Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

De La Vina Bridge Street Replacement Project (California Endangered Species Act Incidental Take Permit No. 2081-2025-071-05 (ITP))

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The De La Vina Bridge Street Replacement Project, led by the City of Santa Barbara, involves the replacement of the De La Vina Street Bridge over Mission Creek. The scope of work includes the demolition of the existing bridge and buildings, utility relocation, temporary creek diversion and dewatering, and the construction of a new bridge featuring abutments, concrete wingwalls, rock slope protection, and downstream soldier pile walls. Additionally, the project involves the temporary installation of 625 cubic yards of fill to support a drill rig. Stage 1 specifically focuses on the downstream portion of the bridge, channel walls, creek grading, and the reconstruction of creek banks using rock slope protection. To comply with the California Endangered Species Act, the California Department of Fish and Wildlife issued Incidental Take Permit No. 2081-2025-071-05, which authorizes the incidental take of the endangered southern California steelhead. The project is expected to cause a permanent loss of 0.01 acres and a temporary loss of 0.15 acres of steelhead habitat, with indirect impacts extending 7,275 linear feet between the project site and the bridge on California State Route 192. The City of Santa Barbara has determined the project is categorically exempt under California Code of Regulations Title 14, section 15302. Key project administration is managed by Project Planner Kathleen Kennedy and Public Works Director Brian D'Amour, with environmental oversight provided by Cooper Wall of the CDFW.

General Info

City of Santa Barbara bridge replacement project with steelhead habitat incidental take permit.

Agency

California → City of Santa Barbara

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Santa Barbara, CA

Set-Aside

NONE

Documents

(1)

2081-2025-071-05 De La Vina Bridge Replacement Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Santa Barbara
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Santa Barbara
Office AddressN/A
Contacts
Cooper WallEnvironmental Scientist
Kathleen KennedyProject Planner
Brian D’AmourPublic Works Director

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has issued an ITP (No. 2081-2025-071-05), pursuant to Section 2081(b) of the Fish and Game Code to City of Santa Barbara. The Project includes replacement of the De La Vina Street Bridge over Mission Creek. The Project activities include demolition of an existing bridge and buildings; utility relocation; temporary creek diversion and dewatering; temporary construction of diversion dams; installation of the new bridge, associated abutments, concrete wingwalls, rock slope protection, and downstream soldier pile walls; use of temporary work areas within the creek; temporary installation of approximately 625 cubic yards of fill in the channel to act as a platform for a Drill Rig; and other activities. The covered activities under this Incidental Take Permit only include portions of Stage I of the Project which will be constructed from the issuance of this permit. Stage 1 of the Project entails the construction of the downstream portion of the bridge, abutments and channel walls, placement of rock slope protection to reconstruct the creek banks, creek grading, and temporary creek diversion. The Project is expected to cause the permanent loss of 0.01 acres of habitat for southern California steelhead (Oncorhynchus mykiss) due to alteration of the creek bank and temporary loss of 0.15 acres of habitat for southern California steelhead. Indirect impacts resulting in 7,275 linear feet will occur between the Project site and the bridge over Mission Creek on California State Route 192. The Project is expected to result in incidental take of southern California steelhead, which is/are designated as an endangered species under the California Endangered Species Act (CESA). The ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of Project implementation.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS