Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Concrete Sidewalks, Curbs, and ADA Ramps

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of 270004813.

The full solicitation package (27 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

US 60 Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyVirginia → Public Works
ContactsNo contacts available
OfficeN/A
Organization / AgencyVirginia → Public Works
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs construction of new concrete sidewalks, curbs, curb extensions, traffic islands, and ADA-compliant curb ramps for prime contractors on City of Richmond Department of Public Works projects. Grades and compacts surfaces, places concrete, and installs formwork using waterproof paper ASTM C171 or PE film. Work must meet VDOT 2020 Road and Bridge Specifications and ADA accessibility guidelines. Delivers completed concrete pedestrian infrastructure.

Similar Contracts

Same NAICS industry code

More opportunities from Virginia → Public Works

Same awarding agency

NAICS: 237310
New
SLED
US 60 Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)
Solicitation # 270004813
The City of Richmond, Department of Public Works, is soliciting bids for the US 60 Downtown Expressway Gateway Pedestrian Improvements project (UPC#111702), solicitation number 270004813. The scope of work includes the construction of sidewalks, curbs, and ADA-compliant curb ramps, as well as the installation of lighting, signage, pavement markings, and traffic signal conduit. Additional requirements involve landscaping, utility adjustments, and full site restoration. The project will be performed along E. Canal, S. 7th, S. 9th, and E. Byrd Streets adjacent to Kanawha Plaza. The period of performance is 550 consecutive calendar days from the Notice to Proceed, with permitted work hours from 7:00 AM to 6:00 PM, Monday through Friday. Lane closures are strictly prohibited between 7:00 AM to 9:00 AM and 4:00 PM to 6:00 PM. The contract will be awarded to the responsive and responsible bidder based on the total computed price, with the earliest delivery date and accessibility to City officials serving as secondary factors. Bidders must submit their proposals electronically via the OpenGov portal by December 2, 2026, at 4:00 PM. Required documentation includes a bid security, performance and payment bonds, and an MBE/ESB participation commitment. Technical compliance requires adherence to the 2020 VDOT Road and Bridge Specifications and the Buy America Act. Contractors must also utilize the CRL system for electronic certified payrolls and provide a Construction Quality Assurance Plan. Inspections must be coordinated with the City or the A&E of Record with at least ten business days' notice.
Highway, Street, and Bridge Construction

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details
New
SLED
Annual Fireworks After Dark Fireworks Display
Solicitation # PW 26-0930-001
The Town of Farmville, Virginia, has issued solicitation PW 26-0930-001 for a contractor to provide a close proximity fireworks display scheduled for July 3, 2027, at approximately 9:00 p.m. The performance will take place on the roof of the Farmville Town Hall, with the vendor responsible for all materials, labor, equipment, shipping, setup, and cleanup. The display must last between 18 and 20 minutes and include an opening, main display, and grand finale. A certified pyrotechnician must be on-site, and the vendor is required to submit a comprehensive rooftop safety plan approved by the Town Fire Official. The contract is for an initial one-year term with options for two additional one-year renewals. Award will be based on the best proposal and value, and vendors must submit a total firm price proposal along with a completed pricing table. Requirements include providing a Virginia State Corporation Commission identification number, evidence of pyrotechnician certification, and references for three similar displays. The contractor must adhere to the Virginia Statewide Fire Prevention Code and NFPA standards. Extensive insurance coverage is mandatory, including Commercial General Liability of at least 1 million dollars per occurrence and an umbrella policy of 4 million dollars. Payment will be issued within 30 calendar days following the submission of an itemized invoice after display cleanup. Additionally, the contractor must maintain a drug-free workplace and adhere to nondiscrimination laws, flowing these requirements down to any subcontracts exceeding 10,000 dollars.

POSTED

3 days ago

DEADLINE

in 26 days
View Details
NAICS: 811210
SLED
Replacement of Submersible Level Transducers
Solicitation # 27-0428-0508
The City of Newport News, Virginia, is soliciting quotes under RFQ No. 27-0428-0508 for the procurement, installation, configuration, calibration, and testing of three replacement submersible level transducers at its closed landfill located at 530 Atkinson Blvd. The project aims to restore reliable liquid level data used for regulatory documentation and operational decisions. The required equipment is the Dwyer/Mercoid Model SBLTX-5-470 or an approved equal, featuring a 0–5 psi pressure range, a 470-foot integral shielded and vented cable, and a 4–20 mA direct-current output. The contractor is responsible for removing existing units and ensuring all new installations provide stable and reasonable readings before final acceptance. The project must be completed within 60 calendar days following the issuance of a purchase order or notice to proceed. Bids are due by November 5, 2026, at 3:00 pm, and the contract will be awarded to the lowest responsive and responsible bidder based on price, experience, and capability. Key requirements include providing comprehensive documentation such as calibration records and warranty data, adhering to hazardous location and seismic electrical safety standards, and maintaining commercial general liability insurance with minimum limits of $1,000,000. All deliveries are F.O.B. Destination, and payment terms are Net 30 Days unless otherwise specified.
Electronic and Precision Equipment Repair and Maintenance

POSTED

15 days ago

DEADLINE

in 12 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS