Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Deer Creek Irrigation District Fish Passage Adaptive Management Project (Notification of Lake or Streambed Alteration, No. EPIMS- EPIMS-TEH-61529-R1)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has authorized the Deer Creek Irrigation District, represented by Jeffrey Rabo, to implement an adaptive management strategy for its Fish Passage Improvement Project through a Lake and Streambed Alteration Agreement under Section 1602 of the Fish and Game Code, with notification number EPIMS-TEH-61529-R1. The project focuses exclusively on the ongoing operation, maintenance, and minor adjustments to existing diversion and fish screening structures at Deer Creek in Tehama County, California, without physical expansion or new construction. Work is conducted under categorical exemptions from the California Environmental Quality Act, specifically Classes 1, 2, and 4, which recognize routine maintenance, replacement on the same site, and minor alterations to land or vegetation that do not result in significant environmental effects. The project’s performance is monitored through adaptive management practices designed to ensure fish passage functionality and water diversion safety while maintaining ecological integrity. No federal procurement mechanisms, contract types, pricing details, or FAR clauses apply, as this is a state-regulated environmental authorization rather than a federal contract. The California Department of Fish and Wildlife retains oversight, with Davis Ferguson serving as the primary point of contact for environmental compliance and project review. There is no specified period of performance, delivery schedule, payment terms, or invoicing system, and no formal representations, certifications, or socioeconomic status declarations are required or provided under this state-level permit.

General Info

California authorizes Deer Creek Irrigation District to maintain fish passage structures under state environmental exemptions.

Agency

California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Deer Creek Irrigation District Fish Passage Adaptive Management Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Office AddressN/A
Contacts
Davis FergusonSenior Environmental Scientist
Jeffrey RaboRepresentative

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMSTEH-51629-R1, pursuant to section 1602 of the Fish and Game Code to Deer Creek Irrigation District as represented by Jeffrey Rabo. The project is limited to the implementation of an adaptive management strategy for the Deer Creek Irrigation District’s Fish Passage Improvement Project, as well as ongoing maintenance and operation activities for the associated diversion and fish screening structures.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
PACP and MACP Pipeline Condition AssessmentThis contract requires the standardized coding and reporting of pipeline and manhole defects in accordance with NASSCO’s Pipeline Assessment Certification Program (PACP) and Manhole Assessment Certification Program (MACP) protocols. All condition assessments must follow these industry-recognized guidelines to ensure accurate, consistent, and defensible data collection for infrastructure evaluation and maintenance planning. The work is part of a larger infrastructure project under SAK Construction, LLC, and performance is expected to adhere to strict quality control measures aligned with national best practices for utility asset management. The solicitation is designated as a subcontract under the Small Business Administration’s set-aside programs, with eligibility limited to Small Business, Small Disadvantaged Business, Women-Owned Small Business, Veteran-Owned Small Business, Alaskan Native Corporations, Indian Tribes, and Disadvantaged Business Enterprises certified under the Department of Transportation’s DBE program. The NAICS code 541620 categorizes this as an engineering services contract, confirming the technical nature of the condition assessment work. The response deadline is September 10, 2026, and the performance location is tied to the SARP10 Humphreys Blvd CIPP project in Memphis, Tennessee, though specific site details are not fully defined in the provided data.
SAK Construction, LLC

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
SLED
Quality Assurance and Compliance Testing (Environmental/Chemical)The contract requires third-party testing and verification of brine salt to ensure full compliance with TxDOT CAT 8C-B specifications, focusing on critical parameters such as concentration, purity, and corrosion characteristics. This work is essential for confirming that the brine salt meets the stringent environmental and chemical standards mandated by the Texas Department of Transportation for use in transportation infrastructure applications. The testing must be conducted by qualified external laboratories with proven expertise in chemical analysis and environmental compliance to guarantee accurate, reproducible results aligned with state requirements. The solicitation is classified as a subcontract under NAICS code 541620, indicating it involves scientific and technical testing services. It is posted under the Texas SmartBuy portal with a response deadline of September 1, 2026, allowing potential bidders sufficient time to prepare detailed proposals demonstrating their technical capability, equipment certification, and experience with similar transportation-related materials testing. The place of performance and point of contact details are unspecified, but all work must align with Texas Department of Transportation's operational and regulatory expectations, ensuring the brine salt used in state projects remains safe, effective, and environmentally compliant.
Texas Department of Transportation

POSTED

about 10 hours ago

DEADLINE

in 25 days
View Details
NAICS: 541620
New
SLED
Erosion Control and Stormwater ManagementThe contract pertains to erosion control and stormwater management activities required during and after construction projects under the jurisdiction of the Texas Department of Transportation. It encompasses the installation and maintenance of best management practices such as silt fences, sediment basins, inlet protection structures, and related measures designed to prevent sediment runoff and protect water quality. The work must be performed in accordance with state and federal environmental regulations to mitigate the impact of construction on surrounding ecosystems and waterways. All activities are to be completed within the designated project areas, with strict adherence to timelines and performance standards. The contract is classified as a subcontract and is open for bids with a response deadline of September 2, 2026. It falls under the NAICS code 541620, indicating it involves environmental consulting and related services. The solicitation was posted on August 7, 2026, and is accessible through the Texas SmartBuy portal. While specific performance locations and contact details are not provided, the work is expected to occur across various Texas transportation construction sites. Contractors must demonstrate experience in implementing erosion and sediment control systems and be prepared to provide documentation and inspections to verify compliance with established environmental protocols.
Texas Department of Transportation

POSTED

about 10 hours ago

DEADLINE

in 26 days
View Details