Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on July 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Defense Supply Center of Richmond (DSCR) Walkway Light Repairs

Closed
SP470326Q0055Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to protect against salt air and moisture. The installation includes two new NEMA 3R automatic transfer switches, securing the units to the existing concrete slab with Grade 5 or higher galvanized anchor bolts, and performing comprehensive generator load tests. The project is estimated to have a magnitude between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates technical understanding, a sound implementation approach, and a robust safety and quality control program. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and strict security protocols, including PIV card issuance and non-disclosure agreements for personnel. All work must be performed during regular business hours, Monday through Friday, and must comply with NFPA 70, the International Building Code, and NEC Article 445.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The LED Lighting and Occupancy Sensor Upgrade project is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for the Buffalo Federal Detention Facility in Batavia, New York. The project involves providing all engineering, labor, equipment, and materials to upgrade the facility with energy-efficient LED lighting fixtures and occupancy sensors, including the removal and disposal of existing fluorescent fixtures, lamps, and ballasts. The estimated magnitude of the contract is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. Award will be based solely on the lowest total evaluated price. The contractor is required to adhere to Davis-Bacon Act wage determinations and comply with standards from OSHA, ADA, NFPA, and the International Building Code. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and a final closeout package consisting of as-built drawings, warranty documentation, and 5 percent attic stock. The contractor must also provide a minimum two-hour training session for facility maintenance personnel and a detailed commissioning report verifying that 100 percent of fixtures and controls were tested. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves a Firm-Fixed-Price task order under an 8(a) Multiple Award Construction Contract for the provision and installation of two 40ft steel FLEXTAINER conex offices for forensics personnel at the St. Thomas HSI Facility in the US Virgin Islands. The scope of work includes the construction of 3k PSI reinforced concrete slabs, installation of the units, and equipping each office with two split-system A/C units, R-11 insulation, vinyl flooring, LED lighting, and a steel door with a Cypher lock. Each unit must also include four security windows and a 5-pound ABC fire extinguisher. Electrical connectivity must be established via 2-inch PVC or uPVC conduit to the nearest circuit. The contract has an estimated magnitude between 250,000 and 300,000 dollars, with a period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price, considering technical approach, safety, and quality control plans. Key requirements include compliance with the Buy American Act, adherence to Davis-Bacon prevailing wage rates for the Virgin Islands, and strict security protocols, including the signing of DHS Non-Disclosure Agreements and mandatory cybersecurity training. Contractors must conduct a site survey prior to proposal submission and provide a detailed project schedule within 15 days of the Notice to Proceed. All invoicing must be processed through the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management & Training Corporation (MTC), operator of the Inland Empire Job Corps Center in San Bernardino, California, is soliciting subcontractor bids for a fixed-price, single lump sum contract to address fire alarm deficiencies. The scope of work includes the installation of manual pull stations, horn/strobe notification appliances, and the replacement of six existing fire alarm bells with new horn/strobe units. All new devices must be integrated into the existing fire alarm system and undergo complete functional testing. The project must be completed within 90 consecutive business days following a written Notice to Proceed, with work beginning within five business days of an agreed-upon start date. Bids are due by 3:00 pm PT on September 16, 2026. Submissions must include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, a completed MTC Supplier Packet (W-9, self-certification, and terms acceptance), and proof of insurance. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds totaling 100% of the contract price. The contract is subject to Construction Wage Rate Requirements (CWRR), requiring compliance with California prevailing wage determinations and the submission of weekly certified payroll. Award will be based on overall best value.
Inland Empire Job Corps

POSTED

about 10 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The Defense Supply Center Richmond (DSCR) is soliciting proposals for the repair and enhancement of pedestrian lighting along a 400-foot walkway located after the turnstile, as part of a firm-fixed price contract under FAR Part 12 and supplemented with construction specifications from FAR Part 36. The project requires the installation of new LED bollard lights—8 inches in diameter and 42 inches high with a black finish, 4000K color temperature, and minimum 2000 lumens—spaced every 20 feet along the walkway, along with new concrete bases constructed using Sono tube forms that meet specific diameter, strength, and elevation requirements. Existing non-operational light poles will be repaired, and approximately 13 additional poles near Building 34 will have their bulbs replaced with LED equivalents matching the new sidewalk lighting. All new and upgraded fixtures must be connected to the existing electrical panel near the turnstile via rigid conduit, with a dusk-to-dawn photocell control system installed to automate operation. The contractor must also provide portable toilets, comply with MIL-STD-129 for packaging and marking, and adhere to the Buy American Act and Hazard Communication Standard for all materials. The work is governed by the Davis-Bacon Act, with wages determined by WD #: VA20260017, and must be performed by a small business concern certified under NAICS code 238210 with a size standard of $19 million. Only offerors with a bona fide place of business within 125 miles of DSCR are eligible, and all must be registered in SAM prior to award. Proposals are evaluated on a lowest priced, technically acceptable basis, with technical acceptability determined by full compliance with the Statement of Work and past performance verified through CPARS and SPRS. All submissions must include a project narrative, five relevant completed projects from the last five years, and detailed technical documentation including product cut sheets and up to three samples of the proposed bollard lights for review and approval. The solicitation requires specific compliance with U.S. Army Corps of Engineers inspection protocols, a CQC System Manager with authority to halt non-compliant work, and submission of final documentation in two loose-leaf binders within five days of the final inspection. Invoicing will be done monthly via Wide Area Workflow, with payment linked to accepted performance metrics. Site visits are mandatory and require pre-enrollment in DBIDS at least five business days

General Info

DSCR seeks small business quotes for LED lighting upgrades and repairs on walkway; 90-day project.

Agency

Department Of Defense → Dcso Richmond Division #1View Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Richmond, VA, 23237, USA

Set-Aside

SBA

Documents

(5)

Wage Determination ASBE0024-006 Virginia Chesterfield Building Construction

PDFwage-determination

DCSR-B34-SOW-Walkway-Light-Repairs

PDFsow

Solicitation SP4703-26-Q-0055 for Walkway Light Repairs

PDFrfq

Wage Determination VA20260007 Modification 1

PDFwage-determination

Solicitation SP4703-26-Q-0055 for Walkway Light Repairs

PDFrfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Amendment 1

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Dcso Richmond Division #1
Contacts2 people available
OfficeRICHMOND, VA, 23237, USA
Organization / Agency
Department Of Defense → Dcso Richmond Division #1
View Agency Profile
Office AddressRICHMOND, VA, 23237, USA
Contacts
Benjamin Maxwell
Robert Moragues Contracting Officer

Full Description

Show more

This solicitation has been amended(SP470326Q0055 - 0001) for the purpose of correcting the specific Wage Determination cited in the solicitation. The wage determination version has changed from Davis-Bacon Act WD #: VA20260007 to Davis-Bacon Act WD #: VA20260017. The solicitation deadline has been extended until COB 07/24/2026 to allow time for offerors to revise and resubmit proposals.



All other terms and conditions remain the same.


___________________________________________________________________________________________________________________________________________


Combined Synopsis/Solicitation for commercial goods and services IAW FAR part 12.


Defense Supply Center Richmond (DSCR) Walkway Light Repairs


This is a solicitation for construction prepared in accordance with the format in FAR Part 36, as supplemented with additional information included in this notice. The solicitation number SP4703-26-Q-0055 is issued as a request for quote (RFQ). The resulting contract will be a firm-fixed price award with a period of performance of 90 days after the Notice to Proceed.


1. OBJECTIVES The primary objective of this project is to enhance safety and visibility along the 400-foot pedestrian walkway located after the turnstile. This will be achieved by installing new LED bollard lights, upgrading existing pole lights to LED, and repairing non-operational light poles.


2. BACKGROUND Pedestrians have reported that the walkway is inadequately lit, creating a safety concern, particularly during the early morning hours. The project addresses these concerns by providing a comprehensive lighting solution. The project site includes a 400-foot walkway, existing decorative light poles, and approximately 100 old concrete bases that are no longer in use. All new lighting will be connected to the existing electrical panel located near the turnstile.


3. SPECIFIC REQUIREMENTS The contractor shall:


• Provide and install new LED bollard lights featuring an 8" round, 42" high design with a black finish, 4000K (Neutral White) color temperature and minimum output of 2000 lumens along the 400-foot walkway. Submit technical specifications, product cut sheets, and up to three samples of the proposed LED bollard fixture for customer review and approval prior to material procurement and installation.


• Install new concrete bases for the bollard lights using Sono tube concrete forms. The concrete bases shall be a minimum of 10 inches in diameter (at least 2 inches wider than the 8-inch bollard fixture) and must extend 2 inches above the finished ground level. The concrete shall have a minimum compressive strength of 3,000 PSI, be poured to a depth extending below the local frost line for stability, feature a smooth trowel finish with chamfered exposed edges, and utilize the manufacturer's exact anchor bolt templates. The contractor must ensure all concrete bases are installed at a consistent level elevation along the path so that all installed bollard lights are level and uniform in height with each other.


• Provide rigid electrical conduit for the cables, ensuring they are stubbed up exactly in the center of each concrete base to properly align with the bollard fixture. An open-trench inspection is required to verify the conduit depth meets requirements prior to backfilling; the contractor must provide a minimum of 2 days' notice to schedule this inspection. Once the inspection is passed and the trenches/holes are filled, the contractor shall tamp the surrounding soil and apply seed and straw.


• Space the new bollard lights every 20 feet, or according to the manufacturer's specifications, to maximize lighting and ensure optimal, consistent illumination. The concrete bases shall be installed with a setback of approximately 12 inches from the edge of the sidewalk to the face of the bollard light or manufacturer recommendation.


• Install a dusk-to-dawn photocell control system to automatically turn the new bollard lights on and off based on ambient light levels.


• Repair the two existing light poles that are currently non-operational. Install new conduit and wires connecting the existing light poles to the junction box located near Building 34. Page 3 of 51


• Replace the bulbs in all existing light poles with new LED bulbs to improve lighting quality. Match the color to sidewalk lights. There's approximately 13 light poles in the area of Building 34.


• Provide all necessary electrical conduit, wiring, and all other components from the new bollard lights to connect them to the existing breaker box located next to the turnstile. Picture is provided at the end of document.


• Provide portable toilets.


This acquisition is set-aside for 100% small businesses.  The North American Industry Classification System (NAICS) Code is 238210. The small business size standard is $19M.


Department of Labor Wage Determination based on location of the service provided (Richmond, VA). Partial proposals will not be accepted.


For an offer to be considered for award, the contractor must own, possess, or otherwise control a bona fide place of business from which mobilization occurs within 125 miles of Defense Supply Center Richmond. A bona fide place of business refers to a location where the offeror regularly maintains an office with at least one full-time employee. The offeror must include the address of this location in its bid.


Award will be made to the lowest priced, technically acceptable (LPTA) offeror that meets the requirements stated in the Statement of Work and the solicitation. Also refer to clauses and provisions included in this notice. Past performance will be considered a part of Technical Acceptability, and the Contracting Officer will pull contractor data from CPARS and SPRS.


The contractor must be registered in the System for Award Management (SAM) prior to award. If not already registered in SAM, go to the SAM website www.sam.gov to register prior to submitting your quote.


Acceptable method of quote or inquiries submission is Email to benjamin.maxwell@dla.mil.


A site visit will be held 24JUN26 @1000. See p.46 of SOW for DSCR map for location of DSCR meeting location and parking location. There is a map at the end of the SOW. You should see buildings 31 and 32 and a a parking lot on the image. Parking is next to building 31 and 32 right off of 6th Street. If the lot is filled, there is parallel parking along H road. Once it hits 1000 we will walk over to the walkway lights needing repair.


In order to attend the site visit interested parties MUST follow the instructions below no less than 5 business days prior to the site visit. This is to allow time for vetting by base security. Plan on arriving at DSCR an hour prior to the site visit time, as the processing time through the visitor center fluctuates. Follow the link below to register through DBIDS, and a QR code should be provided for each visitor. The QR codes MUST be emailed to the Project Manager, Luis A Ramos Martinez . The QR code MUST be emailed to the project manager as soon as possible due to the lengthy vetting process of approximately 5 business days. The project manager will also serve as the sponsor for site visit attendees.


A new system was implemented on 3 January 2023 to screen visitors and contractors for installation access at DSCR. The new system is designed to increase efficiencies, enhance the protection of personal information during the vetting process and eliminate the use of hard copy DLA Form 1815s. The new screening system will require visitors and contractors to pre-enroll in DBIDS (Defense Biometric Identification System). To begin the process, visitors and contractors will complete registration through the pre-enrollment website:


https://dbids-global-enroll.dmdc.mil.


Upon entry of their information, visiting personnel will be provided an electronic form to download, which will have an individualized barcode and alpha numeric code. The codes need to be sent to the visiting person’s sponsor. Once in receipt of the barcode, the sponsor will email Security and Emergency Services and provide the barcode and sponsorship information. Once the visitor/contractor is vetted and approved for installation access, Security & Emergency Services will notify the sponsor that the visitor/contractor can go to the DSCR Visitor Center to obtain his/her pass. At the Visitor Center, the visitor provides the barcode and code provided earlier in the process and completes the credentialing process.


See attached SOW for full requirement details. Parties interested in submitting a quote for this project are advised and expected to have reviewed the entire SOW prior to site visit attendance.


Questions are due on 26JUN26, end of day.


Submit questions via email to benjamin.maxwell@dla.mil.


Quotes are due 15JUL26, end of day.


The point of contact (POC) for this requirement is Benjamin Maxwell (benjamin.maxwell@dla.mil).


Reference Attachment 1 - Statement of Work (SOW) for additional work scope and details.


Period of Performance: 90 days from Notice to Proceed


MAGINITUDE OF CONSTRUCTION 


36.204 Disclosure of the magnitude of construction projects. | Acquisition.GOV


In accordance with FAR Part 36.204(b), the estimated Magnitude of Construction for this contract is between $25,000 and $100,000

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS