecurity of control systems, and strict security protocols requiring US citizenship for all on-site personnel. Quality control is managed through a rigorous system of preparatory and initial phase checklists, daily production reports, and government quality assurance inspections.

General Info

Fixed-price $16M design-build for HC-130J trainer facility at USCG Base Elizabeth City.

Place of Performance

U.S. Coast Guard Base Elizabeth City, Elizabeth City, NC, 27909, USA

Set-Aside

NONE

Documents

75

70Z04726RPCN0018 Amendment 0001

PDF, High priority: read this first2 pages · amendment
High

70Z04726RPCNI0018 Task Order Announcement – HC-130J Simulator Facility

PDF, High priority: read this first45 pages · task-order-announcement
High

Amendment 0002 - HC-130 Simulator Facility RFP

PDF, High priority: read this first58 pages · amendment
High

Appendix B - Criteria for Electronic Deliverables

PDF, High priority: read this first2 pages · specifications
High

Appendix D - Design Narrative (Nov 2021)

PDF, High priority: read this first6 pages · sow
High

Appendix E - Industry Standards for Construction Documents

PDF, High priority: read this first11 pages · specifications
High

BESEP C130 Simulator Facility RFP Submittal

DOCX, High priority: read this first24 pages · rfp
High

BFR C-130J Simulator Facility, 5/21/2026

PDF, High priority: read this first1 page · sow
High

City of Elizabeth City IUP Permit - US Coast Guard Base

PDF, High priority: read this firstpermit
High

Drawing Format and Handling Job Guide

PDF, High priority: read this first27 pages · sow
High

EC17-151G MTU Hangar Geotechnical Report

PDF, High priority: read this first101 pages · sow
High

FDCC Environmental Compliance Inspection Form (July 2022)

PDF, High priority: read this first7 pages · sow
High

HC-130J WST #1 Training Facilities Requirements Rev 29 May 2026

DOC, High priority: read this first12 pages · sow
High

J&A 70Z04726RPCNI0018 - HC-130J Simulator Facility Siemens BAS

PDF, High priority: read this first7 pages · justification-and-authorization
High

JCAT Design Details Tier 5-6

PDF, High priority: read this first4 pages · specifications
High

NC20260056 Wage Determination - Building, Pasquotank County

PDF, High priority: read this firstwage-determination
High

RFP 32000479 - Construct C-130J Simulator Building

PDF, High priority: read this first3 pages · rfp
High

Schedule of Special Inspections - Structural Steel

DOCX, High priority: read this first24 pages · sow
High

SFRL 32000479 Request for Proposal – Design Criteria Documents

PDF, High priority: read this first194 pages · rfp
High

SILC-CSTO-36-71 91 11 13-10 New Building Design and Construction

PDF, High priority: read this first50 pages · technical-order
High

SILC-CSTO36 Drawing Standards and Management

PDF, High priority: read this first13 pages · technical-order
High

Site Survey Report Rev. January 2008 – Rescue Swimmer Training Facility

PDF, High priority: read this first79 pages · sow
High

USCG Base Elizabeth City Flow and Pressure Tests

PDF, High priority: read this first28 pages · sow
High

USCG Base Elizabeth City SPCC Plan, January 2022

PDF, High priority: read this firstsow
High

USCGB Base Elizabeth City - Conceptual Site Plan

PDF, High priority: read this firstspecifications
High

USCG CEU Providence Utilities ICAM Phase 2 - CG Base Elizabeth City

PDF, High priority: read this firstspecifications
High

Air Permit No. 04138R26 – USCG Base Support Unit Elizabeth City

PDF, Low priority32 pages · permit
Low

Base Elizabeth City Visitor Request Form

XLSX, Low priority4 pages · form
Low

C-130 Simulator Site LocationF 06.23.2026

PDF, Low priorityother
Low

Contractor Production Report

PDF, Low priority1 page · other
Low

Contractor Quality Control Report

PDF, Low priority1 page · other
Low

Design Clarification Request Log

XLSX, Low priority1 page · log
Low

Equipment Enrollment Form with MRL v7.0 (5/1/2025)

XLSX, Low priority18 pages · equipment-enrollment-form
Low

Field Changes Log

XLSX, Low priority1 page · other
Low

Government Quality Assurance Report

PDF, Low priority1 page · quality-assurance-report
Low

Initial Phase Checklist

PDF, Low priority1 page · other
Low

June 23, 2026 SHPO Consultation for C-130J Simulator Facility

PDF, Low priority7 pages · special-notice
Low

NC20260019 Heavy Construction Wage Determination

PDF, Low prioritywage-determination
Low

NC2690308232 Hazardous Waste Management Permit - USCG Base Elizabeth City

PDF, Low prioritypermit
Low

Preparatory Phase Checklist (Form 4296/2B)

PDF, Low priority2 pages · other
Low

Pre-Proposal Inquiry Submittal Form

XLSX, Low priority1 page · q-and-a
Low

Rework Items List

PDF, Low priority1 page · other
Low

Submittal Log

XLSX, Low priority1 page · other
Low

Submittal Transmittal and Government Response Form

PDF, Low priority3 pages · other
Low

Submittal Transmittal Form

DOCX, Low priority2 pages · submittal-transmittal
Low

Testing Plan and Log Sheet

PDF, Low priority1 page · other
Low

USCG Base Elizabeth City SPPP Final Report, August 2022

PDF, Low priority220 pages · other
Low

USCG C-130J Simulator Facility Coastal Zone Consistency Determination

PDF, Low priority27 pages · special-notice
Low

USCG C-130J Simulator Project Site Consultation Letter

PDF, Low priority6 pages · special-notice
Low

USCG Section 106 Consultation - C-130J Simulator Facility (June 23, 2026)

PDF, Low priority6 pages · special-notice
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Sep 25, 2026 to Sep 24, 2026.

Notice updated

The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Deadline changed

Response deadline changed from Sep 24, 2026 to Oct 2, 2026.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyBristol - North Carolina → Bristol Alliance of Companies
Contacts1 person available
OfficeN/A

Full Description

Show more
This project entails the complete design and construction of a full motion Weapons System Trainer (flight simulator) facility for the C-130J aircraft. The facility, approximately 13,000 GSF, includes spaces for the Government Furnish, Government Installed (GFGI), mobile simulator, classrooms, administrative spaces for instructors and personnel, debriefing training spaces, and support spaces (including but not limited to electrical, fire protection, mechanical, storage, janitorial, supply, restrooms, and telecommunications spaces. The site work shall include sidewalks and landscaping. The new facility shall make use of existing parking areas.
Pre-bid meeting (optional): 09-10-2026 9:00 AM (ET)

More opportunities from Bristol - North Carolina → Bristol Alliance of Companies

Same awarding agency

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for comprehensive interior modernization. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms by replacing vanities and lavatories, and updating interior surfaces with new paint. Technical upgrades involve installing raised flooring and electrical distribution to support classroom needs, implementing simple dimming lighting controls, replacing lamps, ballasts, and ceiling fans, and replacing variable air volume systems to correct HVAC and plumbing deficiencies. The project also encompasses the installation of new signage and ensures all work complies with ADA accessibility guidelines. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeframe of 425 calendar days after the notice to proceed. Award will be determined using a best suited negotiate methodology, evaluating price alongside past performance and corporate relevant experience. The contractor is required to provide performance and payment bonds equal to 100 percent of the contract price and must adhere to specific prevailing wage rates for the Georgia region. Quality control is strictly managed through a required Construction QC Plan, with a multi-stage inspection process including punch-out, pre-final, and final acceptance inspections. Proposals must be submitted electronically to the contracting officer by November 9, 2026.
Commercial and Institutional Building Construction

POSTED

about 6 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a fixed-price construction project for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, compressed air, and NFPA-compliant fire suppression systems. Additionally, the project requires the replacement of electrical distribution, lighting, low-voltage systems, and building automation controls, alongside site improvements such as paving, drainage upgrades, and hazardous materials abatement. The estimated contract value ranges between 10 million and 25 million dollars, with a performance period of 730 days after award. Award will be based on the lowest price for two primary exhibit line items: building renovation and the removal and replacement of paving. Bidders must adhere to the Buy American statute and Davis-Bacon Act wage determinations. Bonding requirements are tiered, with proposals exceeding 150 thousand dollars requiring bid, payment, and performance bonds. The contractor is required to implement a three-phase quality control plan and provide extensive technical submittals, including shop drawings and test reports. Invoicing is conducted monthly via Wide Area Work Flow, requiring various NAVFAC forms and certified payrolls. All work must comply with ADA accessibility guidelines and specific military standards for piping and cybersecurity for facility-related control systems.
Commercial and Institutional Building Construction

POSTED

about 6 hours ago

DEADLINE

in 27 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS