Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on February 29, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Defense Supply Center Richmond(DSCR), Building 59 E, Implant Office Demolition

Awarded
SP470324Q0021Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
Demolition of Connex Box Structures and Removal of Debris
Solicitation # ACFD 26-03
The Alameda County Fire Department (ACFD) is soliciting sealed bids for solicitation number ACFD 26-03, focused on the demolition of Connex Box Structures and the removal of debris at 890 Lola Street in San Leandro, California. This is a stipulated sum, single-prime contract with a total project duration of 120 calendar days. Bids must be submitted by 2:00 pm on December 10, 2026, at 6363 Clark Ave., Dublin, California. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid amount. Required submission documents include a bid bond or security of 10 percent of the total bid price, a non-collusion declaration, a debarment form, and a designated subcontractors list. The successful contractor must provide 100 percent performance and payment bonds and adhere to California Public Works Contract requirements, including the payment of prevailing wages. Key operational requirements include the submission of a site security and logistics plan addressing tool control and working around inmates, as well as strict adherence to soil dust mitigation and hazardous materials procedures. Project milestones range from the initial kick-off meeting and equipment delivery to final site clearance. The contractor is also required to comply with the Americans with Disability Act and Title VII of the Civil Rights Act of 1964. All work is subject to inspection and potential rejection by the ACFD and the Construction Manager to ensure conformity with technical specifications and industry standards.
AC Fire Department

POSTED

about 8 hours ago

DEADLINE

in about 1 month

General Info

Contract Value

$69,900

NAICS

238910 - Site Preparation Contractors

Place of Performance

0, VA, 23237, USA

Set-Aside

SBA

Award Issued Date

Documents

4

P.2022.00852 59E Demolish Implant SOW REV1

PDF, High priority: read this first40 pages · sow
High

SP4703-24-Q-0021 REV1 - DSCR Building 59E Implant Office Demolition

PDF, High priority: read this first25 pages · rfq
High

Wage Determination VA20240017

PDF, High priority: read this first6 pages · wage-determination
High

SP4703-24-Q-0021 Pre-Award Q&A for Building 59E Demolition

PDF, Low priority1 page · q-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Deadline changed

Response deadline changed from Mar 2, 2024 to Mar 8, 2024.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Dcso Richmond Division #1
Contacts2 people available
OfficeRICHMOND, VA, 23237, USA
Office AddressRICHMOND, VA, 23237, USA
Contacts

Full Description

Show more
Defense Supply Center Richmond(DSCR) Building 59E Implant Office Demolition This is a solicitation for construction prepared in accordance with the format in FAR Part 36, as supplemented with additional information included in this notice. The solicitation number SP4703-24-Q-0021 is issued as a request for quote (RFQ). The resulting contract will be a firm-fixed price award with an expected Period of Performance of 90 days after issuance of the Notice to Proceed (NTP). This acquisition is set-aside for 100% small businesses. The North American Industry Classification System (NAICS) Code is 238910 (Site Preparation Contractors). The small business size standard is $19M. Department of Labor Wage Determination based on location of the service provided (Chesterfield County, VA). Partial proposals will not be accepted. For an offer to be considered for award, the contractor must be within a commutable driving distance to the DSCR facility. A 120-mile radius from DSCR is considered the commutable radius. SPECIFIC REQUIREMENTS -The contractor shall demolish the entire 59E implant office. -Remove all electrical wiring and conduit back to the panels. -Remove all data, cable etc. back to the switch. Will need to coordinate with J6 to access COMM closet. Provide 5 business days notice to access the comm closet. Remove the cable tray to the highest point. -Remove all flooring down to bare concrete. -Fill up to 200LF of cracks in the concrete floor. Grind out the cracks deep and wide. Clean and fill with an approved concrete crack filler per manufacturers recommendations. Prior to filling cracks an inspection is required. Provide 2 business days notice for this inspection. -Remove the expansion joint in the floor completely. Fill the expansion joint with an approved expansion joint sealant per manufacturers recommendations. Prior to filling the expansion joint an inspection is required. Provide 2 business days notice for this inspection. -On the exterior of this implant (but inside the warehouse) there are water lines that went to a hot water heater. The HW heater has been removed but the copper water lines remain. Cap off the old water lines that went to the water heater as high as possible along the North wall. -Remove and cap off the fire sprinkler system. Remove all fire alarm devices. Remove the vertical pipe to the highest level to meet the horizontal pipe. -Demo the concrete around all drains so a plug/cap can be installed on all the drain lines to seal off gases. Place concrete over the plugged/capped a minimum of 4 thick. Bagged concrete may be used. Prior to placing concrete an inspection is required. Provide 2 business days notice for this inspection. -Remove and dispose of all materials, furniture and any other items left in this office. -Remove all equipment mounted to the wall including any associated conduit. Patch all holes left by removing these items. -The concrete floor in the footprint of the implant office needs to match the surrounding area in smoothness. Polish the footprint to a minimum image clarity of level 1 (flat). All glue, adhesives etc. need to be removed. The floor needs to be free of protrusions. - Prime/paint the floor to match the surroundings area using a minimum of two coats. Take a sample of the surrounding floor paint to match. Use a paint with low VOC and that allows vapors to pass through. - Move all lockers or other items on the outside of the office that may be in the way of demolition. - Remove and save the access card reader at the main doors. Provide to PM. - Remove and save all the fire alarm notification appliances. Provide to PM. -Reinstall one of the existing notification appliances on the east wall of the bay, approximately 25 ft. from the north wall of the bay. The appliance should be adjusted to the 110-candela setting. Install and test per NFPA. -All inspections for this project must take place on Tuesdays, Wednesdays, or Thursdays regardless of when notification is provided. -A dumpster can be placed very close to this implant outside the warehouse. -Provide a portable toilet. -Any other items not listed in this SOW shall be considered part of this demolition project. -The specific location of 59E is shown in red on the map at the end of this document. The height of the office is about 12. The height of the warehouse roof is approximately 35. If the contractor would like to look at the top of the office, they need to provide their own correctly sized ladder. No one will be allowed to walk on the office top for pre-bid investigation. Award will be made to the lowest priced, technically acceptable (LPTA) offeror that meets the requirements stated in the Statement of Work and the solicitation. Also refer to clauses and provisions includes in this notice. Past performance will be considered a part of Technical Acceptability, and the Contracting Officer will pull contractor data from CPARS and SPRS. The contractor must be registered in the System for Award Management (SAM) prior to award. If not already registered in SAM, go to the SAM website www.sam.gov to register prior to submitting your quote. All inquiries must be submitted no later than 7 business days prior to closing date. Acceptable method of quote submission is Email to contact@example.gov. Questions are due on February 29, 2024, end of day. Submit questions via email to contact@example.gov. Quotes are due on March 02, 2024, end of day. A site visit will be held at 1030 on February 22, 2024. A map which details the location of the site visit can be found on p.42 of the Statement of Work(SOW). Visitors must contact the Project Manager/Sponsor, Mike OConnor (via email only at contact@example.gov) 72 hours prior to the site visit and confirm plan to attend. Access to Defense Supply Center Richmond is dictated by the language at the following location: https://www.dla.mil/Aviation/Installation/Visitors-and-ID-Office/ The points of contact (POC) for this requirement is Robert - Lee Moragues (contact@example.gov). Reference Attachment 1 - Statement of Work (SOW) for additional work scope, details, and DSCR map. Period of Performance:90 days from NTP **********************************Submission Requirements***************************************************** Instructions: Instructions contained herein are to serve as a guide in preparation of offers for this solicitation and are not intended to be all inclusive. These instructions generally describe the type and extent of information that should be provided in the offer and emphasize several areas that are generally considered significant. The offeror is expected to completely examine and analyze all aspects of the technical areas to be addressed and to include information in its offer that will enable the evaluators to determine the offerors understanding of the requirements. Offers submitted shall be contained in two separate volumes as follows: Volume I - Technical Submission: The Technical Submission should consist of two elements: (1) A description of the vendors understanding of the work to be performed as described in the Statement of Work. The description should demonstrate an understanding of the requirement and include a plan for satisfying the Government's minimum needs. The description should outline the actual work as specifically as possible. (2) Past Performance: The vendor shall document past performance and experience working with projects similar to the one described in the SOW. Documentation shall include relevant contract numbers, a brief description of the scope and magnitude of the work, information pertaining to when the work was completed, and a customer POC with contact information. Past performance and experience should demonstrate relevancy to the solicited projects, and document customer satisfaction and quality level achieved on prior projects. Total Page Limit for Volume I: Five (5) pages. Volume II - Pricing: By way of a fully executed/signed (including Section B) SF 1442, a firm fixed price quotation shall be provided for this requirement. Additional pricing information may be requested and/or provided separately as necessary. The Contractor is responsible for providing adequate documentation to enable a thorough evaluation of the offer and may choose to supplement the lump sum pricing stipulated on the SF 1442 with a formal quote and/or price breakdown on company letterhead, if desired. *****************************************Evaluation Criteria******************************************************** The offer will be evaluated on the basis of the following criteria: Factor 1 - Technical Acceptability In evaluation of this factor, offers will be evaluated to ensure: 1. The Vendor possesses an adequate understanding of the work as well as a process for ensuring quality and timeliness. 2. The Government has an acceptable level of confidence that the vendor can adequately perform the work described in the SOW. Based on the Government's evaluation of the respective vendor's technical submission, each vendor shall be assigned an overall Technical Rating in accordance with the definitions below: Technically Acceptable: Offer meets the requirements of the solicitation and based on the offeror's performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror's performance record is unknown. Technically Unacceptable: Offer does not meet the requirements of the solicitation and/or based on the offeror's performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort. Factor 2- Price Proposed price will be evaluated to determine reasonableness and completeness. The total firm-fixed price will be evaluated. ***************************************Standard DSCR Visitor Information************************ A new system was implemented on 3 January 2023 to screen visitors and contractors for installation access at DSCR. The new system is designed to increase efficiencies, enhance the protection of personal information during the vetting process and eliminate the use of hard copy DLA Form 1815s. The new screening system will require visitors and contractors to pre-enroll in DBIDS (Defense Biometric Identification System). To begin the process, visitors and contractors will complete registration through the preenrollment website: https://dbids-global-enroll.dmdc.mil. Upon entry of their information, visiting personnel will be provided an electronic form to download, which will have an individualized barcode and alpha numeric code. The codes will be electronically sent to the visiting person's sponsor. Once in receipt of the barcode, the sponsor will email Security and Emergency Services and provide the barcode and sponsorship information. Once the visitor/contractor is vetted and approved for installation access, Security & Emergency Services will notify the sponsor that the visitor/contractor can go to the DSCR Visitor Center to obtain his/her pass. At the Visitor Center, the visitor provides the barcode and code provided earlier in the process and completes the credentialing process. Visitors should arrive at the visitor center at least 45 minutes prior to their meeting time to receive visitor badges.

More opportunities from Department Of Defense → Dcso Richmond Division #1

Same awarding agency

NAICS: 236220
New
Federal
DSCR B34 & B42 System Smoke Testing & Hydro Jetting
Solicitation # SP470327Q0003
The Defense Supply Center Richmond (DSCR) is soliciting quotes for a firm-fixed-price contract to perform smoke testing, hydro jetting, and comprehensive evaluations of the Drain, Waste, and Vent (DWV) systems in Buildings 34 and 42. The primary objective is to identify defects, leaks, and obstructions causing sewer odors, though no repairs are authorized under this scope. Key deliverables include the hydro jetting of accessible sanitary drain systems, CCTV inspections with footage provided on a USB drive, and a detailed written report outlining findings and recommended corrective actions. The estimated magnitude of construction is between $25,000 and $100,000, with a period of performance of 60 days from the Notice to Proceed. This acquisition is a 100% small business set-aside under NAICS code 236220. Award will be made to the lowest priced, technically acceptable (LPTA) offeror. To be considered, prime contractors must be located within a 120-mile commutable radius of the DSCR facility and demonstrate at least three years of experience with commercial DWV systems, including five relevant projects completed within the last five years. Required submission documents include a project narrative with a timeline of definable features of work and a list of previous relevant experience. The contract includes strict administrative and safety requirements, including the use of the US Army Corps of Engineers three-phase inspection process and adherence to USACE EM 385-1-1 safety standards. Contractors must provide performance and payment bonds within five days of award and maintain an onsite Quality Control System Manager during all work. Payment is managed via Wide Area Workflow (WAWF), with a cap of 80% of the total contract value payable until the final inspection is accepted. Liquidated damages for delays are set at $500 per calendar day. Access to the facility requires pre-enrollment in the Defense Biometric Identification System (DBIDS).
Commercial and Institutional Building Construction

POSTED

about 12 hours ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS