Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Deaerator (DA) and Condensate System Upgrades

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Port of Seattle’s Aviation Project Management Group is seeking contractors to replace the Deaerator and Condensate tanks in the Central Mechanical Plant at Seattle-Tacoma International Airport, with an estimated contract value between $6.25 million and $7.5 million. The scope of work requires full procurement, installation, testing, and commissioning of new equipment in accordance with performance-based specifications outlined in Divisions 0 through 48 of the Project Manual, ensuring compliance with industry standards including ANSI A13.1, UL 969, ASTM E84, ASTM F594, and the International Building Code. All work must be performed on-site with strict adherence to safety protocols requiring OSHA 500-certified Safety Representatives and designated Competent Persons for fall protection, excavation, and lock-out/tag-out procedures, alongside a site-specific safety plan, hot work permits, and a drug-free workplace policy. The contract follows a Lowest Price Technically Acceptable award model, where bidders must be financially and technically responsible, meet bonding and insurance requirements, and demonstrate compliance with WMBE participation goals of at least 5% through documented outreach and self-certification. Submissions must be made electronically via email with a specific subject line format, not exceeding 10 MB per email, and late submissions will be rejected. Materials must be delivered to the site in factory packaging, with responsibility transferring upon arrival, and all labeling must meet ANSI and UL standards using durable brass or multilayer plastic materials with white-on-black contrast text and stainless steel fasteners. Final acceptance is contingent upon successful testing, submission of operation manuals, as-built drawings, and compliance certifications, with inspections conducted exclusively at the project site by the Port or its Engineer, though the Contractor retains sole responsibility for ensuring all work meets contractual obligations.

General Info

Replace deaerator and condensate tanks at Port of Seattle’s Central Mechanical Plant with energy-efficient systems.

Agency

Port of Seattle → Aviation Project Management Group

NAICS

238110 - Poured Concrete Foundation and Structure ContractorsView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

(6)

MC-0322321 Deaerator and Condensate System Upgrade Project Manual Volume 1

PDFproject-manual

MC-0322321 Deaerator and Condensate System Upgrade Project Manual Volume 2

PDFproject-manual

MC-0322321 Project Drawings for SEA-TAC Airport DA and Condensate System Upgrades

PDFproject-drawings

MC-0322321 Deaerator and Condensate System Upgrade Bidder Package

PDFrfb

MC-0322321 Deaerator and Condensate System Upgrade Advertisement for Bids

PDFrfb

MC-0322321 Hazardous Materials Survey Report Appendix A GFS

PDFsurvey-report

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyPort of Seattle → Aviation Project Management Group
Contacts2 people available
OfficeN/A
Organization / Agency
Port of Seattle → Aviation Project Management Group
Office AddressN/A
Contacts
Leila Gonzalez-RigattoPort Contact
Matthew PiccoloProject Manager

Full Description

Show more
Replace the Deaerator (DA) and Condensate tanks in the Central Mechanical Plant

Similar Contracts

Same NAICS industry code