Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from New York was posted on May 19, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Demo 55 Washington St. Waterloo

Closed
2122598State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a Total Small Business Set-Aside for the interior modernization of Building 262 and associated structures 261 and 263 at the Federal Law Enforcement Training Center in Glynco, Georgia. This firm-fixed-price contract encompasses a comprehensive scope of work including the replacement of corridor and classroom flooring with composite modular materials, full restroom renovations involving new vanities and lavatories, and the installation of raised flooring with integrated electrical distribution for classrooms. Additional technical requirements include updating doors and life-safety components, repainting interior surfaces, replacing variable air volume systems, upgrading lighting controls, and correcting plumbing deficiencies. The project has a performance period from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the Notice to Proceed. Proposals are evaluated based on three equally important factors: Past Performance, Corporate Relevant Experience, and Price. Awardees must provide payment and performance bonds equal to 100 percent of the contract price. Due to the nature of the facility, contractors must adhere to strict security protocols, including background checks, non-disclosure agreements, and vehicle registration. All work must comply with ADA accessibility guidelines and prevailing wage rates as specified in the Georgia construction wage determinations.
Bristol Alliance of Companies

POSTED

43 minutes ago

DEADLINE

in 11 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Critical system upgrades encompass HVAC, exhaust extraction, compressed air, and a full NFPA-compliant fire suppression system, alongside updated electrical distribution, lighting, low-voltage systems, and building automation controls. Site improvements involve paving removal and replacement, drainage upgrades, and repairs to water, sanitary, and storm systems, as well as hazardous materials abatement. The project has an estimated value between 10 million and 25 million dollars with a performance period of 730 days after award. Award will be based on the lowest price for two primary exhibit line items: building renovation and paving work. Proposals are due by November 23, 2026. Depending on the proposal value, bonding requirements range from a payment bond for projects over 35 thousand dollars to a combination of bid, payment, and performance bonds for projects exceeding 150 thousand dollars. The contract is subject to the Davis-Bacon Act, Buy American requirements, and ADA accessibility guidelines. Invoicing must be processed through Wide Area Work Flow using NAVFAC Form 7300/30 and requires certification by a Quality Control Manager.
Bristol Alliance of Companies

POSTED

43 minutes ago

DEADLINE

in 16 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is seeking pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and an underground stormwater retention system. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

43 minutes ago

DEADLINE

in 22 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project aims to restore the first, second, and third floors to their original condition following a fire sprinkler discharge. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. Award will be based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Prospective bidders must attend a mandatory pre-bid site visit and submit a detailed cost breakdown for labor, materials, and equipment, along with a 90-day bid guarantee and proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act, requiring compliance with specific minimum wage determinations and paid sick leave mandates. All work must adhere to OSHA, EPA, ADA, and NFPA-101 life safety codes, with the contractor required to maintain specific automobile liability insurance naming Adams and Associates, Inc. as an additional insured.
Grafton Job Corps

POSTED

43 minutes ago

DEADLINE

in 9 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to return sixteen residential rooms, bathrooms, and common areas to safe residential use. The scope of work includes drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in mechanical rooms, as well as the temporary disconnection and re-installation of HVAC equipment such as furnaces and water heaters. The contractor is responsible for all labor, materials, equipment, and supervision, and must provide a minimum one-year workmanship warranty upon final acceptance by CSD. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Proposing contractors must provide itemized pricing by room and trade, evidence of relevant experience, and a detailed work plan addressing project phasing and occupied-building protection. Additionally, the selected contractor must maintain general liability insurance of 1 million dollars per occurrence and 3 million dollars general aggregate, and must provide full payment and performance bonding within ten days of the project award.
Career Systems Development Corporation

POSTED

43 minutes ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The contract involves the demolition of a structure located at 55 Washington Street, Waterloo, NY, with a focus on ensuring compliance with all relevant regulations and safety standards. The building has been inspected for asbestos, and it was determined that asbestos-containing materials above 1% are not present, allowing bidders to proceed accordingly. The scope includes demolishing all structures, foundations, driveways, and utilities, with the work to be completed by the end of July 2025, either consecutively or concurrently across multiple properties if applicable. The contractor must secure all necessary permits, coordinate utility disconnections, and adhere to federal, state, and local laws, including stormwater regulations and soil management plans. Site work involves removing all construction debris, hazardous waste, and contents, then properly disposing of materials at lawful facilities, with detailed documentation provided to the Land Bank. Post-demolition, the contractor is responsible for backfilling foundations with approved materials, including engineered or granular fill, and ensuring proper compaction and inspection. Final grading must eliminate standing water and drainage issues, followed by applying a minimum of six inches of clean topsoil and hydroseeding to promote grass growth and prevent erosion. The project emphasizes careful handling of sidewalks and other adjacent features, requiring repair if damaged, and mandates a final inspection by the Land Bank’s engineer. The contract also specifies subcontracting goals for minority and women-owned businesses, with a response deadline of June 10, 2025, and a project duration of approximately one month.

Documents

4
PDF, High priority: read this firstrfp
High
PDF, High priority: read this firstcontract-document
High
PDF, High priority: read this firstspecifications
High
PDF, Low priorityenvironmental-compliance-checklist
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew York → Finger Lakes Regional Land Bank Corporation
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Joe McGrathCEO/President

Full Description

Show more
The structure slated for demolition was found to not consist of asbestos containing materials above 1% in Pre-Demolition Asbestos Inspection Report Dated June 26th, 2024. Bids should be made accordingly. Please review the asbestos survey and required soil management plan attached to this RFP prior to bidding.BID DUE June 10th, 2025 at 3:00 PM   Scope of Work: In response to this bid solicitation, please bid a price that covers the demolition of the addresses listed herein, for all labor, materials, equipment, supplies, and incidentals necessary and required to complete the work of outlined below. Demolition projects must be undertaken consecutively or concurrently with one another, if there is more than one property listed on this RFP. Demolition project(s) must be completed before the end of July, 2025. The Contractor will provide the Land Bank with at least forty-eight (48) hours’ notice prior to the commencing the work at each property. The contractor shall obtain, at its sole cost and expense, all permits, authorizations, approvals, and licenses necessary for the planning, performance, and completion of the Work in accordance with the requirements of the respective municipal agencies and other authorities having jurisdiction. The Contractor shall comply with all federal, state, county, city, town and other applicable laws, ordinances, rules, and regulations and all orders and rules of any duly constituted authorities affecting the Property or bearing on the performance of the work. This includes, but is not limited to 12 NYCRR Part 56-11.5 and all applicable Stormwater regulations. Contractor is required to follow the HCR-approved Soils Management Plan during all site activities related to demolition. The Contractor will contact Dig Safely NY at least forty-eight (48) hours prior to beginning any excavation at the Property. The Contractor will confirm that all utilities are disconnected before commencing any Work. Disconnections were ordered through NYSEG on June 20th, 2024 and each property was issued job numbers. The Contractor will demolish all buildings, structures, and driveways on, in, or upon the Property. The Contractor will provide the Land Bank with all bills of lading and dump tickets, for all hazardous and non-hazardous waste. The Contractor will completely remove all the construction materials and any contents of the demolished structures from the Property. The Contractor will arrange for transportation of the construction materials and any contents of the demolished structures to lawful disposal, storage, or recycling locations, as necessary. The Contractor will fill the foundation pit with appropriate materials. The foundation pit shall not be filled with debris. Any proposed fill must be approved in advance by the Land Bank’s Engineer. Fill cannot include organic materials that will decompose and settle. Fill cannot include construction debris other than crushed concrete or crushed stone. Foundation walls must be completely removed. All basement floors and/or slabs must be completely removed All utilities, including water, sewer, and natural gas must be removed to interconnection point and capped and end of pipe staked. Place fill in basements and other voids within the Contract Line Limit. Where broken concrete and masonry materials are used for backfill, place fill in layers not exceeding 9 inches and compact each layer. Crushed concrete and masonry may not be used as fill material outside the limits defined by the original building foundation walls. Final 12 inches of backfill below topsoil elevations must be select fill. Backfill below the final 12 inches with Engineered or Granular Fill. ENGINEERED FILL: NYSDOT ITEM 304.12, AS NOTED IN THE PROJECT GEOTECHNICAL EVALUATION REPORT. PLACE IN 6 TO 9 LIFTS. COMPACT EACH LIFT TO AT LEAST 95% MAXIMUM DENSITY AS DETERMINED BY THE MODIFIED PROCTOR METHOD, WITH A MOISTURE CONTENT WITHIN TWO PERCENT OF OPTIMUM. PROVIDE BENEATH FOOTINGS AS REQUIRED, AS BACKFILL AGAINST FOUNDATION WALLS, AND BENEATH FLOOR SLAB AND SUBBASE MATERIAL Select Fill: Sound, durable, sand, gravel, stone, or blends of these materials, free from organic and other deleterious materials. Sieve Percent Passing 4 Inch 100 No. 40 0-70 No. 200 0-15   The Contractor must contact the Land Bank’s Engineer for inspection of both the fill and foundation pit prior to backfill. A third-party compaction inspection with written reports is required and will be hired by the FLRLBC The Contractor will finish grading the land on the Property so that there is no standing water on the property or adverse drainage impacts to adjacent property. The Contractor will add sufficient topsoil and will ensure that the property is free from rocks and other items that would prevent grass growth. The Contractor must ensure that there is a minimum of 6” of clean and screened topsoil free of any stones large enough to impede grass growth, or that might damage or be thrown by a lawnmower covering the whole site. The Contractor will apply hydroseeding in a mix appropriate for local condition that would grow grass and prevent erosion. Hydroseeding shall be applied at a minimum rate of 5 pounds per 100 square feet. The driveway must be removed of all blacktop and gravel to support grass growth. Grading/seeding must be completed within 30 days of pulling the demolition permit unless impossible due to inclement weather. The Contractor will exercise caution so as to not damage any pedestrian sidewalk if present. If a sidewalk is damaged, the Contractor must repair or replace the damaged portion in a timely manner and prior to the Completion Date. The Contractor will provide before and after time/date stamped photos of sidewalk and property. The Contractor must contact the Land Bank’s Engineer for a Final Inspection. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 10% Women Owned Sub-Contracting Goal: 10% Due date:06/10/2025 3:00 PM Contract term: 1 month County(ies): Seneca Location: 55 Washington Street, Waterloo, NY 13165 Business entities awarded an identical or substantially similar procurement contract within the past five years: NA

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS