Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Transportation was posted on June 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Demolition, Remediation and Restoration

Awarded
6913G626Q300035Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
26-037-CIP
Solicitation # 26-037-CIP
The SportsOhio PowerPlay Demolition project, identified as solicitation 26-037-CIP, is a City of Dublin, Ohio, contract for the demolition and restoration of specific areas at 6314 Cosgray Road. The scope of work includes the removal of the Can-Am/go cart track, batting cages, a concrete seating pad, associated walkway connections, and a mini golf course. The project has an engineer's estimate of $259,606.50 and must be completed by April 30, 2027. Key technical requirements include adhering to the 2026 City of Dublin and City of Columbus Construction and Material Specifications, following National Electric and Safety Codes, and ensuring tree clearing occurs specifically between October 1 and March 31. Bids are submitted via Bid Express and are evaluated based on a lowest and best analysis, with a strong preference for Ohio-based bidders or those from reciprocal border states. Qualified bidders must provide a bid guaranty per the Ohio Revised Code, evidence of similar experience, and a noncollusion affidavit. The contract mandates the payment of prevailing wages and requires the use of domestic source end products. Payment is structured monthly at a rate of 95% until the work is 50% complete, after which the retention amount may be reduced at the City's discretion. All inspections are managed by the City of Dublin, though the contractor must coordinate utility abandonment inspections with AEP, Columbia Gas, and other communications companies.
City of Dublin, OH - Engineering

POSTED

about 11 hours ago

DEADLINE

in 15 days
NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 14 hours ago

DEADLINE

in 6 days
NAICS: 238910
New
Federal
Y--Hickman Wildlife Water Catchment and Pipe Fence
Solicitation # 140L1726Q0054
Solicitation 140L1726Q0054 is a Total Small Business Set-Aside request for quote issued by the Department of the Interior, Bureau of Land Management, for the Hickman Wildlife Water Catchment and Pipe Fence project in Socorro County, New Mexico. The project is a firm-fixed-price contract involving the demolition and removal of existing infrastructure and the construction of a 1,000 square-foot metal catchment consisting of two 20 by 25 foot structures with galvanized gutters and propanel tops. Additionally, the contractor is required to install two BOSS tanks and erect 1,000 linear feet of pipe-and-cable fencing. The updated period of performance is scheduled from November 17, 2026, to January 25, 2027. Award will be based on the most advantageous offer, with price serving as the primary factor, followed by technical approach, nongovernmental experience, and a detailed work breakdown schedule illustrating the critical path. Contractors must adhere to Davis-Bacon wage determinations for Socorro County and comply with OSHA, EPA, and ADA regulations. Key submission requirements include a signed SF 1442, a price schedule, and a payment bond or irrevocable letter of credit due within 10 days of award. The final deadline for proposal submission is November 9, 2026, at 3:00 PM ET, with a site visit scheduled for October 29, 2026, at the Socorro Field Office.
New Mexico State Office

POSTED

about 18 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The U.S. Department of Transportation’s John A. Volpe National Transportation Systems Center is supporting the Federal Aviation Administration’s Facilities Environmental Cleanup Program by contracting for remedial action at three contaminated sites within the FAA Eastern Service Area: Birmingham, AL; New Cumberland, PA; and Chantilly, VA. The work involves the removal, disposal, and site restoration of soil contaminated with lead and total petroleum hydrocarbons (TPH), with contamination levels exceeding FAA, EPA, or state regulatory thresholds. The contractor is responsible for developing and submitting a comprehensive Remediation and Restoration Work Plan within ten business days of the project kick-off, followed by a final version within five business days after government feedback. This plan must detail the technical approach for soil remediation and disposal, including full identification of all disposal facilities, required permits, and documentation for waste characterization and shipping. The contractor is also required to submit a Site Safety and Health Plan and a Risk Management Plan addressing hazards and mitigation strategies. While the government will conduct all confirmatory sampling, the contractor assumes full responsibility for disposal sampling, paperwork, and ensuring that no contaminated soil or equipment remains on-site overnight without prior authorization. All work must comply with federal, state, and local environmental and safety regulations, adhering to the most stringent standard where conflicts arise, and must be performed under a Firm-Fixed Price contract structure with all CLINs fully funded at award. The contract is structured as a Total Small Business Set-Aside under NAICS code 238910 and is subject to multiple FAR clauses including requirements for ethical conduct, whistleblower rights, identity verification, and prohibitions on subcontracting with debarred entities. The contractor must comply with the Service Contract Act and adhere to specific wage determinations for each site. Personnel must hold a Department of Transportation Personal Identity Verification badge for access, and site security is maintained via FAA-controlled locks. Invoicing must be submitted electronically through DOT’s DELPHI system, with detailed breakdowns for labor, equipment, disposal, permits, and travel expenses supported by receipts. The period of performance runs from June 24, 2026, to September 15, 2026, with work expected to be completed as soon as possible. The offeror must provide a detailed cost buildup for labor, overhead, and all anticipated expenses, and must affirm compliance with federal anti-discrimination laws and the principles of the Equal Protection Clause, while explicitly certifying that no diversity, equity, and inclusion initiatives violate Supreme Court precedent. Prop

General Info

Volpe Center to remediate lead and petroleum-contaminated soils at three FAA locations.

Contract Value

$75,087

NAICS

238910 - Site Preparation Contractors

Place of Performance

Chantilly, VA, USA

Set-Aside

SBA

Award Issued Date

Documents

12

Attachment XI Instructions to Offerors for Solicitation 6913G626Q300035

PDF, High priority: read this firstinstructions
High

Attachment XI Pricing Schedule for Removal and Restoration Activities

PDF, High priority: read this firstpricing-schedule
High

BHM ASR Environmental Site Investigation Report Final Oct 2024

PDF, High priority: read this firstsite-investigation-report
High

Clarification Questions and Responses for Requirement 6913G626Q300035

PDF, High priority: read this firstclarification-questions
High

IAD NASEB PA/SI Trip Report November 2024

PDF, High priority: read this firstsite-investigation-report
High

RFQ 6913G626Q300035 FAA Environmental Cleanup Support

PDF, High priority: read this firstrfq
High

Solicitation 6913G626Q300035 Remediation and Restoration Activities SOW

PDF, High priority: read this firstsow
High

Technical Support Services Contract Site Survey Report - CXY LOM New Cumberland PA

PDF, High priority: read this firstsite-survey-report
High

Wage Determination 2015-4281 Revision 37

PDF, High priority: read this firstwage-determination
High

Wage Determination No. 2015-4225 Revision 34 for Pennsylvania

PDF, High priority: read this firstwage-determination
High

Wage Determination No. 2015-4591 Revision 32 for Alabama Service Contract Act

PDF, High priority: read this firstwage-determination
High

Remediation and Restoration Contract Table of Contents

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Deadline changed

Response deadline changed from Jun 24, 2026 to Jun 25, 2026.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6913G6 Volpe National Transportation System Cntr
Contacts1 person available
OfficeCAMBRIDGE, MA, 02142, USA
Office AddressCAMBRIDGE, MA, 02142, USA
Contacts

Full Description

Show more

Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at three facilities in the FAA Eastern Service Area (ESA) to remove identified soil contamination. The sites requiring remediation for lead- and total petroleum hydrocarbon (TPH) -contaminated soils are listed below:


  1. BHM ASR – Birmingham, AL (33.57378°, -86.75671°)
  2. CXY LOM – New Cumberland, PA (40.178196°, -77.005692°)
  3. IADN NASEB – Chantilly, VA (38.958736°, -77.43499°)


The FAA's ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facilities above based on prior research, known historic operations and practices, and required cleanup actions or previously identified sites.The Contractor shall conduct all work in accordance with Federal, State and local requirements.  Where inconsistencies exist, the Contractor shall follow the most stringent requirement. The Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below.


This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. Please note that the GFI Site Survey Report provided for the CXY site is for demolition activities. This document is provided because it contains soil sampling results for this site. There will be NO demolition or asbestos abatement required as part of this project. The removal quantities and depths in the Preliminary Assessment and/or Site Investigation and Site Survey reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2.


The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for all sites including the identification of all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. The government will perform ALL confirmatory sampling required at the sites. Additionally, the work plan shall also identify any required permits needed to perform the work.


Additional components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks.


An outline summarizing the required content of the work plan is shown below:


  1. Technical Approach
    1. Method and procedures for soil remediation, removal, disposal (all as required above in section 1.1), and restoration
    2. Identification of required work permits
  2. Site Safety Health Plan (SSHP)
  3. Risk Management Plan
    1. Identification of major risks
    2. Risk mitigation plan

The contractor should expect a 5-business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments.


Preliminary Assessment/Site Investigation (PA/SI), Site Investigation (SI) and Site Survey activities completed in 2024 found the below sites showing contamination above either FAA action levels or EPA/State regulatory limits. Examples include lead-in-soil concentrations above the FAA’s cleanup standard of 200 mg/kg (ppm) or the applicable state standard, or TPHs in soil above EPA or State regulatory limits. For each site, prior to mobilizing to the site for the remedial activities, waste characterization samples shall be collected. Once these samples are analyzed, the proper landfill and disposal approvals shall be obtained. For each site, contaminated soil and/or equipment shall not be left at the site overnight unless previous permission is obtained by the contractor. Any equipment or material left at the site must be secured by the contractor and is not the responsibility of the government.


Adidtional details for requirement are found in the SOW.

More opportunities from Department Of Transportation → 6913G6 Volpe National Transportation System Cntr

Same awarding agency

NAICS: 336510
New
Federal
Refurbished and Used Boxcars
Solicitation # RFI-DOT-VOLPE-2026-001
The U.S. Department of Transportation, Volpe National Transportation Systems Center, is conducting market research via Request for Information RFI-DOT-VOLPE-2026-001 to identify the availability of refurbished and used 50-foot railway boxcars. These vehicles are required to safely transport ammunition and explosives in accordance with strict military safety regulations. The government is considering two options: refurbished cars with a minimum remaining life of 30 years per AAR standards, or used cars with all major systems, including brakes, couplers, and doors, fully functional. Technical requirements include a minimum load capacity of 70 tons, compliance with CFR Title 49 clearance limits, and registration in the AAR UMLER files. All work must be performed in an AAR qualified rail shop and adhere to specific painting and stenciling standards, including a yellow carbody, black underframe, and red United States Army stenciling. The contractor is responsible for all inspections and tests at their designated location, while final acceptance occurs at a CONUS U.S. Army rail base following an inspection for carrier damage. Interested respondents must submit a Statement of Capabilities, including their UEI number, CAGE code, and business size under NAICS 336510, to the designated points of contact by November 13, 2026, at 5:00 PM Eastern Time.
Railroad Rolling Stock Manufacturing

POSTED

about 18 hours ago

DEADLINE

in 17 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS