Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Replacement of Submersible Level Transducers

Open
State & Local
Response DeadlineDue in 6 days
Solicitation #
27-0428-0508

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Newport News is soliciting quotes for the procurement, installation, configuration, calibration, and testing of replacement submersible level transducers and compatible display units at its closed landfill in the Denbigh area. The project aims to restore reliable liquid level data used for regulatory documentation and operational decisions by replacing existing instruments that have reached the end of their service life. The required equipment is the Dwyer/Mercoid Model SBLTX-5-470 or an approved equal, and the installation must include compatible cable supports, connectors, and desiccant or vent protection labels. All equipment must have hazardous-location and intrinsic-safety approvals. The contract will be awarded to the lowest responsive and responsible bidder. The selected contractor must complete the project within 60 calendar days of the purchase order or notice to proceed, with final closeout documentation submitted within 10 calendar days after field installation. Acceptance is contingent upon the system demonstrating stable and reasonable readings at the receiving equipment, with each loop tested for correct polarity, supply voltage, loop resistance, and signal stability. This is a non-set-aside solicitation managed by the Public Works agency.

General Info

Newport News seeks bids to replace submersible level transducers at a closed landfill.

Documents

7
PDF, High priority: read this first4 pages · contract-document
High
PDF, High priority: read this first26 pages · rfq
High
PDF, High priority: read this first26 pages · rfq
High
PDF, High priority: read this first26 pages · rfq
High
PDF, High priority: read this first26 pages · rfq
High
PDF, High priority: read this first26 pages · rfq
High
PDF, Low priority4 pages · other
Low

Read all 7 documents

Due in 6 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Solicitation requirements

134 mandatory

167 requirements in 10 areas

  • Compliance50 · 45 must
    045

    Contractual Claims Submission

    Replacement of Submersible Level Transducers.pdf
  • Technical28 · 25 must
    095

    Material and Location Approvals

    Replacement of Submersible Level Transducers.pdf
  • Submission40 · 23 must
    001

    Quote Submission Portal

    Replacement of Submersible Level Transducers.pdf
  • 164 more requirements, each with its source quote

Read every requirement with its source and proposal context.

Read all 167 requirements
Due in 6 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 7 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

5 updates
PhaseSolicitation
Posted

Solicitation

Deadline changed

Response deadline changed from Oct 22, 2026 to Nov 5, 2026.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Nov 5, 2026 to Nov 19, 2026. The notice description changed.

Notice updated

Response deadline changed from Nov 19, 2026 to Dec 2, 2026. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Submission deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyVirginia → Public Works
Contacts2 people available
OfficeNewport News, VA, 23607, USA

Full Description

Show more
The City operates environmental monitoring systems at its closed landfill as part of ongoing post-closure care. Three existing submersible level transducers have reached the end of their useful service life or are no longer providing reliable measurements. The instruments are used to measure liquid level and transmit a continuous 4–20 mA signal to the existing monitoring equipment. Replacement is needed to restore reliable level data used for landfill monitoring, operational decisions, and regulatory documentation
Addendum #1: Please use the See What Changed link to view all the changes made by this addendum.
Addendum #2: Please use the See What Changed link to view all the changes made by this addendum.
Addendum #3: Please use the See What Changed link to view all the changes made by this addendum.
Addendum #4: Please use the See What Changed link to view all the changes made by this addendum.
Addendum #5: Please use the See What Changed link to view all the changes made by this addendum.
Addendum #6: Please use the See What Changed link to view all the changes made by this addendum.

Similar Contracts

Same NAICS industry code

NAICS: 811210
New
International
LRPS#9207540 for Long-Term Operation & Maintenance (O&M) services for solar power systems as specified in the ToR. Open only for Sudanese companies. Ali Abdulrahman Ali - [email hidden]
Solicitation # LRPS-2026-9207540
UNICEF is soliciting proposals for a two-year contract to provide comprehensive long-term operation and maintenance (O&M) services for solar power systems and the supply of critical spare parts at its facilities across Sudan. The scope of work includes scheduled monthly preventive maintenance, reactive corrective maintenance for fault diagnosis and repair, and overall system management including performance monitoring and firmware updates. Performance will be measured against strict key performance indicators, including a minimum system availability of 98%, a 100% preventive maintenance completion rate, and a 98% fill rate for spare parts. This opportunity is open only to Sudanese companies. Proposals must be submitted in USD and exclude VAT, as UNICEF is tax-exempt. The evaluation follows a best value for money principle using a weighted scoring system with a 70/30 split between technical and commercial scores; technical proposals must score at least 49 points to be considered. Bidders must submit separate technical and price proposals by December 13, 2026. Requirements for the contractor include a registered local presence in Sudan, evidence of local insurance, and the provision of qualified electrical/solar PV technicians and a designated project manager.
UNICEF

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 811210
New
International
CONTRATACIÓN DE SERVICIOS INTEGRALES PARA DENSÍMETROS NUCLEARES: MANTENIMIENTO Y CALIBRACIÓN (MOP) This tender has been posted through the UNOPS eSourcing system. / Cet avis a été publié au moyen du système eSourcing de l'UNOPS. / Esta licitación ha sido
Solicitation # RFQ/2026/65730
UNOPS is soliciting bids for the specialized preventive maintenance, electronic and mechanical repair, replacement of seals and wear parts, radioactive leak testing, and multi-line metrological calibration of three nuclear densimeters (Troxler and Humboldt brands) for the Ministry of Public Works (MOP) in Panama. All services must be performed strictly in situ at MOP headquarters located in Panamá Central, Veraguas, and Herrera, as the equipment is prohibited from leaving the territory of the Republic of Panama. Key deliverables include an initial technical report due 15 days after the start of service and a final maintenance and certification report due 45 days after the start of service. The contractor must provide a minimum six-month technical warranty on labor and parts, and all metrological calibrations must have direct traceability to internationally recognized primary laboratories such as NIST. The contract will be awarded to the lowest substantially conforming bid that meets all technical, legal, and administrative requirements. Bidders must possess valid licenses from the Ministry of Health (MINSA) for handling sealed radioactive sources (Cs-137 and Am-241:Be). The evaluation process consists of an administrative/legal review, a detailed technical evaluation, and a final financial comparison. Payment is processed via bank transfer within 30 calendar days of receiving an original invoice, contingent upon the signing of a Satisfaction Receipt by the MOP and validation by UNOPS. Contractors are required to maintain comprehensive civil liability insurance, designating UNOPS as an additional insured. There is no specified set-aside status for this solicitation.
UNOPS

POSTED

1 day ago

DEADLINE

N/A
View Details

More opportunities from Virginia → Public Works

Same awarding agency

NAICS: 237310
SLED
US 60 Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)
Solicitation # 270004813
The City of Richmond is soliciting bids for the US 60 Downtown Expressway Gateway Pedestrian Improvements project (UPC#111702), with a response deadline of December 2, 2026. The scope of work involves the construction of sidewalks, curbs, and ADA-compliant curb ramps, as well as the installation of lighting, signage, pavement markings, and traffic signal conduit. Additional requirements include landscaping, utility adjustments, and full site restoration. The project will be performed along S. 9th, S. 7th, E. Byrd, and E. Canal Streets adjacent to Kanawha Plaza. The period of performance is 550 consecutive calendar days from the Notice to Proceed, with permitted work hours from 7:00 AM to 6:00 PM, Monday through Friday. The contract is an Invitation for Bid (IFB) where the award is based on the responsive and responsible bidder, primarily evaluated by the total computed price. Bidders must submit their proposals electronically via the OpenGov portal and provide a mandatory consent form for electronic signatures with an original ink signature. Key requirements include the submission of a Construction Quality Assurance Plan (CQAP), adherence to VDOT 2020 Road and Bridge Specifications, and compliance with the Buy America Act. The contractor must provide a performance bond, a labor and material payment bond, and a bid security. Additionally, the project mandates adherence to prevailing wage rates per General Decision VA20260098 and requires the submission of an MBE/ESB Participation Commitment Form. There is no set-aside status for this solicitation.
Highway, Street, and Bridge Construction

POSTED

about 1 month ago

DEADLINE

in 5 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS