Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on June 10, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Design-Bid-Build, P653 Dry Dock Flood Protection Improvements

Closed
N4008520R0063Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 7 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 8 hours ago

DEADLINE

in 25 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Portsmouth, VA, USA

Set-Aside

NONE

Documents

61

1588810 - Caisson Structural Notes (Dry Dock Flood Protection Improvements)

PDF, High priority: read this first50 pages · specifications
High

1588810 - Norfolk Naval Shipyard Dry Dock Flood Protection Improvements - Civil Utility Plan

PDF, High priority: read this first5 pages · specifications
High

1588810 - P-653 Dry Dock Flood Protection Improvements Boring Logs

PDF, High priority: read this first7 pages · specifications
High

1588810 P-653 Dry Dock Flood Protection Improvements Drawings

PDF, High priority: read this first15 pages · specifications
High

1588810 P-653 Dry Dock Flood Protection Improvements Drawings

PDF, High priority: read this first9 pages · specifications
High

1588810 - P-653 Dry Dock Flood Protection Improvements Geotechnical Information

PDF, High priority: read this first7 pages · specifications
High

Attachment C - Construction Experience Project Data Sheet

DOCX, High priority: read this first2 pages · past-performance
High

Attachment D - Past Performance Questionnaire (Form PPQ-0)

DOCX, High priority: read this first6 pages · past-performance
High

Attachment E - Small Business Subcontracting Plan Template

DOCX, High priority: read this first9 pages · supporting-documents
High

Attachment G - Small Business Participation and Commitment Strategy

DOCX, High priority: read this first4 pages · supporting-documents
High

Attachment H - Price Proposal Form (MILCON P-653)

DOCX, High priority: read this first3 pages · specifications
High

eProject 1588810 - Appendix A6 Reference Record Drawings

PDF, High priority: read this first18 pages · specifications
High

eProject 1588810 - Appendix A9 Reference Record Drawings

PDF, High priority: read this firstspecifications
High

eProject 1588810 - Appendix E: Utility Test Hole Logs

PDF, High priority: read this first24 pages · specifications
High

eProject 1588810 - Berth 20 Repairs Reference Record Drawings

PDF, High priority: read this first81 pages · specifications
High

eProject 1588810 - Dry Dock 3 Caisson Replacement Reference Drawings

PDF, High priority: read this first68 pages · specifications
High

eProject 1588810 - Dry Dock Flood Protection Improvements Reference Drawings

PDF, High priority: read this first39 pages · specifications
High

eProject 1588810 - P-614 Waterfront Utilities As-Awarded Drawings

PDF, High priority: read this first58 pages · specifications
High

eProject 1588810 - Repairs to Berths 16/17 As-Awarded Drawings

PDF, High priority: read this first39 pages · specifications
High

N40085-19-C-9014 Dry Dock 4 Renovation - Appendix A 13

PDF, High priority: read this first58 pages · specifications
High

N4008520R0063 Amendment 0001

PDF, High priority: read this first7 pages · amendment
High

N4008520R0063 Amendment 0002 - Dry Dock Flood Protection Improvements

PDF, High priority: read this first28 pages · amendment
High

N4008520R0063 Amendment 0003 - Dry Dock Flood Protection Improvements

PDF, High priority: read this first2 pages · amendment
High

N4008520R0063 Amendment 0004

PDF, High priority: read this first2 pages · amendment
High

N4008520R0063 Amendment 0005 - Dry Dock Flood Protection Improvements

PDF, High priority: read this first58 pages · amendment
High

N4008520R0063 Amendment 0006 - Dry Dock Flood Protection Improvements

PDF, High priority: read this first3 pages · amendment
High

P-653 Dry Dock Flood Protection Improvements - Appendix A2

PDF, High priority: read this firstspecifications
High

P-653 Dry Dock Flood Protection Improvements - Below Grade Demolition Plan

PDF, High priority: read this first5 pages · specifications
High

P-653 Dry Dock Flood Protection Improvements - CS101

PDF, High priority: read this first8 pages · specifications
High

P-653 Dry Dock Flood Protection Improvements - CS110

PDF, High priority: read this first13 pages · specifications
High

P-653 Dry Dock Flood Protection Improvements - Drawing 1588810

PDF, High priority: read this first27 pages · specifications
High

P-653 Dry Dock Flood Protection Improvements - Drawing CS111

PDF, High priority: read this first6 pages · specifications
High

P-653 Dry Dock Flood Protection Improvements - Drawings 1588810

PDF, High priority: read this first16 pages · specifications
High

P-653 Dry Dock Flood Protection Improvements - Drawings G-101, G-102, G-103, G-106

PDF, High priority: read this first4 pages · specifications
High

P-653 Dry Dock Flood Protection Improvements - Drawings G-109 to G-112

PDF, High priority: read this first4 pages · specifications
High

P-653 Dry Dock Flood Protection Improvements - Survey Notes

PDF, High priority: read this first8 pages · specifications
High

P-653 Dry Dock Flood Protection Improvements - Title Sheet

PDF, High priority: read this first10 pages · specifications
High

Project 1588810 - Appendix F2: Electrical/Telecommunications Manhole Inspection Notes

PDF, High priority: read this first74 pages · specifications
High

Project 1588810 - Appendix F4: Electrical/Telecommunications Manhole Inspection Notes

PDF, High priority: read this first91 pages · specifications
High

Project 1588810 - Appendix F5: Electrical/Telecommunications Manhole Inspection Notes

PDF, High priority: read this first92 pages · specifications
High

Project 1588810 - Appendix F6: Electrical/Telecommunications Manhole Inspection Notes

PDF, High priority: read this first79 pages · specifications
High

Project 1588810 - Electrical/Telecommunications Manhole Inspection Notes

PDF, High priority: read this first84 pages · specifications
High

Project 1588810 - Electrical/Telecommunications Manhole Inspection Notes

PDF, High priority: read this first87 pages · specifications
High

Attachment F - Small Business Subcontracting Record

DOCX, Low priority3 pages · past-performance
Low

Attachment I - ODP Form

XLS, Low priority4 pages · other
Low

Attachment J - CVS-CIA Blank Spreadsheet

XLSX, Low priority1 page · other
Low

eProject 1588810 Appendix A1 - Reference Record Drawings

PDF, Low priority11 pages · specifications
Low

eProject 1588810 - Appendix A4 Reference Record Drawings

PDF, Low priority35 pages · specifications
Low

N4008520R0063 Pre-Proposal Inquiry Log Template

XLSX, Low priority1 page · q-and-a
Low

N40085-20-R-0063 Site Visit Sign-In Sheet

DOCX, Low priority2 pages · other
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseClosed
Posted

Sources Sought

Type Changed

Sources Sought → Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jun 2, 2020 to Jun 16, 2020.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navfacsyscom Mid-Atlantic
Contacts1 person available
OfficeNORFOLK, VA, 23511-0395, USA
Office AddressNORFOLK, VA, 23511-0395, USA

Full Description

Show more
The project will construct a permanent flood wall to protect Dry Docks 1, 2, 3, and 4, associated facilities, infrastructure and equipment from flooding from the Elizabeth River. Flood wall shall be cast-in-place reinforced concrete wall on shallow foundation and it shall be supported on soil treated with subsurface grout injection. The project will modify existing Dry Docks 1 and 3 caisson gunwales, construct caisson seat extensions for Dry Docks 1, 2, and 3, and remove existing capstans and construct removable capstans on new foundations.

More opportunities from Department Of Defense → Navfacsyscom Mid-Atlantic

Same awarding agency

NAICS: 236220
New
Federal
Design-Bid-Build (DBB) SOF Marine Raider Facilities Complex, Marine Corps Base (MCB) Camp Lejeune, North Carolina
Solicitation # N4008526R0138
Solicitation N4008526R0138 is a Firm-Fixed Price Design-Bid-Build construction contract issued by NAVFAC Mid-Atlantic for the P-1550 SOF Marine Raider Battalion Company and Team Facilities at Marine Corps Base Camp Lejeune, North Carolina. The project scope involves the construction of approximately 228,200 square feet of facilities, including a 73,400 square foot Operations, Supply, Communications, and Intel facility; 127,200 square feet of Company HQ and Team Facilities; and 17,600 square feet of Company Storage Buildings. The structures will be single-story steel frame buildings with brick veneer, standing seam metal roofs, and translucent wall panels. Critical site work includes pile foundations, surcharged sites, wetlands mitigation, and storm water best management practices. The performance period is 1,246 calendar days from the date of award receipt. The acquisition is an unrestricted full and open competition evaluated using a tradeoff process to determine the best value. Evaluation factors include corporate experience, safety records (DART and TCR rates), past performance, and small business utilization, with these non-price factors combined being approximately equal in importance to the price proposal. The contract includes specific requirements for CMMC Level 1 cybersecurity compliance, the use of the Wide Area WorkFlow system for invoicing, and the mandatory hosting of a formal partnering session within 35 days of award. Optional line items for Audio Visual systems and Furniture, Fixtures, and Equipment are also included in the price schedule.
Commercial and Institutional Building Construction

POSTED

about 12 hours ago

DEADLINE

in about 18 hours
View Details
NAICS: 561210
New
Federal
Bullet Traps Operation and Maintenance/Lead Cleaning for Breach and Shooting Houses
Solicitation # N4008527R0025
Navfacsyscom Mid-Atlantic is issuing a sources sought notice to identify potential offerors for a contract involving the operation, maintenance, and lead cleaning of bullet traps, breach houses, and shooting houses at Marine Corps Base Camp Lejeune and Marine Corps Air Station New River in Jacksonville, North Carolina. The scope of work includes weekly maintenance such as system modifications, repairs to deflectors and deceleration chambers, painting, and the removal of lead-contaminated filters. Additionally, the contractor must perform quarterly and semi-annual lead abatement, which involves removing contaminated dust from interior surfaces and targets, collecting samples, and providing analysis from a certified laboratory. The government intends to award a firm fixed price, indefinite quantity or non-recurring contract consisting of a one-year base period and four twelve-month option years, not to exceed 60 months total. The requirement is categorized under NAICS code 561210 and is intended as a small business set-aside, specifically seeking HUBZone, 8(a), Service-Disabled Veteran Owned, and Women Owned Small Businesses. Qualified personnel must possess specific certifications, including OSHA and HAZMAT qualifications, as well as commercial Class A CDL, welder, and electrician licenses. Contractors must adhere to all federal, state, local, and DOD hazardous waste regulations and certify that all materials removed from bullet traps are inert prior to disposal. A critical performance requirement is a 24-hour response time for immediate maintenance issues. Interested parties must be registered in SAM.gov with a Unique Entity ID and be capable of using Wide Area Workflow for electronic invoicing.
Facilities Support Services

POSTED

about 12 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
Federal
N4008526R0228 DESIGN-BUILD (DB), REPAIR OTC DORM KING HALL BLDG 291, NAVAL STATION NEWPORT RI, NEWPORT RHODE ISLAND
Solicitation # N4008526R0228
Solicitation N4008526R0228 is a design-build task order issued by Naval Facilities Engineering Command Mid-Atlantic for the major renovation of the King Hall OTC Dorm Building 291 at Naval Station Newport, Rhode Island. The project involves a four-story reinforced concrete structure of approximately 172,000 square feet. The scope of work includes comprehensive upgrades to outdated mechanical, plumbing, electrical, and life safety systems, as well as fire protection and detection upgrades. Exterior improvements consist of full roof replacements, masonry repairs, and the replacement of windows and storefront entrances. Additionally, the project requires hazardous materials abatement, the construction of a new passenger elevator, seismic structural improvements, interior reconfiguration to include new multi-purpose areas and the relocation of the SMART clinic, and the installation of a new fire lane. The estimated contract value ranges between 100 million and 250 million dollars, with a total performance period of 1,278 calendar days from the date of award. Award will be based on a best value tradeoff process evaluating price, technical solution, and past performance. The contractor is responsible for all existing condition reviews, investigations, and design calculations to ensure compliance with current Unified Facilities Criteria and building codes, with design development submissions required at the 65 percent level. Key administrative details include liquidated damages set at 14,088.62 per day and a bid guarantee of 20 percent of the proposed price, capped at 3 million dollars. Proposals must be submitted electronically via the PIEE Solicitation Module in PDF format.
Commercial and Institutional Building Construction

POSTED

about 12 hours ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS