Design & Installation of Replacement Ship's Service and Emergency Switchboard for the US Coast Guard 154 WPC Class Cutter (Hulls 1101 through 1138)
Active
FederalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Place of Performance
Not specifiedSet-Aside
NONE
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Show more
AgencyDepartment of Homeland Security → United States Coast Guard
Contacts3 people available
OfficeN/A
Organization / AgencyDepartment of Homeland Security → United States Coast Guard
Office AddressN/A
Contacts
Full Description
Show more
Earlier 154 WPC class cutters, also known as the USCG Fast Response Cutter (FRC), utilize Ship’s Service and Emergency Switchboards designed and built by RAACI (Robichaux Automation and Control, Inc.). These are applicable to all Phase 1 cutters (Hulls 1101 thru 1132) and early Phase 2 cutters (Hulls 1133 thru 1138). These switchboards utilize Woodard EasyGen 3200 series controllers and Siemens 3VL circuit breakers and PLCs. The RAACI switchboards use older technology that is currently experiencing obsolescence and part supply issues. Hulls 1139 and up utilize switchboards designed and built by Point Eight Power, incorporated via an Engineering Change Proposal through the acquisition program. To improve commonality of systems and address obsolescence within the FRC fleet, the U.S. Coast Guard seeks to retrofit Hulls 1101 through 1138 with Point Eight Power switchboards. This requirement is a non-personal services contract to provide all labor, materials, services, equipment, supplies, power, accessories and facilities to upgrade the Ship’s Service and Emergency Generator Switchboards on the United States Coast Guard (USCG) 154’ Sentinel Class (154 WPC) cutters, Hulls 1101 through 1138.
Place of Performance: Design efforts will be accomplished at the Contractor's facility. Installations onboard two cutters (TBD) will be accomplished either at vessels homeport or during a shipyard availability.
Place of Performance: Design efforts will be accomplished at the Contractor's facility. Installations onboard two cutters (TBD) will be accomplished either at vessels homeport or during a shipyard availability.
Similar Contracts
Same NAICS industry code
More opportunities from Department of Homeland Security → United States Coast Guard
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
