This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on July 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Defense Supply Center of Richmond (DSCR) Walkway Light Repairs
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Defense Supply Center Richmond (DSCR) is soliciting proposals for the repair and enhancement of pedestrian lighting along a 400-foot walkway located after the turnstile, as part of a firm-fixed price contract under FAR Part 12 and supplemented with construction specifications from FAR Part 36. The project requires the installation of new LED bollard lights—8 inches in diameter and 42 inches high with a black finish, 4000K color temperature, and minimum 2000 lumens—spaced every 20 feet along the walkway, along with new concrete bases constructed using Sono tube forms that meet specific diameter, strength, and elevation requirements. Existing non-operational light poles will be repaired, and approximately 13 additional poles near Building 34 will have their bulbs replaced with LED equivalents matching the new sidewalk lighting. All new and upgraded fixtures must be connected to the existing electrical panel near the turnstile via rigid conduit, with a dusk-to-dawn photocell control system installed to automate operation. The contractor must also provide portable toilets, comply with MIL-STD-129 for packaging and marking, and adhere to the Buy American Act and Hazard Communication Standard for all materials. The work is governed by the Davis-Bacon Act, with wages determined by WD #: VA20260017, and must be performed by a small business concern certified under NAICS code 238210 with a size standard of $19 million. Only offerors with a bona fide place of business within 125 miles of DSCR are eligible, and all must be registered in SAM prior to award. Proposals are evaluated on a lowest priced, technically acceptable basis, with technical acceptability determined by full compliance with the Statement of Work and past performance verified through CPARS and SPRS. All submissions must include a project narrative, five relevant completed projects from the last five years, and detailed technical documentation including product cut sheets and up to three samples of the proposed bollard lights for review and approval. The solicitation requires specific compliance with U.S. Army Corps of Engineers inspection protocols, a CQC System Manager with authority to halt non-compliant work, and submission of final documentation in two loose-leaf binders within five days of the final inspection. Invoicing will be done monthly via Wide Area Workflow, with payment linked to accepted performance metrics. Site visits are mandatory and require pre-enrollment in DBIDS at least five business days
General Info
Agency
NAICS
Place of Performance
Richmond, VA, 23237, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
This solicitation has been amended(SP470326Q0055 - 0001) for the purpose of correcting the specific Wage Determination cited in the solicitation. The wage determination version has changed from Davis-Bacon Act WD #: VA20260007 to Davis-Bacon Act WD #: VA20260017. The solicitation deadline has been extended until COB 07/24/2026 to allow time for offerors to revise and resubmit proposals.
All other terms and conditions remain the same.
___________________________________________________________________________________________________________________________________________
Combined Synopsis/Solicitation for commercial goods and services IAW FAR part 12.
Defense Supply Center Richmond (DSCR) Walkway Light Repairs
This is a solicitation for construction prepared in accordance with the format in FAR Part 36, as supplemented with additional information included in this notice. The solicitation number SP4703-26-Q-0055 is issued as a request for quote (RFQ). The resulting contract will be a firm-fixed price award with a period of performance of 90 days after the Notice to Proceed.
1. OBJECTIVES The primary objective of this project is to enhance safety and visibility along the 400-foot pedestrian walkway located after the turnstile. This will be achieved by installing new LED bollard lights, upgrading existing pole lights to LED, and repairing non-operational light poles.
2. BACKGROUND Pedestrians have reported that the walkway is inadequately lit, creating a safety concern, particularly during the early morning hours. The project addresses these concerns by providing a comprehensive lighting solution. The project site includes a 400-foot walkway, existing decorative light poles, and approximately 100 old concrete bases that are no longer in use. All new lighting will be connected to the existing electrical panel located near the turnstile.
3. SPECIFIC REQUIREMENTS The contractor shall:
• Provide and install new LED bollard lights featuring an 8" round, 42" high design with a black finish, 4000K (Neutral White) color temperature and minimum output of 2000 lumens along the 400-foot walkway. Submit technical specifications, product cut sheets, and up to three samples of the proposed LED bollard fixture for customer review and approval prior to material procurement and installation.
• Install new concrete bases for the bollard lights using Sono tube concrete forms. The concrete bases shall be a minimum of 10 inches in diameter (at least 2 inches wider than the 8-inch bollard fixture) and must extend 2 inches above the finished ground level. The concrete shall have a minimum compressive strength of 3,000 PSI, be poured to a depth extending below the local frost line for stability, feature a smooth trowel finish with chamfered exposed edges, and utilize the manufacturer's exact anchor bolt templates. The contractor must ensure all concrete bases are installed at a consistent level elevation along the path so that all installed bollard lights are level and uniform in height with each other.
• Provide rigid electrical conduit for the cables, ensuring they are stubbed up exactly in the center of each concrete base to properly align with the bollard fixture. An open-trench inspection is required to verify the conduit depth meets requirements prior to backfilling; the contractor must provide a minimum of 2 days' notice to schedule this inspection. Once the inspection is passed and the trenches/holes are filled, the contractor shall tamp the surrounding soil and apply seed and straw.
• Space the new bollard lights every 20 feet, or according to the manufacturer's specifications, to maximize lighting and ensure optimal, consistent illumination. The concrete bases shall be installed with a setback of approximately 12 inches from the edge of the sidewalk to the face of the bollard light or manufacturer recommendation.
• Install a dusk-to-dawn photocell control system to automatically turn the new bollard lights on and off based on ambient light levels.
• Repair the two existing light poles that are currently non-operational. Install new conduit and wires connecting the existing light poles to the junction box located near Building 34. Page 3 of 51
• Replace the bulbs in all existing light poles with new LED bulbs to improve lighting quality. Match the color to sidewalk lights. There's approximately 13 light poles in the area of Building 34.
• Provide all necessary electrical conduit, wiring, and all other components from the new bollard lights to connect them to the existing breaker box located next to the turnstile. Picture is provided at the end of document.
• Provide portable toilets.
This acquisition is set-aside for 100% small businesses. The North American Industry Classification System (NAICS) Code is 238210. The small business size standard is $19M.
Department of Labor Wage Determination based on location of the service provided (Richmond, VA). Partial proposals will not be accepted.
For an offer to be considered for award, the contractor must own, possess, or otherwise control a bona fide place of business from which mobilization occurs within 125 miles of Defense Supply Center Richmond. A bona fide place of business refers to a location where the offeror regularly maintains an office with at least one full-time employee. The offeror must include the address of this location in its bid.
Award will be made to the lowest priced, technically acceptable (LPTA) offeror that meets the requirements stated in the Statement of Work and the solicitation. Also refer to clauses and provisions included in this notice. Past performance will be considered a part of Technical Acceptability, and the Contracting Officer will pull contractor data from CPARS and SPRS.
The contractor must be registered in the System for Award Management (SAM) prior to award. If not already registered in SAM, go to the SAM website www.sam.gov to register prior to submitting your quote.
Acceptable method of quote or inquiries submission is Email to benjamin.maxwell@dla.mil.
A site visit will be held 24JUN26 @1000. See p.46 of SOW for DSCR map for location of DSCR meeting location and parking location. There is a map at the end of the SOW. You should see buildings 31 and 32 and a a parking lot on the image. Parking is next to building 31 and 32 right off of 6th Street. If the lot is filled, there is parallel parking along H road. Once it hits 1000 we will walk over to the walkway lights needing repair.
In order to attend the site visit interested parties MUST follow the instructions below no less than 5 business days prior to the site visit. This is to allow time for vetting by base security. Plan on arriving at DSCR an hour prior to the site visit time, as the processing time through the visitor center fluctuates. Follow the link below to register through DBIDS, and a QR code should be provided for each visitor. The QR codes MUST be emailed to the Project Manager, Luis A Ramos Martinez . The QR code MUST be emailed to the project manager as soon as possible due to the lengthy vetting process of approximately 5 business days. The project manager will also serve as the sponsor for site visit attendees.
A new system was implemented on 3 January 2023 to screen visitors and contractors for installation access at DSCR. The new system is designed to increase efficiencies, enhance the protection of personal information during the vetting process and eliminate the use of hard copy DLA Form 1815s. The new screening system will require visitors and contractors to pre-enroll in DBIDS (Defense Biometric Identification System). To begin the process, visitors and contractors will complete registration through the pre-enrollment website:
https://dbids-global-enroll.dmdc.mil.
Upon entry of their information, visiting personnel will be provided an electronic form to download, which will have an individualized barcode and alpha numeric code. The codes need to be sent to the visiting person’s sponsor. Once in receipt of the barcode, the sponsor will email Security and Emergency Services and provide the barcode and sponsorship information. Once the visitor/contractor is vetted and approved for installation access, Security & Emergency Services will notify the sponsor that the visitor/contractor can go to the DSCR Visitor Center to obtain his/her pass. At the Visitor Center, the visitor provides the barcode and code provided earlier in the process and completes the credentialing process.
See attached SOW for full requirement details. Parties interested in submitting a quote for this project are advised and expected to have reviewed the entire SOW prior to site visit attendance.
Questions are due on 26JUN26, end of day.
Submit questions via email to benjamin.maxwell@dla.mil.
Quotes are due 15JUL26, end of day.
The point of contact (POC) for this requirement is Benjamin Maxwell (benjamin.maxwell@dla.mil).
Reference Attachment 1 - Statement of Work (SOW) for additional work scope and details.
Period of Performance: 90 days from Notice to Proceed
MAGINITUDE OF CONSTRUCTION
36.204 Disclosure of the magnitude of construction projects. | Acquisition.GOV
In accordance with FAR Part 36.204(b), the estimated Magnitude of Construction for this contract is between $25,000 and $100,000
More opportunities from Department Of Defense → Dcso Richmond Division #1
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS