Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Delta Shores Project

Forecast
DR26-139State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Delta Shores Project involves the development of 27 single-family dwellings on designated lots within the Delta Shores West Subdivision Map (P06-197) in Sacramento, California, under the Single-Unit Dwelling Zone (R-1-PUD) of the Delta Shores Planned Unit Development area. The project is administered by the City of Sacramento’s Community Development Department, Planning Division, with the lead agency responsible for environmental review and permitting under the California Environmental Quality Act (CEQA). The development is part of a larger master-planned community spanning approximately 782 acres, but this specific phase focuses on the construction of the 27 homes along with associated site improvements including landscaping, lighting, ADA-compliant parking, and sewer infrastructure installed via microtunneling under Morrison Creek. Regulatory compliance is governed by local zoning codes, Delta Shores PUD design guidelines, Title 23 standards for flood control, and CEQA requirements, which necessitate either an Environmental Impact Report or a Mitigated Negative Declaration, along with a Mitigation Monitoring Plan and Notice of Determination. The project’s place of performance is specifically located at 2850 Gateway Oaks Drive in Sacramento, and all approvals must be secured from municipal authorities including the Planning Commission and City Council. The procurement process described does not follow federal acquisition regulations; there are no Federal Acquisition Regulation (FAR) clauses, contract types such as FFP or IDIQ, or line-item pricing details as would be found in a federal contract. Instead, this is a land use entitlement and development approval process with administrative fees recorded for filings such as environmental reviews and recording documents. Payment is handled locally through the City of Sacramento or Sacramento County offices, with accepted methods including cash, check, and credit, though no formal invoicing systems like WAWF or IPP are referenced. Key contacts include Charles Tschudin, Senior Planner, as the primary point of contact, and Kevin Wilson of Meritage Homes as the project manager, while Rochelle Hall serves as a point of contact for the lead agency. Although referenced documents include Notices of Exemption, CDFW No Effect Determinations, and previous fee receipts, these are part of the CEQA compliance package and not technical specifications or contractual deliverables. There are no federal representations, certifications, or socioeconomic disclosures required, and no formal period of performance or delivery schedule is defined, with key dates tied to approval milestones rather than contract execution timelines. The project is currently in the permitting and environmental review phase, with

General Info

27 single-family homes approved in Sacramento under CEQA, with site improvements and local permitting required.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
This project consists of a request for Site Plan and Design Review to add two additional models to Village 5 and remove model 2538 previously approved under DR24- I 54 for 229 single-unit dwellings within the Single-Unit Dwelling Zone (R-1-PUD) in the Delta Shores Planned Unit Development and Design Review Area. On June l 0, 2025, the City of Sacramento Community Development Department approved the Delta Shores East Village 3, 4, & 5 Project (DR24-154) for Site Plan and Design Review to construct 229 single-unit dwellings on individual lots of varying sizes consistent with FPM23-001 l, -00 l 9 & -0020, originally approved under P06-097. These parcels are all within the Single-Unit Dwelling Zone (R-1-PUD) and General Plan Designation of Traditional Neighborhood Low Density (Low Density Residential within the Delta Shores PUD). The proposed dwellings meet height. setback. and lot coverage requirements for the R-1 zone and Delta Shores PUD. On January 13, 2009, the Sacramento City Council certified an Environmental Impact Report and adopted the Findings of Fact and a Mitigation Monitoring Program for the Delta Shores (P06- l 97) project.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 17 days
View Details

More opportunities from California → City of Sacramento

Same awarding agency

NAICS: 541620
SLED
Two Rivers Trail Phase II Project (K15125000)
Solicitation # SAC-18909-R2
The California Department of Fish and Wildlife has executed Amendment #2 to the Streambed Alteration Agreement EPIMS Notification Number SAC-18909-R2 for the Two Rivers Trail Phase II project. Located along the south bank of the American River in Sacramento, California, the project area extends from Sutter's Landing Park to the H Street Bridge. This amendment specifically modifies the compensatory measures required under Measure 3.1 due to restoration difficulties encountered by the Permittee, the City of Sacramento. While 0.24 acres of riparian habitat were originally required, only 0.07 acres have been successfully restored. To address the remaining 0.17-acre shortfall, the amendment allows the Permittee to purchase suitable mitigation credits from a CDFW-approved mitigation bank. The City of Sacramento serves as the Lead Agency for this project, with Adam Randolph acting as the primary point of contact. The California Department of Fish and Wildlife, acting as the Responsible Agency, has determined through a Notice of Determination that the project will not have a significant environmental effect within its jurisdiction. This amendment ensures compliance with California environmental regulations and the Fish and Game Code by providing an alternative pathway for habitat mitigation. The project is identified by Assessor's Parcel Number 001-0160-005-0000 and is situated at coordinates Latitude 38.589442, Longitude -121.451397.
Environmental Consulting Services

POSTED

11 days ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS