This Combined Synopsis/Solicitation opportunity from Department Of Transportation was posted on June 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Demolition, Remediation and Restoration
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The U.S. Department of Transportation’s John A. Volpe National Transportation Systems Center is supporting the Federal Aviation Administration’s Facilities Environmental Cleanup Program by contracting for remedial action at three contaminated sites within the FAA Eastern Service Area: Birmingham, AL; New Cumberland, PA; and Chantilly, VA. The work involves the removal, disposal, and site restoration of soil contaminated with lead and total petroleum hydrocarbons (TPH), with contamination levels exceeding FAA, EPA, or state regulatory thresholds. The contractor is responsible for developing and submitting a comprehensive Remediation and Restoration Work Plan within ten business days of the project kick-off, followed by a final version within five business days after government feedback. This plan must detail the technical approach for soil remediation and disposal, including full identification of all disposal facilities, required permits, and documentation for waste characterization and shipping. The contractor is also required to submit a Site Safety and Health Plan and a Risk Management Plan addressing hazards and mitigation strategies. While the government will conduct all confirmatory sampling, the contractor assumes full responsibility for disposal sampling, paperwork, and ensuring that no contaminated soil or equipment remains on-site overnight without prior authorization. All work must comply with federal, state, and local environmental and safety regulations, adhering to the most stringent standard where conflicts arise, and must be performed under a Firm-Fixed Price contract structure with all CLINs fully funded at award. The contract is structured as a Total Small Business Set-Aside under NAICS code 238910 and is subject to multiple FAR clauses including requirements for ethical conduct, whistleblower rights, identity verification, and prohibitions on subcontracting with debarred entities. The contractor must comply with the Service Contract Act and adhere to specific wage determinations for each site. Personnel must hold a Department of Transportation Personal Identity Verification badge for access, and site security is maintained via FAA-controlled locks. Invoicing must be submitted electronically through DOT’s DELPHI system, with detailed breakdowns for labor, equipment, disposal, permits, and travel expenses supported by receipts. The period of performance runs from June 24, 2026, to September 15, 2026, with work expected to be completed as soon as possible. The offeror must provide a detailed cost buildup for labor, overhead, and all anticipated expenses, and must affirm compliance with federal anti-discrimination laws and the principles of the Equal Protection Clause, while explicitly certifying that no diversity, equity, and inclusion initiatives violate Supreme Court precedent. Prop
General Info
Agency
Contract Value
$75,087NAICS
Place of Performance
Chantilly, VA, USASet-Aside
Awardee
Award Issued Date
Timeline
Submission Closed
Organization & Contact Information
Full Description
Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at three facilities in the FAA Eastern Service Area (ESA) to remove identified soil contamination. The sites requiring remediation for lead- and total petroleum hydrocarbon (TPH) -contaminated soils are listed below:
- BHM ASR – Birmingham, AL (33.57378°, -86.75671°)
- CXY LOM – New Cumberland, PA (40.178196°, -77.005692°)
- IADN NASEB – Chantilly, VA (38.958736°, -77.43499°)
The FAA's ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facilities above based on prior research, known historic operations and practices, and required cleanup actions or previously identified sites.The Contractor shall conduct all work in accordance with Federal, State and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirement. The Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below.
This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. Please note that the GFI Site Survey Report provided for the CXY site is for demolition activities. This document is provided because it contains soil sampling results for this site. There will be NO demolition or asbestos abatement required as part of this project. The removal quantities and depths in the Preliminary Assessment and/or Site Investigation and Site Survey reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2.
The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for all sites including the identification of all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. The government will perform ALL confirmatory sampling required at the sites. Additionally, the work plan shall also identify any required permits needed to perform the work.
Additional components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks.
An outline summarizing the required content of the work plan is shown below:
- Technical Approach
- Method and procedures for soil remediation, removal, disposal (all as required above in section 1.1), and restoration
- Identification of required work permits
- Site Safety Health Plan (SSHP)
- Risk Management Plan
- Identification of major risks
- Risk mitigation plan
The contractor should expect a 5-business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments.
Preliminary Assessment/Site Investigation (PA/SI), Site Investigation (SI) and Site Survey activities completed in 2024 found the below sites showing contamination above either FAA action levels or EPA/State regulatory limits. Examples include lead-in-soil concentrations above the FAA’s cleanup standard of 200 mg/kg (ppm) or the applicable state standard, or TPHs in soil above EPA or State regulatory limits. For each site, prior to mobilizing to the site for the remedial activities, waste characterization samples shall be collected. Once these samples are analyzed, the proper landfill and disposal approvals shall be obtained. For each site, contaminated soil and/or equipment shall not be left at the site overnight unless previous permission is obtained by the contractor. Any equipment or material left at the site must be secured by the contractor and is not the responsibility of the government.
Adidtional details for requirement are found in the SOW.
More opportunities from Department Of Transportation → 6913G6 Volpe National Transportation System Cntr
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS