This Solicitation opportunity from California was posted on August 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
De Anza Way/State Route 165 Access Improvements
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Los Banos, California, is soliciting competitive bids for the De Anza Way/State Route 165 Access Improvements project under solicitation number 20260807028, with a bid deadline of August 26, 2026. The contract encompasses all labor, materials, and equipment necessary to complete roadway construction including mobilization, traffic control, removal of asphalt and concrete, reconstruction of catch basins, installation of erosion controls, pavement marking, curb and gutter, sidewalk, and driveway aprons—all performed in accordance with the City of Los Banos Standard Specifications and Caltrans Standard Specifications (2010 edition and updates). All work is to be performed at the project site in Los Banos, CA, 93635, with inspections conducted on-site by the Engineer and final acceptance contingent upon full compliance with contractual requirements. The contract is structured as a fixed-price arrangement, with all bid items listed as lump sum, though no actual pricing values are provided in the solicitation, rendering the total contract value undefined. Bidders must submit six sealed hard copies to the City Clerk’s office by 2:00 p.m. PST on the deadline, and a bid bond equal to at least 10% of the bid amount is mandatory. Attendance at the mandatory pre-bid meeting is required, and no electronic, emailed, or faxed submissions will be accepted. The bid evaluation process prioritizes technical compliance and accurate, responsive pricing, with unit prices controlling over extended totals, though the formal basis of award—such as LPTA—is not explicitly stated. Contractors must comply with mandatory certifications including NPDES/MS4, non-collusion, equal opportunity, and debarment status, all of which were left unsigned in the submitted documentation, potentially rendering incomplete bids nonresponsive. Insurance and indemnity requirements mandate the City be named as an additional insured, and prime contractors are responsible for all subcontractor performance. Material substitutions require prior approval, and hazardous material discovery triggers mandatory notification. Retention may be withheld per contract terms, and liquidated damages apply for delays, with contract time deemed essential. Change orders and addenda are formal mechanisms for modifications, though none are currently issued. No federal accounting codes, payment office details, or electronic invoicing systems like WAWF are required, and no named COR, COTR, or PCO are identified—oversight is managed functionally by the Engineer and Owner. No socioeconomic or small
General Info
Place of Performance
Los Banos, CA, 93635, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
