Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Tangerine Avenue at Elder Creek Bridge Scour Repair Project (R15222210)

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

Tangerine Avenue, Mack Road, Sacramento, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Sacramento
Contacts2 people available
OfficeN/A

Full Description

Show more
The project consists of repairs to Tangerine Avenue Bridge [Bridge #24C0293] substructure and channel protection measures. The improvements consist of addressing scour and related issues as summarized below: • Pump grout under the Abutment 1 footing to re-establish bearing along its entire length and width. • Remove existing Rock Slope Protection from the Abutment 1 and Abutment 4 end slopes. • Install concrete lined slope protection between the low flow channel and Abutment 1. • Install the same concrete lined slope as Abutment 1 at Abutment 4 • In-kind replacement of the failing concrete-lined low-flow channel The project will comply with the City's existing Routine Maintenance Agreement (RMA) of Stream Channels (Streambed Alteration Agreement No. 1600-2017-0044- R2). The agreement is limited to maintenance of stream channels within the City of Sacramento. Activities may include debris and obstruction removal, silt, sand or sediment removal, vegetation control (including hand cutting, mowing, chain sawing, discing or bulldozing), non-native vegetation removal, repair of previous erosion control work or new minor erosion control work, bridge washing and painting and trash removal. A MitigatedNegative Declaration was adopted for the Routine Maintenance of Stream Channels project (State Clearinghouse #2017012041 ).

More opportunities from California → City of Sacramento

Same awarding agency

NAICS: 541620
SLED
Two Rivers Trail Phase II Project (K15125000)
Solicitation # SAC-18909-R2
The California Department of Fish and Wildlife has executed Amendment #2 to the Streambed Alteration Agreement EPIMS Notification Number SAC-18909-R2 for the Two Rivers Trail Phase II project. Located along the south bank of the American River in Sacramento, California, the project area extends from Sutter's Landing Park to the H Street Bridge. This amendment specifically modifies the compensatory measures required under Measure 3.1 due to restoration difficulties encountered by the Permittee, the City of Sacramento. While 0.24 acres of riparian habitat were originally required, only 0.07 acres have been successfully restored. To address the remaining 0.17-acre shortfall, the amendment allows the Permittee to purchase suitable mitigation credits from a CDFW-approved mitigation bank. The City of Sacramento serves as the Lead Agency for this project, with Adam Randolph acting as the primary point of contact. The California Department of Fish and Wildlife, acting as the Responsible Agency, has determined through a Notice of Determination that the project will not have a significant environmental effect within its jurisdiction. This amendment ensures compliance with California environmental regulations and the Fish and Game Code by providing an alternative pathway for habitat mitigation. The project is identified by Assessor's Parcel Number 001-0160-005-0000 and is situated at coordinates Latitude 38.589442, Longitude -121.451397.
Environmental Consulting Services

POSTED

11 days ago

DEADLINE

N/A
View Details
NAICS: 237110
SLED
Delta Shores Project
Solicitation # DR26-139
The Delta Shores Project involves the development of 27 single-family dwellings on designated lots within the Delta Shores West Subdivision Map (P06-197) in Sacramento, California, under the Single-Unit Dwelling Zone (R-1-PUD) of the Delta Shores Planned Unit Development area. The project is administered by the City of Sacramento’s Community Development Department, Planning Division, with the lead agency responsible for environmental review and permitting under the California Environmental Quality Act (CEQA). The development is part of a larger master-planned community spanning approximately 782 acres, but this specific phase focuses on the construction of the 27 homes along with associated site improvements including landscaping, lighting, ADA-compliant parking, and sewer infrastructure installed via microtunneling under Morrison Creek. Regulatory compliance is governed by local zoning codes, Delta Shores PUD design guidelines, Title 23 standards for flood control, and CEQA requirements, which necessitate either an Environmental Impact Report or a Mitigated Negative Declaration, along with a Mitigation Monitoring Plan and Notice of Determination. The project’s place of performance is specifically located at 2850 Gateway Oaks Drive in Sacramento, and all approvals must be secured from municipal authorities including the Planning Commission and City Council. The procurement process described does not follow federal acquisition regulations; there are no Federal Acquisition Regulation (FAR) clauses, contract types such as FFP or IDIQ, or line-item pricing details as would be found in a federal contract. Instead, this is a land use entitlement and development approval process with administrative fees recorded for filings such as environmental reviews and recording documents. Payment is handled locally through the City of Sacramento or Sacramento County offices, with accepted methods including cash, check, and credit, though no formal invoicing systems like WAWF or IPP are referenced. Key contacts include Charles Tschudin, Senior Planner, as the primary point of contact, and Kevin Wilson of Meritage Homes as the project manager, while Rochelle Hall serves as a point of contact for the lead agency. Although referenced documents include Notices of Exemption, CDFW No Effect Determinations, and previous fee receipts, these are part of the CEQA compliance package and not technical specifications or contractual deliverables. There are no federal representations, certifications, or socioeconomic disclosures required, and no formal period of performance or delivery schedule is defined, with key dates tied to approval milestones rather than contract execution timelines. The project is currently in the permitting and environmental review phase, with
Water and Sewer Line and Related Structures Construction

POSTED

about 2 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS